| BUILDING | DESCRIPTION | DATE APPROVED | SCHED TO BEGIN | SCHED TO COMPLETE | % COMPLETE | PROJECT NUMBER |
| 11th Street Parking Garage | Install photovoltaic system for research on 11th Street Parking Garage. Provide raceways to Min Kao. | 5/29/2013 | | | 0 | D-13561 |
| 1643 Cumberland Avenue - Commercial Bldg | McMillens Bookstore & Dynasty Rest. - Repair/Replace/Recover the Built-up roof (XYZ) | 3/28/2013 | | | 1 | D-13287 |
| 1817 Melrose Avenue | Install blinds on windows in room 201 at 1817 Melrose Avenue. | 5/2/2013 | | | 1 | D-13533 |
| 2121 Stephenson Drive | Redesign the layout of staff area 23 located at the corner of Pat Head Summitt and Andy Holt Blvd. This should include any surfacing coating and restriping of the parking area. The goal is to provide design options for approval that will minimize the loss of existing parking spaces yet achieve more room for people to enter/exit threir parked vehicles. (S13) | 2/12/2013 | 7/30/2013 | 8/9/2013 | 1 | D-13429 |
| 2121 Stephenson Drive | Pave area 66 located off Fletcher Luck Lane near Plant Sciences Annex B. | 5/9/2011 | | | 1 | D-11473 |
| 2121 Stephenson Drive | Reference Environmental Health & Safety Report dated 8/18/09. Estimate cost to repair various trip hazards identified in parking area S14 near the Warehousing offices. Specifically, raised utility boxes, overturned wheel stops, and loose covers to hole. | 11/11/2010 | | | 1 | D-11194 |
| AG CAMPUS | Install Lighting for Rugby Field at Fulton Bottoms. (S13) | 1/11/2012 | 6/17/2013 | 8/30/2013 | 1 | D-12272 |
| Alpha Gamma Rho Fraternity House | Alpha Gamma Rho Fraternity - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13240 |
| Alumni Memorial Building | Replace door sign from previous occupant of G026 Alumni Memorial Building with a new sign that names the current occupant. NEW SIGN: MFLL Lecturers | 6/5/2013 | | | 0 | D-13579 |
| Andy Holt Tower | Create new VC space beside conference room on 4th floor. (S13) | 12/31/2012 | 3/20/2013 | 5/10/2013 | 85 | D-13375 |
| Andy Holt Tower | Andy Holt Tower - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13242 |
| Art and Architecture Building | Art & Architecture Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13243 |
| Art and Architecture Building | Replacement or possible upgrade for our current swipe card system at 2nd floor bridge stairs, stairs at 1st level atrium; loading dock area at A & A. Installing a new swipe card system is in the main administrative office room 224 (please see attached documentation and correspondence from Captain Severs & Tim York). (CC) | 7/5/2012 | | | 0 | D-13039 |
| Art and Architecture Building | Patch & Paint room 204 A & A. | 4/26/2013 | 6/23/2013 | 6/24/2013 | 1 | D-13523 |
| Art and Architecture Building | Renovations for McCarty Auditorium, room 109. (S13) | 1/11/2013 | 5/8/2013 | 8/12/2013 | 10 | D-13391 |
| Art and Architecture Building | Remove graffiti from the exterior and interior of A & A and re-stain or paint as necessary. (S13) | 4/22/2013 | | | 5 | D-13512 |
| Art and Architecture Building | Request for cleaning & removal of graffiti off the building at the entrance 2nd floor bridge, dock area and lower levels, testing of small area to make certain the building is not damage with any chemicals before cleaning entire building. | 5/9/2012 | | | 0 | D-12480 |
| Art and Architecture Building | install the following sleeves in A & A: 4" conduit in room 413A - This will be 1 continuous pipe out into the hallways outside 413A through the floor to 309A1. 4" sleeve through the floor of 409C down outside 307; 4" Sleeve outside 307 dow to 215E; 4" sleeve down from 215E to 105A; 4` sleeve from 231 down to 103B; 1" sleeve 119 through wall into 121. | 3/28/2013 | 5/27/2013 | 6/14/2013 | 1 | D-13471 |
| Austin Peay Building | Installation of a projector mount, power for a projector and core drill under the table with conduit to the projector in Austin Peay 411. Estimator should contact Mike Berger in OIT for more details regarding what is needed. Would like to have work complete in summer 2013, but pay from FY 13 funds. | 6/12/2013 | | | 0 | D-13590 |
| Austin Peay Building | Paint the open suite of 215 and room 215 D, E, & G. Depending upon approval of the estimate, this work should be completed in June or early July of this summer, but we will be using funds from this fiscal year. | 6/12/2013 | | | 0 | D-13591 |
| Austin Peay Building | Reconfigure Austin Peay rooms 203, 203A, 205B, 225, 225A, 225B, 225C, 226E, 226F, 226G1, 227, 227A, 227B, 227C, 227E, 227F as shown on drawing. Make necessary changes in lighting, HVAC, door location, electrical, paint and ceiling. Paint & replace carpet in rooms 207A, 207B, 207C,205C, hall 207W, 224, 226B, 226C, 226D. | 6/12/2013 | | | 0 | D-13592 |
| Austin Peay Building | Austin Peay Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13244 |
| Auxiliary Services Building | Auxiliary Services Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13245 |
| Ayres Hall | Ayres Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13246 |
| Ayres Hall | Add additional cubicle area near the waiting area for an additional graduate student space in 313 Ayres Hall. Dean Wessels has the measurements. Would like this work completed at or around the same time as the cubicles additions for Ayres 327. | 3/27/2013 | | | 5 | D-13484 |
| Ayres Hall | Add an additional cubicle space similar to the professional advisors` office cubicle in Ayres 313. The first space on the left as you enter 327 seems like the best spot. The 313 cubicle walls are over 6`5" and if possible we would like the walls for 327 to be that high as well. | 3/27/2013 | | | 5 | D-13485 |
| Berry Hall | Berry Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13247 |
| Biosystems Engineering and Soil Science Labs Building | Install new furniture in room 276 Biosystems Eng (computer tables & chairs) for CASNR computer lab. Would like to increase capacity from 24 to 32. | 4/23/2013 | | | 1 | D-13515 |
| Biosystems Engineering and Soil Science Labs Building | Classroom Upgrade 2012 - BEES 268/270 (S13) | 1/22/2013 | 5/8/2013 | 8/12/2013 | 5 | D-13403 |
| Biosystems Engineering and Soil Science Labs Building | Biosystems Eng & Soil Sci Labs - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13248 |
| Biosystems Engineering and Soil Science Labs Building | Replace roofs damaged in hailstorm on 4/27/11 at BEES Office Building. (BU and tile) (Ins) (Cap/Repl BU) (XYZ) | 7/2/2012 | | | 1 | D-13016 |
| Black Cultural Center | Replace fan shrouds, or replace fans damaged in hailstorm on 4/27/11 at Black Cultural Center. | 7/31/2012 | | | 0 | D-13017 |
| Black Cultural Center | Clean windows throughout the Black Cultural Center. | 5/8/2013 | | | 0 | D-13540 |
| Black Cultural Center | Black Cultural Center has 4 sandwich boards fro promoting programs. Please provide 8 plexiglass covres measuring 2`x4` to cover the promotional advertisements that will be displayed on these boards. Please provide 8, 2`x3` plexiglass covrs for the sandwich boards. When cuts, the plexiglass covers will need to be screw-mounted to each sandwich board to provide some weather protection. | 6/7/2013 | | | 0 | D-13584 |
| Blount Hall | Re-key offices on 4th floor of Blount Hall. | 5/6/2013 | | | 1 | D-13537 |
| Blount Hall | Electrical work for 4th floor of Blount Hall. Pigtails removed and replaced with duplex outlets in 404, 406, 409 & 410. Solid wall plate covers in 408, 409 & 410. | 4/23/2013 | 5/24/2013 | 6/21/2013 | 95 | D-13517 |
