Facilities Services Projects





Current Open Projects (ALL):

BUILDINGDESCRIPTIONDATE APPROVEDSCHED TO BEGINSCHED TO COMPLETE% COMPLETEPROJECT NUMBER
1643 Cumberland Avenue - Commercial BldgCumberland Renovations for Vol Shop and Dining facility at Cumberland and 17th.8/26/20137/18/20141D-14118
1643 Cumberland Avenue - Commercial BldgMcMillens Bookstore & Dynasty Rest. - Repair/Replace/Recover the Built-up roof (XYZ) UT Bookstore/Aramark3/28/20131D-13287
2121 Stephenson DriveReference Environmental Health & Safety Report dated 8/18/09. Estimate cost to repair various trip hazards identified in parking area S14 near the Warehousing offices. Specifically, raised utility boxes, overturned wheel stops, and loose covers to hole.11/11/20104/30/201495D-11194
2121 Stephenson DrivePave area 66 located off Fletcher Luck Lane near Plant Sciences Annex B.5/9/20114/21/20144/30/20141D-11473
2121 Stephenson DriveGrade parking area SC40 (gravel portion of lot) at Kingston Building. If needed, add more gravel. There are deep trenches forming in this parking area the need to be addressed.1/8/20141/16/20144/30/201440D-14281
2121 Stephenson DriveInstall an asphalt speed bump in staff 12 at the I-House. This speed bump would be located near the entrance exit across from the Tyson Alumni House slightly north of the entrance. The bump will need to reach across both driving lanes to prevent traffic from driving around them. There is currently a short plastic speed bump in place that this project will replace.4/9/20140D-14405
Alumni Memorial BuildingAMB room 32: Audio/Video ONLY3/31/20145/7/20148/25/20140D-14383
Alumni Memorial BuildingRenovations to Alumni Memorial room 41 for Theatre Department to occupy.10/30/20133/31/20146/30/201415D-14210
Alumni Memorial BuildingAMB room 210: Audio/Video ONLY.3/31/20145/7/20148/25/20140D-14382
Alumni Memorial BuildingInstall Audio/Video Only in Cox Auditorium at AMB.3/31/20145/7/20148/25/20140D-14381
Alumni Memorial BuildingAMB room 27: New White Board3/31/20145/7/20148/25/20140D-14389
Andy Holt TowerAndy Holt Tower - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13242
Art and Architecture BuildingInstall cameras in wood shop for safety and security at A & A 121. (C13)6/27/20131/13/20145/30/201440D-13630
Art and Architecture BuildingInstall Audio/Video only in room 113 A & A.3/31/20145/7/20148/25/20140D-14380
Art and Architecture BuildingCreate kiosks area on each end of studio floor (3rd & 4th). Would include area for small microwave, small fridge, four electrical outlets with counter top space, optional small sink area. Requesting estimate with and without sink option. Areas to be outside studio areas 347, 307, 459 and 403.6/27/20130D-13628
Art and Architecture BuildingRenovations for McCarty Auditorium, room 109. (C13)1/11/201312/16/20135/30/201495D-13391
Art and Architecture BuildingStudio electrical renovations all 3rd & 4th floor Studios Colleg of Archetecture & Design.4/17/20140D-14412
Art and Architecture BuildingClassroom Upgrade 2014- A & A 3253/31/20145/7/20148/25/20140D-14378
Art and Architecture Building"RUSH" Patch & paint several walls in downtown studio meeting requested as soon as possible with David Matthews to discuss areas. Requesting work be completed by 8/14/13. Location Downtown Studio Gay & Union, 502South Gay Street, Knoxville Tn. 379028/15/20130D-14104
Art and Architecture BuildingCONTINUATION OF M-13082. Relocate elevator pumping unit to room 125A, A & A (part of maintenance space off of loading dock). Build fire rated room around unit with new door to loading dock, etc.12/17/20131/13/20144/11/201496D-14272
Art and Architecture BuildingReplace the track lights with new track lights in A & A 321 along with lights & dimmer. The lights in the front of the room, facing the screen, need to be on a different Circuit. Room 443 has lights configured like we want done in room 321.3/24/20140D-14368
