UT Students Can Start/Stop KUB Utilities online!
Click here for more information.

An outage has been rescheduled for the University Center for 5:30 a.m. to 6:30 a.m. Friday, December 19. The outage will encompass steam, air conditioning, building heat, electric power, elevators and the fire alarm system. The purpose of this outage is to disconnect temporary construction power for the new U.C. For questions, please contact Cesar Penalba at 4-7769.

back to top



Fire Alarm Testing:


None at this time.









































back to top



Electrical Outages:


An outage has been rescheduled for the University Center for 5:30 a.m. to 6:30 a.m. Friday, December 19. The outage will encompass steam, air conditioning, building heat, electric power, elevators and the fire alarm system. The purpose of this outage is to disconnect temporary construction power for the new U.C. For questions, please contact Cesar Penalba at 4-7769.

back to top



Heating & Air Conditioning:


An outage has been rescheduled for the University Center for 5:30 a.m. to 6:30 a.m. Friday, December 19. The outage will encompass steam, air conditioning, building heat, electric power, elevators and the fire alarm system. The purpose of this outage is to disconnect temporary construction power for the new U.C. For questions, please contact Cesar Penalba at 4-7769.

An outage has been scheduled for Neyland Thompson Sports Center for 10:00 a.m. to 4:30 p.m. Monday, December 29th. The outage will encompass steam, water (hot and cold) and building heat. The purpose of this outage is to fix a steam leak on the main line to the Neyland Sports Center. For question, please contact Wayne Stalans or Wes Willoughby at 974-3401.

back to top



Water/Steam Outages:


An outage has been rescheduled for the University Center for 5:30 a.m. to 6:30 a.m. Friday December 19. The outage will encompass steam, air conditioning, building heat, electric power, elevators and the fire alarm system. The purpose of this outage is to disconnect temporary construction power for the new U.C. For questions, please contact Cesar Penalba at 4-7769.

An outage has been scheduled for Neyland Thompson Sports Center for 10:00 a.m. to 4:30 p.m. Monday, December 29th. The outage will encompass steam, water (hot and cold) and building heat. The purpose of this outage is to fix a steam leak on the main line to the Neyland Sports Center. For question, please contact Wayne Stalans or Wes Willoughby at 974-3401.

An outage has been scheduled for the Brehm Animal Science and Food Science building for 8:00 a.m. to 4:00 p.m. Saturday, January 10th. The outage will encompass water (hot and cold). The purpose of this outage is to install valves to the building`s hot and cold water supply. For questions, please contact Wes Willoughby or Todd Curnutt at 974-3401.

back to top



The Facilities Services Department welcomes suggestions for ways in which services can be provided more efficiently and for additional services which might be provided. Such suggestions should be made to the Executive Director  of the Facilities Services Department.



 

Contribute to a big idea. Give to UT.

The University of Tennessee, Knoxville. Big Orange. Big Ideas.

Knoxville, Tennessee 37996 | 865-974-1000
The flagship campus of the University of Tennessee System