| Blount Hall | Install glass wall with double doors on the ground floor of Blount Hall. The glass would partially separate A001 from A004. Please see Beth Neilson & Renee Thomas when arriving. See attached for more detail. | 4/22/2013 | | | 0 | D-13510 |
| Blount Hall | Blount Hall rooms 401, 401A, 401B, 401C, 402, 403, 403A, 403B fill holes and paint, deep clean carpets to remove stains. Rooms 401B & 401A move doorways so that exit will be in main corridor (416) and not 401. Data, telecom, and electrical as needed for modular furniture. | 3/28/2013 | 5/1/2013 | 6/20/2013 | 95 | D-13487 |
| Blount Hall | Blount Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13249 |
| Brenda Lawson Athletic Center | Brenda Lawson Athletic Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13250 |
| Brenda Lawson Athletic Center | Electric Shop to please install proxy readers (6) in Brenda Lawson Center. | 7/13/2011 | 10/29/2012 | 5/31/2013 | 90 | D-12031 |
| Burchfiel Geography Building | Classroom Upgrade 2012 - Burchfiel Geography 101 (S13) | 12/17/2012 | 5/8/2013 | 8/12/2013 | 10 | D-13359 |
| Burchfiel Geography Building | Pour slab to create storage spaces in unfinished area room 204. (S13) | 5/19/2010 | 6/17/2013 | | 1 | D-10462 |
| Burchfiel Geography Building | Burchfiel Geography Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13251 |
| Business Incubator | Business Incubator - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13252 |
| Butler Building | Replace metal roof damaged in hailstorm on 4/27/11 at Butler Building. (Ins) | 7/2/2012 | | | 0 | D-13018 |
| CAMPUS | Spring Clean up 2013 (S13) | 3/25/2013 | 4/17/2013 | 8/2/2013 | 75 | D-13483 |
| CAMPUS | Repair/replace the roof at 1643 Cumberland Avenue. (XYZ) | 2/14/2013 | | | 0 | D-13447 |
| CAMPUS | Green Project - Student Interns for FY 2012-2013 | 7/13/2012 | | | 10 | D-13049 |
| CAMPUS | Blanket: Disabilities Accommodations (FY 2012-2013) | 7/1/2012 | 7/1/2012 | 6/30/2013 | 10 | D-13002 |
| CAMPUS | Clean/polish all Code Blue phone units on campus once annually. (S13) | 8/29/2012 | | | 0 | D-13146 |
| CAMPUS | Fraternity Park- Install exterior lighting (front and rear) and security cameras for exterior coverage. (CC) (S13) | 9/11/2012 | 3/19/2013 | 8/30/2013 | 30 | D-13148 |
| CAMPUS | Fraternity Park - Improve landscaping to bring the Park up to Landscape Master Plan standards. Includes: Addition of Understory Trees and Accent Planting, Irrigation of Lawn and Landscape, Site Amenitites: (13) Site Benches, (9) Trash Receptacles, (25) Additional Trees, Site Amenitites: (10) Site Benches, renovate ballcourts, and Sidewalk Repairs. (CC) (S13) | 9/11/2012 | | | 5 | D-13155 |
| CAMPUS | Fraternity Park - Relocate and rework dumpster locations. (CC) (S13) | 9/11/2012 | | | 1 | D-13156 |
| CAMPUS | Fraternity Park - Install entrance wall/sign(s) similar to the other Campus main entrances. (CC) (S13) | 9/11/2012 | | | 1 | D-13157 |
| CAMPUS | Resurface/Striping large parking lot adjacent to Baseball Stadium. (S13) | 12/19/2012 | | | 1 | D-13323 |
| CAMPUS | Programming for Academic Building 1 (Melrose site) | 7/13/2012 | | | 5 | D-13056 |
| CAMPUS | GREEN PROJECT- MOG Education, Publicity & Support - Year 8 (2012-2013) | 7/11/2012 | | | 10 | D-13046 |
| CAMPUS | Blanket - Annual maintenance for water bottle filling fountains only. (FY1013 and FY 2014) | 1/11/2013 | | | 0 | D-13392 |
| CAMPUS | Green Project - Install flash tanks to trap high pressure traps to low side of building systems, allowing venting to low side steam system, and trappping then to condensate receivers. | 1/11/2013 | | | 0 | D-13393 |
| CAMPUS | Green Project - Install water bottle filling stations. (2012-2014) (years 1 and 2 of 5) (Communications, Humanities, Nursing) | 1/11/2013 | | | 1 | D-13394 |
| CAMPUS | Green Project - Reinsulate steam lines. (2012-2014) (years 1 and 2 of 5) | 1/11/2013 | | | 1 | D-13395 |
| CAMPUS | Green Project - Low flow plumbing fixtures. (2012-2014) (years 1 and 2 of 5) | 1/11/2013 | | | 0 | D-13396 |
| CAMPUS | Blanket - general maintenance in classrooms to include replacing markers, erasers, seating repairs, painting, etc. (FY13) | 1/29/2013 | | | 50 | D-13410 |
| CAMPUS | Servicing & Testing kitchen hoods and ductwork for Aramark (FY 12-13) | 3/28/2013 | | | 10 | D-13428 |
| CAMPUS | Programming for Class Lab 1 to be built at Cumberland and 13th Street. | 7/13/2012 | | | 5 | D-13051 |
| CAMPUS | CONTINUATION OF D-10099 Replace transformers Perkins Hall, Andy Holt Tower, Communications, Humanities and McClung Tower. (CHANCELLOR-NR11) (CC) (S13) | 6/12/2013 | | | 10 | D-13593 |
| CAMPUS | CONTINUATION OF D-10100 Upgrade lighting in Student Services, Communications, HPER, and Bailey Education. (CHANCELLOR-NR11) (NR11-$4.84M) (CC) | 6/12/2013 | | | 50 | D-13594 |
| CAMPUS | Improvements to Campus Entrances. Refurbising of plantings, lighting, and irrigation. (S13) | 5/1/2013 | 5/1/2013 | | 5 | D-13527 |
| CAMPUS | Site preparation for new Facilities Services Complex at 2200 Sutherland Avenue. (S13) | 5/30/2013 | | | 0 | D-13567 |
| CAMPUS | Use of City of Knoxville´s John Clabo Field at Duff Park during a time period that Fulton Bottoms will be occupied by KUB. | 9/28/2011 | | | 10 | D-12147 |
| CAMPUS (Parking Lot N-16) | Pave N-16 Lot (corner of Lake and 16th Street) | 5/9/2011 | | | 1 | D-11474 |
| Carrick Hall North | Carrick Hall North - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13253 |
| Carrick Hall South | Carrick Hall South - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13254 |
| Ceramics Annex | Replace roof and skylight at Ceramics Annex. (Ins) (XYZ) | 5/1/2012 | | | 0 | D-12447 |
| Clarence Brown Theatre | Rebuild the storage room, dust collector room and sound and lighting room at Clarence Brown Theatre out of non combustible material. (CC) | 2/20/2013 | | | 0 | D-13461 |
| Clarence Brown Theatre | Rebuild trapped portion of stage floor at Clarence Brown Theatre. Existing floor is showing signs of weakness and failure due to 41 years of use. See Architectural Plate T1 (attached) for details on the existing system. Some portions of the framing and telespar supports may be usable, but a substantial amount will need to be replaced. (CC) | 2/20/2013 | | | 0 | D-13460 |
| Clarence Brown Theatre | Replace HVAC system in Lab Theatre with system sufficient for current needs at Clarence Brown Theatre. (CC) | 2/20/2013 | | | 0 | D-13458 |
| Clarence Brown Theatre | Replace HVAC in basement of Clarence Brown Theatre. (CC) | 2/20/2013 | | | 0 | D-13457 |
| Clarence Brown Theatre | Clarence Brown Theatre - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13255 |
| Clarence Brown Theatre | Replace wooden ramp to Lab Theatre with permanent ramp. (ADA) (NO LABOR) (S13) | 8/17/2012 | | | 1 | D-13108 |
| Clarence Brown Theatre | Provide shunt trip for sound system when fire alarm activates at Clarence Brown Theatre. (CC) | 2/20/2013 | | | 0 | D-13456 |
| Clarence Brown Theatre | Provide fire protection system for stage area and proscenium including fire separation curtain and re-initiation of deluge system at Clarence Brown Theatre. (CC) | 2/20/2013 | | | 0 | D-13459 |
| College of Nursing | College of Nursing - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13257 |
| College of Nursing | Renovation of Ladies Restrooms. (S13) | 10/17/2011 | 5/15/2013 | 8/1/2013 | 40 | D-12181 |