Art and Architecture BuildingReplacement or possible upgrade for our current swipe card system at 2nd floor bridge stairs, stairs at 1st level atrium; loading dock area at A & A. Installing a new swipe card system is in the main administrative office room 224 (please see attached documentation and correspondence from Captain Severs & Tim York). (CC)7/5/201212/2/20134/11/201430D-13039
Art and Architecture BuildingArt & Architecture Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13243
Austin Peay BuildingRepair wall and paint room 403D Austin Peay.2/5/20143/24/20144/25/201480D-14315
Austin Peay BuildingPlease paint the open area of Suite 303 Austin Peay. We will have a color selected fro the Building Palette, We would loike to have this done as soon as possible, Please. We have a staff member moving into this area the entire suite needs to be updated.2/28/20140D-14340
Austin Peay BuildingAustin Peay Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13244
Austin Peay BuildingUpgrades to Seminar Room 308 at Austin Peay.3/31/20145/7/20148/25/20140D-14391
Auxiliary Services BuildingAuxiliary Services Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (C13)11/2/20121D-13245
Auxiliary Services BuildingProvide support for installation of flume at Auxiliary Services.4/11/20140D-14406
Ayres HallAyres Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13246
Berry HallProvide emergency lighting and exit signage. This project will also pick up costs for lighting replacements, etc.9/18/20132/10/20148/30/201425D-14163
Berry HallBerry Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/1/20131D-13247
Biosystems Engineering and Soil Science Labs BuildingReplace roofs damaged in hailstorm on 4/27/11 at BEES Office Building. (BU and tile) (Ins) (Cap/Repl BU) (XYZ) (C13)7/2/20121D-13016
Biosystems Engineering and Soil Science Labs BuildingBiosystems Eng & Soil Sci Labs - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13248
Black Cultural CenterReplace fan shrouds, or replace fans damaged in hailstorm on 4/27/11 at Black Cultural Center.7/31/20120D-13017
Blount HallBlount Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13249
Blount HallInstall glass wall with double doors on the ground floor of Blount Hall. The glass would partially separate A001 from A004. Please see Beth Neilson & Renee Thomas when arriving. See attached for more detail.4/22/20134/21/20146/13/20141D-13510
BoathouseReplace storm damaged metal roof on the Boathouse. (XYZ)10/18/20131D-14197
Brehm Animal Science BuildingReplace revolving darkroom door with regular solid wooden door/metal door frame to match rest of building. Room 364 Brehm is a darkroom, so will require the addition of a light tight seal.2/3/20140D-14311
Brenda Lawson Athletic CenterBrenda Lawson Athletic Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13250
Burchfiel Geography BuildingBurchfiel room 101: Install new Light Switch3/31/20145/7/20148/25/20140D-14390
Burchfiel Geography BuildingBurchfiel Geography Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (C13)11/2/20121D-13251
Butler BuildingReplace metal roof damaged in hailstorm on 4/27/11 at Butler Building. (Ins) (XYZ)7/2/20120D-13018
CAMPUSBlanket: Disabilities Accommodations (FY 2012-2013)7/1/20127/1/20126/30/201310D-13002
CAMPUSInstall Lighting for Rugby Field at Fulton Bottoms. (C13)1/11/20126/17/20136/2/201445D-12272
CAMPUSRepairs and cleanup from freezing weather event January 5, 2014 through January 9, 2014.1/9/20148/1/201470D-14282
CAMPUSBlanket - general maintenance in classrooms to include replacing markers, erasers, seating repairs, painting, etc. (FY14)(C13)8/7/201310D-14087
CAMPUSCONTINUATION OF D-12147; Use of City of Knoxville´s John Clabo Field at Duff Park during a time period that Fulton Bottoms will be occupied by KUB.7/8/201310D-14041
CAMPUSBlanket: Campus Beautification (FY 2013-2014)7/1/20137/1/20136/30/201410D-14005
CAMPUSBlanket: Misc. Conduit, raceways & other wiring for Network Services -Tech Fee (FY 2013-2014)7/1/20137/1/20136/30/201410D-14004
CAMPUSBlanket: Disabilities Accommodations (FY 2013-2014)7/1/20137/1/20136/30/201410D-14002