| College of Nursing | Move the KARDEX filing cabinet into the maon office area (room 203 College of Nursing). Repair walls and carpet as needed in order to convert 203B into another Office. | 5/8/2013 | | | 0 | D-13542 |
| Communications and University Extension Building | Install magnetic locks and card readers to control access to room 21, 26 (consumable inventory warehouse) and 30 (classroom upgrade inventory warehouse) in Communications Building. | 1/31/2013 | | | 1 | D-13420 |
| Communications and University Extension Building | Communications - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13258 |
| Communications and University Extension Building | Monitors, computer networking, and related electrical for lobby renovation. Includes work required for completion of overall lobby renovation. (S13) | 8/31/2011 | 5/14/2012 | 3/29/2013 | 95 | D-12121 |
| Communications and University Extension Building | Estimate for work as designed in T-10514 on 4th floor Lobby in Communication outside the School of Information offices, Suite 451. Per designs by Keith Downen and team finalized 12/12/12. | 5/15/2013 | | | 0 | D-13554 |
| Communications and University Extension Building | Replace current light sensor switches to adjustable dimmer switches that have factory presets, on or off, and allows fine adjustments form 0% to 100% in rooms 455, 456, 457 Conference at Communications. | 3/13/2013 | | | 0 | D-13476 |
| Communications and University Extension Building | Remove existing carpet, install new carpet and paint room 442 Communications. | 5/3/2013 | | | 1 | D-13534 |
| Conference Center Building | Blanket: Miscellaneous work as needed (FY 2012-2013) | 7/1/2012 | 7/1/2012 | 6/30/2013 | 10 | D-13001 |
| Conference Center Building | Renovations for the Psychology Clinic at the Conference Center Building. (CC) (S13) | 9/19/2012 | 5/8/2013 | 7/28/2013 | 40 | D-13167 |
| Conference Center Building | Replace the damaged concrete sidewalk around the exterior perimeter of the Conference Center to match existing exposed aggregate concrete. (CC) (S13) | 9/11/2012 | | | 1 | D-13128 |
| Crops Genetic Laboratory | Replace roof at Crops Genetics. (Review Tile) (Repl slate) | 5/1/2012 | | | 0 | D-12448 |
| Dabney-Buehler Hall | Classroom Upgrade 2012 - Buehler Hall 476 (S13) | 12/17/2012 | 5/8/2013 | 8/2/2013 | 10 | D-13358 |
| Dabney-Buehler Hall | Classroom Upgrade 2012 - Buehler Hall 475 (S13) | 12/17/2012 | 5/8/2013 | 8/12/2013 | 10 | D-13360 |
| Delta Tau Delta Fraternity House | Delta Tau Delta Fraternity - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13261 |
| Dougherty Engineering Building | Dougherty Repairs - Phase II (CONTINUATION OF D-10324) (S13) | 6/4/2013 | | | 5 | D-13575 |
| Dougherty Engineering Building | Install swipe card access to room 337 & 227 Dougherty Engineering. | 10/3/2012 | | | 10 | D-13191 |
| Dougherty Engineering Building | Paint and carpet room 403 Dougherty by 6/28/13. | 6/6/2013 | | | 1 | D-13580 |
| Dougherty Engineering Building | Dougherty Engineering - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13262 |
| Dougherty Engineering Building | Dougherty 407 is a three-room suite and all three rooms need to be painted and the carpet to be cleaned before 6/28/13. | 6/5/2013 | | | 1 | D-13576 |
| Dougherty Engineering Building | Paint & recarpet room 410 Dougherty Engineering. Would lide a padding for the carpet if possible. | 6/17/2013 | | | 0 | D-13600 |
| Dougherty Engineering Building | Install door with window kit and Simplex lock (punch code lock) on room 211 Dougherty Engineering. | 4/3/2013 | 5/14/2013 | 6/30/2013 | 97 | D-13488 |
| Dougherty Engineering Building | Renovations to room 110 Dougherty Engineering Building. (S13) | 3/21/2013 | 5/1/2013 | 7/31/2013 | 70 | D-13481 |
| Dougherty Engineering Building | Purchase and mount three glass marker boards on the north wall of Dougherty room 421. If available, the center board should be 7 feet wide and the left and right boards should be 6 feet wide. Due to conduit mounted on the wall, the boards will have to be stood out for the wall. A projection screen switch will need to be moved to the west wall. Pen and eraser trays should be included with each board. | 4/9/2013 | 6/11/2013 | 6/13/2013 | 97 | D-13501 |
| Dunford Hall | Dunford Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13263 |
| Early Learning Center | Security buzzer to all outside door for ELC which would trigger an ELC personnel to have access. Please look into other options like: key code system or key scan card system. Install mag locks and card readers on two classroom entry doors. | 8/15/2012 | 3/25/2013 | 6/21/2013 | 95 | D-13104 |
| Early Learning Center - Research & Practice | Security buzzer (soft sound) to all outside doors of Early Learning Center which would trigger an inside ELC personnel to allow access into the building. Please rush for security reasons. | 8/14/2012 | 3/25/2013 | 6/21/2013 | 95 | D-13098 |
| Early Learning Center - Research & Practice | Replace built-up roof, windows, and masonry repairs at ELC-1206 White Avenue. (XYZ) | 5/1/2012 | | | 1 | D-12460 |
| Earth and Planetary Sciences Building | Classroom Upgrade - Earth & Planetary Sciences room 405 (S13) | 1/22/2013 | 5/8/2013 | 8/12/2013 | 10 | D-13406 |
| Earth and Planetary Sciences Building | Classroom Upgrade 2012 - EPS 302 (S13) | 1/22/2013 | 5/8/2013 | 8/12/2013 | 5 | D-13405 |
| East Skybox & Pressbox | East Skybox & Pressbox - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13264 |
| Ellington Plant Sciences Building | Gas lines to be installed in 105 Ellington Plant Sciences to be connected to a clean bench. | 4/22/2013 | 5/22/2013 | 6/14/2013 | 95 | D-13511 |
| Ellington Plant Sciences Building | Programming for Ellington Plant Sciences. | 7/13/2012 | | | 5 | D-13055 |
| Estabrook Hall | Network/Telephone to install 11 circuits in Estabrook. Rooms 100, 101, 102, 104A, 104B, 105, 105B, 105 Hallway all need 1 circuit Room 103 needs 2 circuits. The circuits will originate at one of the network closets depending on which loction is easier to access. Ben Rayfield & Justin Forbes will be contacts for placement of the circuits. | 5/14/2013 | 6/10/2013 | 6/28/2013 | 1 | D-13553 |
| ETREC Johnson Animal Research Building | Replace roofs damaged in storms of 4/25/11 & 4/27/11 at KES Johnson Animal Research. (Ins) (Cap/Rpl) (Metal and BU) (XYZ) | 7/2/2012 | | | 1 | D-13011 |
| Ferris Hall | Ferris Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13265 |
| Ferris Hall | Install restrooms on second floor Ferris Hall. (SFMO) (ADA) (NO LABOR) | 11/14/2011 | | | 95 | D-12217 |
| Food Safety and Processing Building | Replace roof at Food Safety. (Ins) (Cap/Repl) (Review tile) | 5/1/2012 | | | 0 | D-12450 |
| Frank G. Clement Hall | Frank G Clement Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13256 |
| Frank H. McClung Museum of Natural History and Culture | Classroom Upgrade 2012 - McClung Museum 63 (S13) | 1/22/2013 | 5/8/2013 | 8/12/2013 | 1 | D-13404 |
| Frank H. McClung Museum of Natural History and Culture | McClung Museum - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13285 |
| Gibbs Hall | Gibbs Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13266 |
| Gibbs Hall | Contract with Del-Air to replace electric control valves, thermostats and sensors as identified by building Maintenance at Gibbs Hall. Currently identified 41 units that need work. | 3/20/2013 | | | 1 | D-13480 |
| Golf Team Facility | Plumbing/Facilities Services to install hot water heater and a utility sink at he Mack & Jonnie Day Golf Practice Facility (2045 Alcoa Highway). Contact Mark Gossett @ 209-0907 | 4/3/2013 | | | 0 | D-13490 |
| Goodfriend Tennis Center | Install and set up new alarm system (maglocks) to work properly throughout Goodfriend Tennis Center. | 9/24/2012 | | | 1 | D-13175 |
| Greve Hall | Electrical outlets needed on walls without whiteboards in the following spaces in Greve Hall: 401-405; 407; 414-417; 422-426; 428-429; 431-433; 435-439; 431-433; 435-439. Original PP28 attached since this was part of our original renovations that needed to be done. | 6/17/2013 | | | 0 | D-13604 |
| Greve Hall | Replace broken windows in Greve Hall room 111. | 6/12/2013 | | | 0 | D-13589 |
| Greve Hall | Greve Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13267 |
| Greve Hall | Replace door on 111 Greve Hall with fire rated door. 32" door same as other new doors on first floor. Need this done as soon as possible without rush charge. | 4/4/2013 | 6/11/2013 | 6/28/2013 | 1 | D-13496 |
| Greve Hall | Additional power outlets needed in Greve Hall 119 at counter height. This room is our materials library and the additional power supply is needed to charge and plug equipment as needed. Kip Thorson @ 974-9132 is our Materials Manager and should considered contact person. Would like to get on Fiscal Year 2013 budget. | 4/4/2013 | | | 0 | D-13495 |
| Greve Hall | Correct heat and air issue in room 111 Greve Hall. | 4/15/2013 | | | 0 | D-13505 |
| Greve Hall | Greve Hall; install a system that will allow occupants to legally prop open office doors without violating fire code. Two possible solutions were suggested to Bryan Lord: (S13) | 2/15/2013 | | | 1 | D-13449 |
| Greve Hall | CONTINUATION OF D-11080 Greve Hall Renovation Phase 2--Ground floor, second floor, fourth and sixth floors. (LABOR OK) | 6/13/2013 | | | 0 | D-13598 |
| Hearing and Speech Center | Hearing & Speech Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13268 |
| Henson Hall | Renovations for Social Work. (CC) | 5/29/2012 | | | 0 | D-12515 |
| Hesler Biology Building and Greenhouse | Room 105 Hesler, Split emergency power circuits so each outlet is on a separate circuit. | 9/24/2012 | 5/31/2013 | 6/28/2013 | 5 | D-13179 |
| Hesler Biology Building and Greenhouse | Install internal shade cloth in Greenhouses 2, 3, and 4. (MOE) | 4/21/2011 | 6/19/2013 | 7/12/2013 | 1 | D-11456 |
| Hesler Biology Building and Greenhouse | Hesler Biology & Greenhouse - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13269 |
| Hesler Biology Building and Greenhouse | Room 615, insulate ceiling and provide temperature control. (MOE) | 3/3/2011 | | | 0 | D-11353 |
| Hess Hall | Hess Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13270 |
| Holt Avenue Apartments Residence Hall | Programming for Apartment Residence Hall renovation. (University Residence Hall) | 12/20/2012 | 12/21/2012 | 3/1/2013 | 10 | D-13372 |
| Hoskins Library Chiller Building | Hoskins Library Chiller Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13271 |
| Howard H. Baker Jr.Center for Public Policy | Replace flat roof sections of Baker Center. (XYZ) | 8/22/2012 | | | 1 | D-13122 |
| Humanities and Social Sciences Building | Install ADA ramp at Humanities Plaza and landscape the surrounding areas to include tables w/seating, benches, trash receptacles, bike hoops, lighting, concrete demolition and repairs, landscape plantings, landscape irrigation. (C12) | 6/13/2012 | 7/16/2012 | 12/7/2012 | 95 | D-12542 |
| Humanities and Social Sciences Building | Humanities - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13272 |
| Humanities and Social Sciences Building | Replace steps and ADA ramp for Lot 9 at South End of Humanities. (NO LABOR) (S13) | 1/11/2013 | | | 0 | D-13231 |
| Humanities and Social Sciences Parking Garage | G-1 Entrance/exit lane of the McClung Garage. Currently there is not a sidewalk at the entrance to G1. Pedestrians commonly use the vehicles entrance/exit lanes for ease of access (the most direct route to the building where they are going). It is typical for the lower entrance to retain water that the storm drains cannot handle during heavy rain storms & floods. The entrance is located with hills on every side & is at or near the lowest grade level. Recommend solution. Suggestions: repave the ramp so that it slopes toward the drain, install another storm drain so that it can handle the water flow. | 8/9/2012 | | | 0 | D-13095 |
| Humes Hall | Humes Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13273 |
| Humes Hall | Replace coating on promenade deck that is over basement at Humes Hall. Remove old coating, prior to installing new coating. | 8/21/2012 | | | 1 | D-13121 |
| International House | Replace light fixtures in hallway to match those in room 110 International House. (See Rick Caldwell for lighting specifications) | 5/15/2013 | | | 5 | D-13555 |
| International House | Carpet room 112 International House (same as used for D-13204). | 6/4/2013 | | | 0 | D-13573 |
| International House | Carpet 203, 206-208, 213, & 215 International House using the same carpet that was used on D-13236. Please breakdown by room. | 6/4/2013 | | | 0 | D-13574 |
| International House | Replace fan shrouds, or replace fans damaged in hail storm on 4/27/11 at International House. | 7/31/2012 | | | 0 | D-13021 |
| James A. Haslam II Business Building | James A Haslam II Business Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13274 |
| James A. Haslam II Business Building | James A Haslam Business Bldg. rm. 442: Remove existing upper and lower cabinets. Repair/repaint was as needed. Repair/replace carpet as needed. Relocate electrical outlets and data ports lower on wall. Install work station furniture (provided by department). Designer familiar with this type furniture will be needed. Contact Bryan Hopkins @ 246-8506 to arrange inspection of area. | 4/16/2013 | 5/8/2013 | | 90 | D-13506 |
| James D Hoskins Library | James D Hoskins Library - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13275 |
| Jane and David Bailey Education Complex | Paint room 315 Bailey Ed Complex. Move faculty office from 315 BEC to 325 BEC and move faculty from 325 to another office in BEC (office to be determined). Needs to be completed by June 1, 2013. | 5/7/2013 | | | 1 | D-13538 |
| Jane and David Bailey Education Complex | J & D BEC - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13276 |
| Jessie W. Harris Building | Install new carpet and paint all walls and window ledges in 220C in Jessie Harris. | 6/6/2013 | | | 0 | D-13581 |
| Jessie W. Harris Building | Renovations of suite office space in 230. | 3/16/2011 | 3/25/2013 | 6/30/2013 | 70 | D-11390 |
| Jessie W. Harris Building | Two entrances in space 301D/344. Install multiple emergency power outlets to support up to 6 minus 80 freezers. Enlarge doorway to accommodate freezers size. Install portable air conditioning unit to help keep the space cool. (C12) | 6/1/2012 | 12/17/2012 | 6/25/2013 | 90 | D-12525 |
| Jessie W. Harris Building | JHB rm 329--remove roll out window; replace HVAC unit with window unit; paint walls; wash & wax floor. JHB rm 337--replace lighting (upgrade); remove cabinet on wall by window & repair wall; repair heating & AC unit in ceiling; replace windows/reinstall window AC unit if necessary; remove piping in ceiling and blower connected to the window; paint walls; wash & wax floors. Need for new incoming faculty person. (S13) | 12/17/2012 | 3/22/2013 | 6/30/2013 | 50 | D-13342 |