CAMPUSProject for Bid on Metal roof damage storm of 2011 to include Project D-13209 Regal Soccer, D-13030 Sherri Lee Parker Stadium, D-14197 Boathouse, D-14196 ELC-2010 Lake Avenue, D-13283 Lindsey Nelson.10/23/20133/17/20146/30/201410D-14202
CAMPUSRepair/replace the roof at 1643 Cumberland Avenue. (XYZ) McMillian`s2/14/20137/1/20137/19/201395D-13447
CAMPUSFraternity Park - Install entrance wall/sign(s) similar to the other Campus main entrances. (CC) (C13)9/11/20129/16/20136/14/201325D-13157
CAMPUSFraternity Park - Relocate and rework dumpster locations. (CC) (C13)9/11/20127/10/20136/27/201450D-13156
CAMPUSFraternity Park - Improve landscaping to bring the Park up to Landscape Master Plan standards. Includes: Addition of Understory Trees and Accent Planting, Irrigation of Lawn and Landscape, Site Amenitites: (13) Site Benches, (9) Trash Receptacles, (25) Additional Trees, Site Amenitites: (10) Site Benches, renovate ballcourts, and Sidewalk Repairs. (CC) (C13)9/11/20127/10/20134/30/201480D-13155
CAMPUSGreen Project - Install flash tanks to trap high pressure traps to low side of building systems, allowing venting to low side steam system, and trappping then to condensate receivers.1/11/201311/18/20136/30/20140D-13393
CAMPUSGreen Project - Install water bottle filling stations. (2012-2014) (years 1 and 2 of 5) (Communications, Humanities, Nursing)1/11/20139/30/20136/30/201480D-13394
CAMPUSGreen Project - Reinsulate steam lines. (2012-2014) (years 1 and 2 of 5)1/11/20139/2/20136/27/201420D-13395
CAMPUSSite preparation for new Facilities Services Complex at 2000 Sutherland Avenue.5/30/201390D-13567
CAMPUSBlanket - general maintenance in classrooms to include replacing markers, erasers, seating repairs, painting, etc. (FY13)1/29/201350D-13410
CAMPUSGreen Project - Student Interns for FY 2013-20146/26/201310D-13627
CAMPUSCampus Building Security Upgrade.7/19/20137/22/20136/27/20145D-14054
CAMPUSFraternity Park- Install exterior lighting (front and rear) and security cameras for exterior coverage. (CC) (C13)9/11/20123/19/20135/16/201475D-13148
CAMPUSImprovements to Campus Entrances. Refurbising of plantings, lighting, and irrigation. (C13)5/1/20135/1/20136/30/201480D-13527
CAMPUSBlanket - Annual maintenance for water bottle filling fountains only. (FY1013 and FY 2014)1/11/20130D-13392
CAMPUSCONTINUATION OF D-10099 Replace transformers Perkins Hall, Andy Holt Tower, Communications, Humanities and McClung Tower. (CHANCELLOR-NR11) (CC) (C13)6/12/201330D-13593
CAMPUSGreen Project - Exterior Lighting Uprgades - Building Mounted.6/26/201311/4/201312/31/20145D-13621
CAMPUSGreen Project - Low flow plumbing fixtures. (2012-2014) (years 1 and 2 of 5)1/11/201312/2/20136/27/20141D-13396
CAMPUSProgramming for Engineering Services Building.4/8/20140D-14402
CAMPUSRepairs to roofs due to Storm Damage of April 2011.3/21/20140D-14365
CAMPUS1610 University Ave: Costs for consultants to assist with building evaluation & design work if is appears project will stay below $100,000.3/7/20140D-14345
CAMPUSGREEN PROJECT- MOG Education, Publicity & Support - Year 9 (2013-2014)6/26/201310D-13626
CAMPUS (Parking Lot N-16)Pave N-16 Lot (corner of Lake and 16th Street)5/9/20111D-11474
CAMPUS(Intramural Fields)Eradicate fire ants at Sutherland Ave. Intramural Fields.3/21/20141D-14362
CAMPUS-University CommonsRenovations to Bookstore in University Commons. ***deduct maglocks, security wiring, sound system & reduce contingency***8/7/20137/1/20148/1/20140D-14086
Carrick Hall NorthCarrick Hall N & S: basement abatement & repairs.3/21/20143/19/20148/1/20145D-14360
Carrick Hall SouthCarrick Hall South - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13254
CHEROKEE FARMSEradicate fire ants at Cherokee Farms.3/21/20141D-14363
Clarence Brown TheatreProvide shunt trip for sound system when fire alarm activates at Clarence Brown Theatre. (CC) (C13)2/20/20133/10/20144/18/201450D-13456
Clarence Brown TheatreProvide fire protection system for stage area and proscenium including fire separation curtain and re-initiation of deluge system at Clarence Brown Theatre. (CC)2/20/20130D-13459