| Jessie W. Harris Building | New lock for JHB 402 door and an access between 402 & 401 closed in wall built where there had been a wall before passed book shelves, light switch and next to the lockers. (SFMO) | 9/27/2011 | | | 95 | D-12138 |
| Jessie W. Harris Building | Repair floors in the animal facility at Jessie Harris. Wash and repaint the floor in the dirty side cage. The flooring was cited in our latest IACUC inspection. It should be noted that our Accreditation site visit from AAALAS takes place this coming Summer, and should be given quick attention. (S13) | 2/18/2013 | 6/24/2013 | 7/29/2013 | 20 | D-13453 |
| John C Hodges Library | John C Hodges Library - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13277 |
| John C Hodges Library | Paint rooms 211, 212, 213, 251, 252, and 253 John C Hodges Library. **Note: MUST BE PAINTED WITH SCUTT MASTER PAINT*** | 4/29/2013 | 5/14/2013 | 5/17/2013 | 1 | D-13525 |
| John C Hodges Library | Renovations for converting Hodges Library to 24/7 operation. Add emergency phones at every elevator stop at every floor. Add cameras (see Cpt. Lambert). Add lighting & power for device (laptops, phones, etc) chargers near elevators on each floor. Add security measurers to Volunteer Boulevard entrances (lasers). (S13) | 7/2/2012 | 5/20/2013 | 8/30/2013 | 15 | D-13034 |
| John C Hodges Library | Clean the inside & outside of the windows on the 1st & 2nd floors. (S13) | 12/17/2012 | | | 90 | D-13352 |
| John C Hodges Library | Renovations to Galleria at John C Hodges Library. | 4/26/2013 | | | 0 | D-13518 |
| John C Hodges Library | Refinish wooden doors at John C Hodges Library, see list. | 2/21/2013 | | | 1 | D-13465 |
| John D. Tickle Engineering Building | Provide Technology systems for 4 classrooms in the Tickle Building. (S13) | 7/2/2012 | 6/3/2013 | 8/16/2013 | 0 | D-13036 |
| John D. Tickle Engineering Building | Tickle Building - move-in to facility after construction. (S13) | 5/9/2013 | | | 1 | D-13546 |
| Kappa Sigma Fraternity House | Design services for roof replacement - replace roof (Maint) (XYZ) | 3/21/2011 | | | 70 | D-11394 |
| Kingston Pike Building | Install a second water chiller at the Kingston Pike Building. (S13) | 5/20/2011 | 4/8/2013 | | 75 | D-11488 |
| Kingston Pike Building | Repair or replace carpet in KPB 109 due to extensive wrinkles. Mark Smith of EHS requested work to prevent accident/trip hazard. | 5/15/2013 | | | 0 | D-13552 |
| Kingston Pike Building | Install a signal wire from the Automatic Transfer Switch for the KPB generator to the KPB Eaton 9395 UPS. This needs to be a "dry contact" type connection to allow the UPS to sense when the input power is being provided by the generator. | 4/3/2013 | 5/27/2013 | 6/14/2013 | 95 | D-13493 |
| Kingston Pike Building | Replace roof on KPB. (Ins) (Cap/Repl) (XYZ) | 5/1/2012 | | | 1 | D-12452 |
| Laboratory Animal Facility | Laboratory Animal Facility - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13278 |
| Lake Ave Early Learning Ctr (2nd bldg) | Move a playground Gazebo (wooden Structure) from South Doyle High School to the UT Early Learning Center at Lake Avenue. Move cannot take place until the month of June 2013 because in June School will not be in session and children will not be disturbed at South Doyle. We would like the Gazebo moved to 2010/2016 Lake Avenue at the ELC Preschool Playground site. Contact Kathy Kidd for additional information regarding the move and the site it will be moved to. 865-755-2048 | 5/8/2013 | | | 0 | D-13541 |
| Lake Ave Early Learning Ctr (2nd bldg) | Security buzzer to all outside doors for ELC which would trigger an ELC personnel to have access. Please look into other options like: key code system or key scan card system. Program card reader. Furnish and install door release for entry to building. | 8/15/2012 | 3/25/2013 | 6/21/2013 | 95 | D-13105 |
| Lambda Chi Alpha Fraternity House | Lamda Chi Alpha Fraternity - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13279 |
| Laurel Residence Hall | Laurel Residence Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13280 |
| Law Complex: George C Taylor Wing | Replace carpet in room 262 Law Complex George C Taylor Wing. | 4/23/2013 | | | 1 | D-13516 |
| Law Complex: George C Taylor Wing | Install door to create storage in former telephone booth alcove. (143A) | 8/17/2012 | | | 10 | D-13113 |
| Law Complex: George C Taylor Wing | Law Complex 158: Mount flat screen panel to wall in conference room. Department has brackets. Must be completed by June 30, 2013. | 6/6/2013 | | | 0 | D-13582 |
| Law Complex: George C Taylor Wing | Install 3 x 5 back lit board like in Humanities Building under stairway on First Floor of the Law Complex near room 132. | 6/3/2013 | | | 0 | D-13572 |
| Law Complex: George C Taylor Wing | Install projectors in 12, 237, 338 & 403 Law Complex. Itemized list of necessary actions attached. | 5/22/2013 | | | 0 | D-13558 |
| Law Complex: George C Taylor Wing | Relocate cabinets/serving area in Faculty Lounge directly across room 262 against the wall. Also run wiring to install ceiling projector for use in forums, presentations, etc. Needs to be charged in this fiscal year. | 4/26/2012 | | | 95 | D-12424 |
| Law Complex: George C Taylor Wing | Law Complex: George C Talor Wing - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13281 |
| Law Complex: Law Library and Classroom Addition | Law Complex 312, 312, 314: paint study rooms. Work cannot begin until after May10 and must be completed by end of fiscal year. | 4/26/2013 | | | 1 | D-13520 |
| Law Complex: Law Library and Classroom Addition | Law Complex: Law Library & Classroom Addition - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13282 |
| Law Complex: Law Library and Classroom Addition | Replace carpet in second floor Law Library space (excluding individual offices) at the Law Complex. | 5/1/2013 | 6/4/2013 | 7/12/2013 | 1 | D-13528 |
| Law Complex: Law Library and Classroom Addition | Replace carpet in the first floor Libray wing and stairs to second floor (excluding individual offices) at the Law Complex. | 5/1/2013 | 6/4/2013 | 6/28/2013 | 60 | D-13529 |
| Law Complex: Law Library and Classroom Addition | Replace carpet in 222 & 233 Techincal Services Department of the Law Library. | 5/30/2013 | | | 1 | D-13568 |
| Law Complex: Law Library and Classroom Addition | Law Complex 21, 22, 23, & 24: paint study room. Work cannot begin until after May 10 and must be completed in this fiscal year. | 4/26/2013 | | | 1 | D-13521 |
| Law Complex: Law Library and Classroom Addition | Law Complex room 205, 206, 207: Paint study rooms. Must be done After exams (After May10) but before end of fiscal year. | 4/26/2013 | | | 1 | D-13519 |
| Lindsey Nelson Stadium | Lindsey Nelson Stadium - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13283 |
| Lindsey Nelson Stadium | Repair or replace field lighting damaged in hail storm on 4/27/11 at Lindsey Nelson Stadium. (S13) | 9/11/2012 | | | 5 | D-13023 |
| Lindsey Nelson Stadium | Electric Shop to install magnets on numerous doors at Lindsey Nelson Baseball Stadium as soon as possible. (S13) | 3/19/2012 | 11/12/2012 | 7/12/2013 | 90 | D-12378 |
| Massey Hall | Massey Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13284 |
| McClung Tower and Plaza | Renovate office in McClung Tower for Department of English. | 6/17/2013 | | | 0 | D-13601 |
| McClung Tower and Plaza | Clean blinds in room 912 McClung Tower. | 2/15/2013 | | | 0 | D-13452 |