Clarence Brown TheatreReplace wooden ramp to Lab Theatre with permanent ramp. (ADA) (NO LABOR)8/17/20121D-13108
Clarence Brown TheatreUpgrade stage lift controls at Clarence Brown Theatre.10/7/20131D-14185
College of NursingInstall laminated flooring in the entrance way to the College of Nursing. We are interested in having laminated flooring the same or similar to what was installed in Temple Hall.2/26/20140D-14333
College of NursingDis mantel Kardex (type) machine in room 301A College of Nursing and renovate space to include a workstation.3/18/20143/28/20144/30/201470D-14353
College of NursingCollege of Nursing - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13257
Communications and University Extension BuildingContinuation of D-12366 -- Build enclosed space(s) on third floor patio area at Communications.4/17/20140D-14410
Communications and University Extension BuildingAesthetic painting in the Dean`s Suite, 402G Communications in the Scripts Lab and the 4th & 3RD FLOOR CORRIDORS AS DISCUSSED BY Tiffany Shular, Michael Wirth, and Alice Wirth.11/26/20131/27/20146/2/201450D-14233
Communications and University Extension BuildingPaint Room 107F Communications and clean carpets.3/17/20144/4/20144/4/201450D-14352
Communications and University Extension BuildingPlaza roof replacement at Communictions/Student Services (XYZ) (Crisis) (C13)11/20/20131D-14224
Communications and University Extension BuildingRenovations to room 260/261/262 Communications. See attachments! ***Eliminate accordian door, base cabinet, and accompanying design***(C13)10/16/20133/17/20145/6/20141D-14191
Communications and University Extension BuildingInstall Ceiling & repair walls and floors in room 38 Comminications. Insta 4-110 dedicated outlets. This room is being renovated to house Vending Machines. Remove door and repair door frame.12/13/20134/15/20145/15/20145D-14263
Communications and University Extension BuildingCommunications - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13258
Communications and University Extension BuildingEstimate for work as designed in T-10514 on 4th floor Lobby in Communication outside the School of Information offices, Suite 451. Per designs by Keith Downen and team finalized 12/12/12.5/15/20133/10/20148/1/20141D-13554
Communications and University Extension BuildingInstall a two-plug power outlet in hallway 2991 just outside the doorway to Room 236 Communications. Please call Chief Engineer Mike Murrell for exact placement 974-5039.3/18/20140D-14356
Conference Center BuildingBlanket: Miscellaneous work as needed (FY 2012-2013)7/1/20127/1/20126/30/201310D-13001
Conference Center BuildingReplace the damaged concrete sidewalk around the exterior perimeter of the Conference Center to match existing exposed aggregate concrete. (CC)9/11/20121D-13128
Crops Genetic LaboratoryReplace roof at Crops Genetics. (Review Tile) (Repl slate) (XYZ)5/1/20120D-12448
Dabney-Buehler HallFume hood changes, 2nd floor of Buehler Hall: All of the work included in this PP28 relates to changes being made in research labs, in order to provide laboratory space for a new faculty member who starts 8/1/13. 1. Remove old existing 3-ft hood in Room 204C. Replace that hood with a similarly-sized ventilated cabinet. 2. Install a new 6-ft fume hood in Room 214A, which will tie in to the same 8-in fume hood trunk line as the cabinet in 204C. 3. Remove old existing 6-ft fume hood in Room 211. 4. Move newer existing 8-ft fume hood from Room 210 to replace the old hood in Room 211. (C13)9/12/20130D-14149
Dabney-Buehler HallClassroom Upgrade 2014 - Buehler Hall 4123/31/20140D-14372
Dabney-Buehler HallFume hood changes, 2nd floor of Buehler Hall: All of the work included in this PP28 relates to changes being made in research labs, in order to provide laboratory space for a new faculty member who starts 8/1/13. 1. Remove old existing 3-ft hood in Room 204C. Replace that hood with a similarly-sized ventilated cabinet. 2. Install a new 6-ft fume hood in Room 214A, which will tie in to the same 8-in fume hood trunk line as the cabinet in 204C. 3. Remove old existing 6-ft fume hood in Room 211. 4. Move newer existing 8-ft fume hood from Room 210 to replace the old hood in Room 211. (C13)9/12/20130D-14150
Dabney-Buehler HallDabney-Buehler Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (C13)11/2/20123/31/20148/31/20141D-13260
Dabney-Buehler HallAdd automatic openers at 4th floor entrance to Buehler.4/17/20140D-14411
Dabney-Buehler HallInstall a 208V single-phase 30 A cirduit for new piece of equipment which will have a NEMA L6-30 plug in room 217A Dabney Buehler.3/18/20140D-14354
Dabney-Buehler HallRenovation of research lab space for new faculty member. Please see attached PDF document for description. Further details will be worked out in consultation with Facilities Services personnel. 210, 211, 211A, 212, 214B Dabney-Buehler Hall (C13)9/12/201311/25/20135/30/201490D-14148
Dougherty Engineering BuildingDougherty Engineering - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (C13)11/2/20123/31/20148/31/20141D-13262
Dougherty Engineering BuildingMABE room 110 will be converted to Welding Lab. Clean & prep floor for new equipment. Add electrical & other service connections fornew welding equip. Add fume Hood. Add localized vent system for various welding stations.4/4/20140D-14398
Dougherty Engineering BuildingDougherty Repairs - Phase II (CONTINUATION OF D-10324) (C13)6/4/20137/1/20134/18/201490D-13575
Dougherty Engineering BuildingDisconnect the equipment in room 103b Dougherty, 14 disconnects. Reconnect after equipment is moved to 106M. 5 pieces. Move marked equipment to fireproof storage. Remaining equipment foes to surplus. Third Attempt.12/13/201312/27/20135/30/201490D-14262
Dougherty Engineering BuildingMABE Machine Shop, Room 102 Reconfigure (relocating various Machine tools), clean up, paint & forklift truck access to DO hallways & elevator. Add fume hood. Add electrical & other service connections for equipment in Prototyping Lab, rm. 110 and as necessary for equip to be reconfigured in room 102. see attached for more details4/4/20140D-14399
Early Learning CenterReplace storm damaged metal roof on ELC 2010 Lake Avenue. (XYZ)10/18/20131D-14196
Early Learning Centerin room 105 (middle room/gym) located in the Lake Ave ELC, we would like the flooring, including th carpet & tile at the entry way, removed and replace with tile.4/4/20140D-14400
Early Learning Center - Research & PracticeReplace built-up roof, windows, and masonry repairs at ELC-1206 White Avenue. (XYZ)5/1/20121D-12460
Early Learning Center - Research & PracticeELC - White Ave location. Room B003 needs corrections for code violation of the Tennessee Department of Health. See attached for all the details.4/3/20145/17/20146/20/20140D-14392
Earth and Planetary Sciences BuildingReplace roof and air handler serving classroom 302 EPS, (Crisis) (CC) replaces M-12100.1/14/20140D-14287
ETREC Johnson Animal Research BuildingReplace roofs damaged in storms of 4/25/11 & 4/27/11 at KES Johnson Animal Research. (Ins) (Cap/Rpl) (Metal and BU) (XYZ)7/2/20121D-13011
Facilities Services and Operations BuildingArchibus Phase I, II, & III.12/13/20132/5/20135D-14268
Ferris HallClassroom Upgrade 2014 - Ferris Hall 5113/31/20145/7/20148/25/20140D-14376
Ferris HallClassroom Upgrade 2014 - Ferris Hall 5103/31/20145/7/20148/25/20140D-14375
Ferris HallFerris Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13265
Ferris HallClassroom Upgrade 2014 - Ferris Hall 5023/31/20140D-14374
Food Safety and Processing BuildingReplace roof at Food Safety. (Ins) (Cap/Repl) (Review tile) (XYZ)5/1/20120D-12450
Frank G. Clement HallReplace cooling tower at Clement Using towers from Presidential.11/14/201375D-14219
Gibbs HallGibbs Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13266
Golf Team FacilityEradicate fire ants at the Golf Team Facility.3/21/20141D-14361