| McClung Tower and Plaza | Replace carpet in room 406 McClung Tower. | 5/8/2013 | | | 0 | D-13544 |
| McClung Tower and Plaza | Install new carpet and paint the walls in room 1004 McClung Tower. | 5/9/2013 | | | 0 | D-13547 |
| McClung Tower and Plaza | McClung Tower - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13286 |
| McCord Hall | Renovations to suite 201 in McCord Hall for UTIA IT Department. Refer to attachments for the detailed project description and floor plans drawing. | 12/14/2012 | | | 1 | D-13351 |
| McCord Hall | Replace roof at McCord Hall. (Ins) (Cap/Repl) (Replace east tile, review west tile) (XYZ) | 5/1/2012 | | | 1 | D-12453 |
| Middlebrook Building | Room 119 Middlebrook, Demolition(plan), new walls, doors & side lites, revised HVAC (plans & description provided), revised sprinklers (TBC coverage) new ceiling & relocation of light fixtures, new if required; paint & patch & provide new carpet where required. | 11/20/2012 | | | 0 | D-13331 |
| Middlebrook Building | Middlebrook Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13288 |
| Min H. Kao Electrical Engineering & Computer Science | Activate volcard swipe access for room 336, 337, 339 Min Kao Senior Design Labs. Spare electrical locks are available. | 1/30/2013 | 5/27/2013 | 6/28/2013 | 0 | D-13416 |
| Min H. Kao Electrical Engineering & Computer Science | Replace windows in rooms 310, 313 and 346 with open able, lockable windows to allow roof access. | 8/22/2012 | | | 1 | D-13133 |
| Min H. Kao Electrical Engineering & Computer Science | Add swipe locks to the following room doors with dual access control by CURENT & Police department. Hallway doors in Min Kao rooms 101, 107, 121A, 121B, 124 (2 doors), 125, 402, 411,412, 530, 531, 532, 533, 554. & 555. Access additions & removal of personnel to these rooms will be directly CURENT for safety reasons. | 5/9/2013 | | | 0 | D-13548 |
| Min H. Kao Electrical Engineering & Computer Science | Min Kao - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13289 |
| Min H. Kao Electrical Engineering & Computer Science | Construct Min Kao loading dock behind Dougherty. (S13) | 2/13/2012 | 4/15/2013 | 6/14/2013 | 90 | D-12320 |
| Morgan Hall | Remove and reinstall Kiosk on the first floor. Prepare walls for monitors. Remove sculptures and hang in new location. Refinish & paint wall where needed. | 11/9/2010 | | | 0 | D-11186 |
| Morgan Hall | Morgan Hall: 201 carpet removal, restoration of underlying floor. 202 remove door opening from hall, leave transom, remove closet door, fix holes in closet(option A) Replace hall door with glass and replace closet with glass, add door to 201. See attachments for further details. | 6/5/2013 | | | 0 | D-13577 |
| Morgan Hall | Remove and dispose of existing carpet in room 229 Morgan Hall. Refinish existing hardwood floors (natural Finish). Paint all walls, baseboards, doors, window and door trim. Request completion by July 1, 2013. Remove existing office landscape partitions. Room 229 will be vacated on May 14, 2013. | 5/10/2013 | | | 0 | D-13550 |
| Morgan Hall | Replace roof on Morgan Hall. (Ins) (Cap/Repl) (Review tile) (XYZ) | 5/1/2012 | | | 1 | D-12454 |
| Morrill Hall | Morrill Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13290 |
| Music Center | Music Building - move-in to facility after construction. (S13) | 3/14/2013 | | | 5 | D-13478 |
| Music Center | Facilities Services to assist with Band Uniform Storage Conveyor System and for installing Theatrical Lighting for Recital Hall in the Music Building. (S13) | 5/16/2013 | 5/30/2013 | 7/19/2013 | 90 | D-13556 |
| Music Center | Provide technology systems for 9 classrooms in the Music Building. (S13) | 7/2/2012 | 4/11/2013 | 8/16/2013 | 10 | D-13035 |
| Neyland-Thompson Sports Center | Neyland-Thompson Sports Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13291 |
| Nielsen Physics Building | Nielsen Physics Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13292 |
| Nielsen Physics Building | Renovate lab space in 506 & 507 Nielsen Physics into office space for Graduate Research Assistant`s research work and Study Area. Provide layout, office landscape partitions, electrical and network connections. This work has to be coordinated with establishing astronomy laboratory in Nielsen 108 in connection with the planetarium project. (SERFHOODS) (CC) (S13) | 11/29/2012 | | | 0 | D-13333 |
| OFF CAMPUS | Make and install a double sided 4` x 8` sign with black metal posts to be erected at ETREC - Blount Unit on Singleton Station Road. | 6/12/2013 | | | 0 | D-13588 |
| Outdoor Tennis Center Building | Outdoor Tennis Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13293 |
| Panhellenic Building | Replace roof at Panhellenic. (Ins) (XYZ) | 5/1/2012 | | | 1 | D-12455 |
| Pasqua Nuclear Engineering Building | Repair electrical system in room 105 Pasqua Nuclear Engineering. | 1/10/2013 | 5/13/2013 | 6/28/2013 | 1 | D-13390 |
| Pediatric Language Clinic | Paint the exterior of Pediatric Language Clinic. Scrape and paint railing on front porch. Replace/repair missing brick on deck. | 4/4/2013 | | | 1 | D-13497 |
| Perkins Hall | Replace roof at Perkins Hall. (Ins) (Cap/Rpl) (Ck Tile) (XYZ) | 5/1/2012 | | | 1 | D-12456 |
| Philander P. Claxton Education Building | Renovations to Philander P Claxton 206 for NIMBios. | 3/5/2013 | | | 1 | D-13473 |
| Philander P. Claxton Education Building | Replace roof at Philander Claxton. (Ins) (Cap/Rpl) (Ck Tile) (XYZ) | 5/1/2012 | | | 1 | D-12457 |
| Pi Kappa Phi Fraternity House | Pi Kappa Phi Fraternity - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13294 |
| Plant Biotechnology Building | Replace window awnings damaged in hail storm on 4/27/11 at Plant Biotech. | 7/2/2012 | | | 0 | D-13012 |
| Plant Biotechnology Building | Have generator backup outlets installed in rooms: PBB 117(#2, 110V), PBB 363 (220V & 110V), PBB 367 (#2 110V), PBB 402 (#2 110V), PBB 419 (220V) | 1/23/2013 | 5/20/2013 | 6/28/2013 | 0 | D-13408 |
| Plant Biotechnology Building | Install a card swipe system to deparmental off PBB 370 for the purpose of monitoring activities after hours. | 1/14/2013 | 5/20/2013 | 6/28/2013 | 0 | D-13398 |
| Plant Biotechnology Building | Plant Biotechnology Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13295 |
| Pratt Pavilion | Repair or replace window flashing & lightning rods damaged in storms on 4/25/11 & 4/27/11 at Pratt Pavilion. | 9/11/2012 | | | 1 | D-13013 |
| Presidential Court | Replace roof on Presidential Court. (XYZ) (Crisis) | 3/1/2013 | | | 1 | D-13470 |
| Presidential Court | Install 12 wireless access points on the second floor of Presidential Court. Need conduit run from access point locations on the second floor to the SER on first Floor room 112. | 6/13/2013 | | | 1 | D-13595 |
| Presidential Court | Replace the roof and the Stepping Stone system in the Plaza/Bakery at Presidential Court. | 4/8/2013 | | | 1 | D-13499 |
| Presidential Court | Install 1" conduit through the exterior wall on the 3rd floor of Reese & Humes onto the roof and ending at the center of the building facing the courtyard. 1" conduit from hatch in the breezway of North & South Carrick to the side of buidling facing the courtyard. | 6/13/2013 | | | 0 | D-13596 |
| Presidential Court | Prisidential Court - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13296 |
| Publications and Services Building | Replace metal roof damaged in hail storm on 4/27/11 at Publications & Services. (Ins) | 7/2/2012 | | | 0 | D-13028 |