Goodfriend Tennis CenterReplace storm damaged metal roof on GoodFriend Tennis Center. (XYZ)10/18/20131D-14195
Goodfriend Tennis CenterInstall and set up new alarm system (maglocks) to work properly throughout Goodfriend Tennis Center. (C13)9/24/20121/21/20144/30/201450D-13175
Greve HallAdd electrical outlets on 5th floor Greve Hall for OIT to eliminate extension Cords.3/7/20144/7/20144/18/201470D-14344
Greve HallSwipe card security to be installed at entrance of the new Riggsby Marco Reading Room in 610 Greve Hall. 6th floor diagram attached (Marco Institute located in South wing offices). Please contact Vera P Broux at the contact phone and for other information.1/27/20143/7/20144/18/201475D-14305
Greve HallGreve Hall elevators ***elevator work only***3/28/20140D-14370
Greve HallGreve Hall; install a system that will allow occupants to legally prop open office doors without violating fire code. Two possible solutions were suggested to Bryan Lord: (C13)2/15/20138/23/20134/30/201495D-13449
Health, Physical Education, and Recreation BuildingRenovations to room 113 HPER for Theatre. (C13)8/27/20131/15/20145/30/201460D-14125
Health, Physical Education, and Recreation BuildingHPER 135, 135C, 135D, 135E: refurbish to accommodate teaching & laboratory space. We`d like to divide the room into adjoining rooms. Attached file has building plan on first page & then on proposed idea on second (the orientation is rotated, but current room numbers will indicate locations.) please see all attached sheets.1/17/20141/30/20147/1/201420D-14301
Hearing and Speech CenterHearing & Speech Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13268
Hesler Biology Building and GreenhouseRoom 615, insulate ceiling and provide temperature control. (MOE)3/3/20110D-11353
Hesler Biology Building and GreenhouseHesler Biology & Greenhouse - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13269
Hess HallHess Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (C13)11/2/20121D-13270
Holt Avenue Apartments Residence HallReplace loading dock as necessar to bring up level with door threshold and connect with handicap ramp at Holt Avenue Apartment Residence Hall. Reinstall bumpers & removable railings on completion.12/13/20134/8/20154/18/201480D-14266
Hoskins Library Chiller BuildingHoskins Library Chiller Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13271
Howard H. Baker Jr.Center for Public PolicyReplace dome and window flashing damaged in hailstorm of 4/27/11 at Baker Center. (XYZ)9/11/20120D-13014
Howard H. Baker Jr.Center for Public PolicyReplace flat roof sections of Baker Center. (XYZ)8/22/20121D-13122
Humanities and Social Sciences BuildingRenovate HSS 65, 112, 113, 114, & 115 and seminar rooms 62, 63, & 64 need Node chairs including a teacher table & ADA tables. Also need power supply for a ceiling mounted projector in room 63 & 65. This is a backup plan if the major renovation is not feasible.3/31/20145/7/20148/25/20140D-14379
Humanities and Social Sciences BuildingReplace steps and ADA ramp for Lot 9 at South End of Humanities. (NO LABOR) (C13)1/11/201311/11/20136/30/201450D-13231
Humanities and Social Sciences BuildingHumanities - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (C13)11/2/20123/31/20148/15/20141D-13272
Humanities and Social Sciences Parking GarageG-1 Entrance/exit lane of the McClung Garage. Currently there is not a sidewalk at the entrance to G1. Pedestrians commonly use the vehicles entrance/exit lanes for ease of access (the most direct route to the building where they are going). It is typical for the lower entrance to retain water that the storm drains cannot handle during heavy rain storms & floods. The entrance is located with hills on every side & is at or near the lowest grade level. Recommend solution. Suggestions: repave the ramp so that it slopes toward the drain, install another storm drain so that it can handle the water flow.8/9/20124/30/201480D-13095