| Racheff Research | Renovations including back-up generator for non-life safety process use and HVAC controls. (S13) | 8/1/2011 | 2/11/2013 | 10/18/2013 | 5 | D-12059 |
| Radiological Safety - Old Cherokee Trail | Radiological Safety - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13297 |
| Reese Hall | Reese Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13298 |
| Reese Hall Chiller | Reese Hall Chiller - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13299 |
| Regal Soccer Stadium | Replace metal roofs damaged in hail storm on 4/27/11 at Regal Soccer Stadium. (Ins) | 7/2/2012 | | | 0 | D-13029 |
| Science and Engineering Building | Install two fume hoods in room 603 SERF. (CC) (SERFHOODS) (S13) | 1/23/2012 | 3/15/2013 | 4/16/2013 | 50 | D-12289 |
| Science and Engineering Building | Investigate feasibility of installing two 8 foot hoods in room 518 SERF. (CC) (SERFHOODS) (S13) | 1/23/2012 | 7/26/2013 | 9/16/2013 | 0 | D-12288 |
| Science and Engineering Building | Install fume hood in 606 SERF. (CC) (SERFHOODS) (S13) | 1/23/2012 | 3/20/2013 | 4/26/2013 | 1 | D-12291 |
| Science and Engineering Building | Install two fume hoods in 536 SERF. (CC) (SERFHOODS) (S13) | 1/23/2012 | 4/29/2013 | 8/5/2013 | 5 | D-12292 |
| Science and Engineering Building | Install three fume hoods in room 218 SERF. (CC) (SERFHOODS) (S13) | 1/23/2012 | 4/10/2013 | 5/16/2013 | 90 | D-12293 |
| Science and Engineering Building | Renovation of lab 718 at SERF. (SFMO) (S13) | 6/27/2011 | 7/9/2012 | 12/1/2012 | 95 | D-11539 |
| Science and Engineering Building | Repairs for 4th floor entrance skylight at SERF. (Crisis) (CC) (S13) | 5/1/2012 | | | 1 | D-12444 |
| Science and Engineering Building | Install fume hoods in room 312 SERF. (CC) (SERFHOODS) (S13) | 1/26/2012 | 2/13/2013 | 5/16/2013 | 50 | D-12296 |
| Science and Engineering Building | SERF 439: move & install portions of a cubicle wall and door. Move compressed air tank wall-support-bar from one sidewall to another. | 6/12/2013 | | | 0 | D-13587 |
| Science and Engineering Building | Install blinds on two left windows in lab 617 SERF. | 5/8/2013 | | | 1 | D-13539 |
| Science and Engineering Building | Install the equipment listed in the attached document on the 6th floor roof of SERF where the solar arrays are currently mounted. | 6/7/2013 | | | 0 | D-13583 |
| Science and Engineering Building | Add one fume hood to room 702 SERF. (CC) (SERFHOODS) (S13) | 11/19/2012 | | | 0 | D-13330 |
| Science and Engineering Building | SERF 218: Lab renovations, in addition to and not including work for fume hoods. (CC) (SERFHOODS) (S13) | 8/22/2012 | 4/12/2013 | | 5 | D-13126 |
| Science and Engineering Building | SERF 603/604: Lab renovations, in addition to and not including work for fume hoods. (CC) (SERFHOODS) (S13) | 8/22/2012 | 5/20/2013 | | 10 | D-13125 |
| Science and Engineering Building | SERF 606: Lab renovations, in addition to and not including work for fume hoods. (CC) (SERFHOODS) (S13) | 8/22/2012 | | | 1 | D-13124 |
| Science and Engineering Building | SERF 312: Lab renovations, in addition to and not including work for fume hoods. (CC) (SERFHOODS) (S13) | 8/22/2012 | 10/1/2012 | 6/5/2013 | 10 | D-13123 |
| Science and Engineering Building | SERF 210: (1) Install ceiling with noise abatement. (2) Install lighting in new ceiling with dimmer controls. (3) Install projector mount from ceiling. (4) relocate 2 of the electrical outlets to lower wall positions to avoid interference with mounting of white boards. | 1/23/2013 | 3/13/2013 | 6/30/2013 | 50 | D-13409 |
| Science and Engineering Building | Build a permanent wall that separates the "wedge space" in Serf 538 from the other part of 538. (SERFHOODS) (S13) | 8/8/2012 | 5/6/2013 | 6/30/2013 | 80 | D-13092 |
| Science and Engineering Building | Install 115v - 20a dedicated circuit with two duplex outlets and one 208V-20A circuit room 626 SERF. | 7/23/2012 | 6/30/2013 | 6/30/2013 | 20 | D-13072 |
| Science and Engineering Building | Add fire alarm controllers on each floor of SERF to accommodate additional strobes. (CC) (C12) (SERFHOODS) (S13) | 9/11/2012 | 10/15/2012 | 6/28/2013 | 90 | D-d-12378 |
| Science and Engineering Building | SERF - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13300 |
| Senter Hall | Install 220V service to room 116 Senter Hall. | 5/14/2013 | 6/10/2013 | 6/13/2013 | 5 | D-13551 |
| Shelbourne Towers | Programming for Shelbourne Residence Hall. | 7/13/2012 | | | 5 | D-13054 |
| Sherri Parker Lee Stadium | Replace metal roofs damaged in hail storm on 4/27/11 at Sherri Parker Lee Stadium. (Ins) | 7/2/2012 | | | 0 | D-13030 |
| Sherri Parker Lee Stadium-Team Facility | Enclosure for the Batting Cage at Sherri Parker Lee Stadium. | 8/16/2012 | 1/21/2013 | 6/30/2013 | 95 | D-13103 |
| Sigma Alpha Epsilon Fraternity House | Sigma Alpha Epsilon Fraternity - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13301 |
| Sigma Phi Epsilon Fraternity House | Sigma Phi Epsilon Fraternity - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13302 |
| South & East Stadium | Room 445A is going to be used for pediatric audiology testing. Need windows sealed and covered to decrease noise and allow children to sleep if needed for testing. | 5/23/2013 | | | 0 | D-13559 |
| South & East Stadium | Drilling through walls and wrapping columns for network service for Audiology & Speech Pathology, room 344 South Stadium Hall; acct. no. E07-3740. This is a specific request for preparing Network Services to install ports in room 344 SSH. Please contact Ben Rayfield (brayfie1@utk.edu)(4-6648) for explanation. But here is summary: 9 columns will need to be wrapped with conduit; 11 walls will need to be drilled and sleeved with 4" bushings to gain access to the Service Equipment Rack (SER) that OIT will need access to. OIT has already provided an estimate for the network install costs. If I can assist, please don`t hesitate to contact me. Max Dawson mdawson@utk.edu 4-1803 | 4/11/2013 | 6/10/2013 | 6/28/2013 | 10 | D-13503 |
| South & East Stadium | Replace siding & window flashing damaged in hail storm on 4/27/11 at Neyland Stadium West Skybox/Club. | 9/11/2012 | | | 0 | D-13027 |
| South & East Stadium | Repair or replace field lighting damaged in hail storm on 4/27/11 at Neyland Stadium. (Ins) | 7/2/2012 | 6/10/2013 | 8/2/2013 | 1 | D-13022 |
| South & East Stadium | Work associated with the DAS (Distributed Antenna System) project. (Wireless communication tower) (S13) | 5/16/2012 | 8/28/2012 | | 5 | D-12493 |
| South College | Replace copper roofs damaged in hailstorm on 4/27/11 at South College. Remove both roofs and return to original roof. (Ins) | 7/2/2012 | | | 1 | D-13010 |
| Stadium Drive Parking Garage-G10 | Green Project - Evaluate installation of Photovoltaic system on G-10 garage. (Stadium Drive Parking Garage) (SI) | 3/27/2013 | | | 0 | D-13486 |
| Steam Plant | Steam Plant - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13303 |
| Stokely Management Center | Replace doors from basement to vestibule between G2 & G4 SMC. Replace doors from plaza to G2. Also includes handrail replacement around area wells. (S13) | 2/19/2013 | | | 0 | D-13455 |
| Stokely Management Center | Stokely Management Center Renovations for rooms; 708, 708A, and 709. Please see attached for more detail. | 11/7/2012 | | | 0 | D-13318 |
| Stokely Management Center | SMC 701: Remove risers from table tops
Refinish or replace table tops as needed.