James A. Haslam II Business BuildingHaslam BB 607: construct a floor to ceiling wall located as shown on attached plan & photo(1 & 2). Wall should be constructed in style/type sown on attachment #3. Doors should be centered on wall, of type shown in Attch#3 & stained to match other wood in area. Glass panels should extend from side wall to side wall. Location is approx. 14 ft from outside wall. See Attached.3/21/20140D-14364
James A. Haslam II Business BuildingJames A Haslam II Business Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (C13)11/2/20123/31/20147/31/20141D-13274
James D Hoskins LibraryJames D Hoskins Library - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (C13)11/2/20123/31/20148/31/20141D-13275
Jane and David Bailey Education ComplexJ & D BEC - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (C13)11/2/20124/15/20148/30/20141D-13276
Jessie W. Harris BuildingReplace Flat Roofs. (Crisis) (XYZ) (CC) replaces M-12099.1/16/2014-1D-14297
Jessie W. Harris BuildingThoroughly clean Jessie Harris room 211. Walls, bookshelves, radiator, corners, windows, etc. Also vacuum & shampoo Carpet. (This office should be eligible for free carpet shampoo)4/7/20140D-14401
Jessie W. Harris BuildingClassroom Upgrade 2014 - Jessie Harris 1043/31/20140D-14373
John C Hodges LibraryJohn C Hodges Library - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (C13)11/2/201212/2/20135/30/201460D-13277
John C Hodges LibraryRenovations for converting Hodges Library to 24/7 operation. Add emergency phones at every elevator stop at every floor. Add cameras (see Cpt. Lambert). Add lighting & power for device (laptops, phones, etc) chargers near elevators on each floor. Add security measurers to Volunteer Boulevard entrances (lasers). (C13)7/2/20125/20/20136/13/201495D-13034
John C Hodges LibraryPurchase and Install video surveillance cameras & software with correlation with UT Police Department & Facilities Services. Rick Caldwell is the project coordinator on the 3,4,5 & 6 floor that is now getting the same cameras installed. He has the specs.1/14/20140D-14295
John C Hodges LibraryInstall carpet tiles in the public areas of John C Hodges Library 3rd, 4th, 5th, & 6th floors. Need design advise to match the new carpet that was just installed in the core of the building, consult Keith Downen.12/13/20135/5/20146/13/20145D-14261
John C Hodges LibraryReplace drinking fountains In John C Hodges Library with a bottle filling station. Fountain ELKAY EZH20 Model LVRCGRN8WSK part# 154840. Just one on each floor 1, 3, 4, 5, & 6. Total of 5.3/18/20140D-14355
John D. Tickle Engineering BuildingTickle Building - move-in to facility after construction.5/9/20135/20/20134/30/201490D-13546
Kappa Sigma Fraternity HouseDesign services for roof replacement - replace roof (Maint) (XYZ)3/21/20118/1/20138/9/201350D-11394
Kingston Pike BuildingFacilities Services Design Group: Explore options & associated egress issues involved in splitting the KPB data center (room 139) into an "OIT" area & a "customer" area. A movable open type of barrier,such as chain link fencing, will be required to allow for movement of equipment and unobstructed air flow.1/27/20140D-14304
Lake Ave Early Learning Ctr (2nd bldg)Move a playground Gazebo (wooden Structure) from South Doyle High School to the UT Early Learning Center at Lake Avenue. Move cannot take place until the month of June 2013 because in June School will not be in session and children will not be disturbed at South Doyle. We would like the Gazebo moved to 2010/2016 Lake Avenue at the ELC Preschool Playground site. Contact Kathy Kidd for additional information regarding the move and the site it will be moved to. 865-755-20485/8/20138/6/20135/30/201460D-13541
Laurel Residence HallLaurel Residence Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (C13)11/2/201210/28/20132/28/201470D-13280
Law Complex: George C Taylor WingLaw Complex: George C Talor Wing - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13281
Law Complex: George C Taylor WingReplace existing carpet in 2nd floor Administrative Hallways at Law Complex and paint entire hallway.12/4/201350D-14251