Relocate power to underneath tables
Remove data ports (disposition to be determined), except for designated ports to be kept
Renovate lighting to include dimming capability w/switch or sensors at both entrances
Protect carpet during work
Repair repaint walls as needed | 12/17/2012 | 3/13/2013 | 6/30/2013 | 80 | D-13348 |
| Stokely Management Center | Install a signal wire from the Automatic Transfer Switch for the SMC generator to the SMC Eaton 9395 UPS. This needs to be a "dry contact" type connection to allow the UPS to sense when the input power is being provided by the generator. | 4/3/2013 | 5/27/2013 | 6/28/2013 | 70 | D-13492 |
| Stokely Management Center | Replace Fire Alarm System. (FACPL) (ADA) (No labor) (S13) | 9/30/2011 | 6/11/2012 | 7/31/2013 | 50 | D-12149 |
| Stokely Management Center | Run conduit at SMC for a camera on the roof to monitor the UC project. We will need @ 120ft of 1" conduit on the roof from ther penthouse: a 1" sleeve from the 7th floor mechanical room down to the 6th floor; a 1" conduit from the 6th floor mechanical room to the soft ceiling on the 6th floor. | 5/30/2013 | | | 0 | D-13569 |
| Stokely Management Center | SMC 3rd floor. UT Sign Shop to purchase & install room number signs (47 small, 45 large) with apppropriate ADA compliant number for all rooms. Signs to be sprayed to match metal finish of new floor furnishings. Details of sign order e-mailed to Steve Moyers in the Sign Shop. | 5/30/2013 | | | 1 | D-13570 |
| Stokely Management Center | Stokely Management Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13304 |
| Stokely Management Center | SMC 334A: move existing power outlets from current location on walls to 44" from floor to accommodate new furniture installation. 339A- add 2 power outlets at 44" on wall that is common with 334A. Furniture installation is scheduled for July 1, 2013. Wourk would need to be completed prior to install. | 6/17/2013 | | | 0 | D-13603 |
| Stokely Management Center | Connect pigtails to NOI furniture/cubicle installation. Area is located outside 305 SMC in the former 306a area. Unformtunately the pigtails cannot be delivered prior to installation, which is scheduled to begin on 7/1/13. NOI suggests that electricians be scheduled for 7/2/13 to connect pigtails. Layout of furniture installation is atta contact Jennifer hichs with questions. | 6/17/2013 | | | 0 | D-13599 |
| Stokely Management Center | Relocate electrical outlets from post in floor to wall in rooms 332 & 333 SMC. Move data ports as needed and patch carpet in both rooms. | 6/17/2013 | | | 0 | D-13602 |
| Student Aquatic Center | Student Aquatic Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13305 |
| Student Health Clinic | H/C access and a "doorbell" need to be installed on the right hand door of the main entrance to 201 Student Health. Ken needs to meet with someone on location to discuss specifics before estimate is prepared as there are several options on how/where to locate the "bell". Devices also need "on/off" switches and should be invisible from the main entry door to 201. The best option can be determined when we meet on-site. | 5/8/2013 | | | 0 | D-13543 |
| Student Recreational and Fitness Center | Place a bollard at each end of the walkway between the outdoor paddleball courts and the RecSports fields to prevent motorized vehicular access/traffic. | 5/3/2013 | | | 0 | D-13535 |
| Student Recreational and Fitness Center | Replace all field lights that are out on the RecSports Turf Field adjacent to the TRECS facility. There are 12 out when last checked however we would like any that are currently out repair/replaced. RecSports has some ballasts and bulbs on hand however we place an order last budget year through FS that has not arrived as of yet. Please contact Randy nicely to obtain the bulbs and ballasts that we have on hand in the TRECS facility. | 11/8/2012 | 6/10/2013 | 7/22/2013 | 1 | D-13321 |
| Student Recreational and Fitness Center | TRECS - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13307 |
| Student Services Building | Provide electrical connection to power frommet and add overflow raceway wire cover to conference table for computer use in 111A Student Services Building. New conference table will be delivered May 16, 2013. We need to have ther work completed before the end of the current fiscal year (before June 30). | 5/2/2013 | | | 0 | D-13530 |
| Student Services Building | SSB - remove 407C & D cubicles; remove old & build new wall indicted between 409A & 409B1; remove old & build new wall indicted between 409A & 407; remove glass hallway window in 407 & replace with wall; add door so conference room 409B7 can also be accessed from 412A as indicted on attachment. New Conference Room 409A will need repainted & recarpeted to match 409. | 12/18/2012 | 5/22/2013 | 8/2/2013 | 15 | D-13369 |
| Student Services Building | Student Services Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13308 |
| Student Services Building | Lower 2 cashier counters to desk height in room 211 Student Services Building. | 4/22/2013 | | | 0 | D-13513 |
| Student Services Building | SSB 211: replace all the desktops with ergonomic desktops. | 4/22/2013 | | | 0 | D-13514 |
| Student Services Building | Install power to the new modular furniture in room 111 Student Services Buildling. The furniture is expected to arrive on Thursday, May 16, 2013. | 5/8/2013 | | | 0 | D-13545 |
| TANDEC--Textiles and Nonwovens Development Center | TANDEC - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13309 |
| Thompson-Boling Assembly Center and Arena | Provide ventilation in TV equipment room. (SFMO) | 12/30/2008 | | | 0 | D-09205 |
| Thompson-Boling Assembly Center and Arena | Please update 2 maglocks at the Business Office area at TBA and one push button release switch at the arena. | 8/17/2012 | 12/4/2012 | 12/31/2012 | 95 | D-13114 |
| Thompson-Boling Assembly Center and Arena | Blanket: Miscellaneous work as needed (FY 2012-2013) | 7/1/2012 | 7/1/2012 | 6/30/2013 | 90 | D-13003 |
| Thornton Athletics Student Life Center | Thornton Athletics Student Life Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13310 |
| Thornton Athletics Student Life Center | Install system to eliminate moisture for sunken slab area at main entrance of Thornton Athletics. (S13) | 3/28/2013 | | | 0 | D-13472 |
| Tom Black Track Facilities Building | Replace metal roof damaged in hail storm on 4/27/11 At Tom Black Track. (Ins) | 7/2/2012 | | | 0 | D-13031 |
| Tom Black Track Facilities Building | Repair or replace field lighting damaged in hail storm on 4/27/11 at Tom Black Track. | 9/11/2012 | 5/13/2013 | 6/30/2013 | 80 | D-13026 |
| Tyson Alumni Center | Install 4 new sconce lights, 1 new chandelier, 2 new display lights on the Landing at Tyson Alumni Center. Patch the walls and paint 2nd floor landing. | 2/12/2013 | | | 0 | D-13431 |
| Ula Love Doughty Carousel Theatre | Cap the roof of Ula Love Doughty Carousel Theatre. (Ins) (Cap/Repl) (XYZ) | 4/3/2013 | | | 0 | D-13491 |
| UT Welcome Center | Replace roof at Welcome Center. (Ins) (Cap/Rpl) (XYZ) | 5/1/2012 | | | 1 | D-12459 |
| UT Welcome Center | Need the mag lock box on the main exterior doors moved over to have each door individually monitored so that the vertical rod that locks the door can be repair and installed at the UT Welcome Center. This is an immediate need, as we currently cannot lock the front door of the building. | 4/26/2013 | | | 0 | D-13522 |
| Veterinary Teaching Hospital | Veterinary Teaching Hospital - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13311 |
| Volunteer Hall | Volunteer Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13312 |
| Walters Life Sciences Building | WLS D402: Install 115v-20a dedicated emergency power outlet to left of door. | 6/3/2013 | | | 0 | D-13571 |
| Walters Life Sciences Building | Paint rooms E412/E414 in Walter Life Sciences. | 6/10/2013 | | | 0 | D-13585 |
| Walters Life Sciences Building | Paint room F423 Walters Life Sciences. | 6/10/2013 | | | 0 | D-13586 |
| Walters Life Sciences Building | Walters Life Sciences Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13313 |
| Walters Life Sciences Building | Programming for Walters Life Sciences. | 7/13/2012 | | | 5 | D-13053 |
| West Skybox Addition | West Skybox Addition - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) | 11/2/2012 | | | 1 | D-13314 |