Law Complex: George C Taylor WingReplace carpet in classroom 132 Law Complex. Work cannot begin until summer classes end in late July, 2014 and must be completed by Auagust 13, 2014.11/8/20130D-14215
Law Complex: Law Library and Classroom AdditionReplace carpet on 4th floor common space of Law Library with same carpeting that was put on 1st & 2nd floors last year. Was told that last date to order that particular carpet is March 3, because color is being discontinued.2/28/20145/26/20146/6/20141D-14339
Law Complex: Law Library and Classroom AdditionPaint 3rd floor Library Study Rooms 311, 313, 314, 322. Work needs to be completed in this fiscal year.4/4/20140D-14396
Law Complex: Law Library and Classroom AdditionReplace carpet on 3rd floor common space of Law Library with same carpeting that was put on 1st & 2nd floors last year. Was told that last date to order that particular carpet in March 3, because color is being discontinued.2/26/20145/12/20145/30/20141D-14331
Law Complex: Law Library and Classroom AdditionPaint 2nd floor Library Study Rooms 204, 206, 208, 212, 213. Work needs to be completed in his fiscal Year.4/4/20140D-14395
Law Complex: Law Library and Classroom AdditionLaw Complex: Law Library & Classroom Addition - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13282
Law Complex: Law Library and Classroom AdditionPaint Seminar Room 303 Law Complex. Also need to install additional electrical outlet. Work needs to be completed in this fiscal year.4/4/20140D-14397
Lindsey Nelson StadiumLindsey Nelson Stadium - Repair/Replace/Recover the Built-up roof and metal roof due to Storm Damage of April 2011 (XYZ) (C13)11/2/20124/15/20148/30/20141D-13283
Massey HallMassey Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13284
McClung Tower and PlazaClean blinds in room 912 McClung Tower.2/15/20134/30/201495D-13452
McClung Tower and PlazaMcClung Tower - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13286
McClung Tower and PlazaMcClung Tower room 1006- Paint & new carpet, Room 1014 Remove built-in desk and Bookshelves; paint & new carpet, Room 1016 remove built-in desk & bookshelves, paint & new carpet. ***Work to be completed during the Month of June, 2014. Offices will not be vacated until 6/1/14***3/10/20140D-14349
McCord HallReplace roof at McCord Hall. (Ins) (Cap/Repl) (Replace east tile, review west tile) (XYZ)5/1/20121D-12453
Melrose HallMelrose Hall room 108 New carpet for Reception Area. As this is a high traffic area we would like carpet designed for heavy traffic. WE would like to see some samples of the higher grade carpet available. Perhaps the carpet that was installed at the international House last year. Reference to D-13204 & D-13236.4/9/20140D-14404
Melrose HallMelrose Hall room E207: install air conditioning unit, install electrical outlet for AC unit, remove all furniture from office (including built-in desk)(and store furniture for near furture use), remove mirror and shelves attached to wall, replace blinds, patch walls, paint walls (pleas do not paint windows shut). Please check radiator to be sure it is in food working condition.2/21/20140D-14327
Middlebrook BuildingMiddlebrook Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (C13)11/2/20124/15/20148/30/20141D-13288
Min H. Kao Electrical Engineering & Computer ScienceAdd swipe locks to the following room doors with dual access control by CURENT & Police department. Hallway doors in Min Kao rooms 101, 107, 121A, 121B, 124 (2 doors), 125, 402, 411,412, 530, 531, 532, 533, 554. & 555. Access additions & removal of personnel to these rooms will be directly CURENT for safety reasons.5/9/20133/10/20145/16/201450D-13548
Min H. Kao Electrical Engineering & Computer ScienceMin Kao - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13289
Min H. Kao Electrical Engineering & Computer ScienceMin Kao 639: Provide a CAT6 RJ-45 connection in the existing floor box to carry audio and video signals from the floor box to a new recessed box located on the brick wall behind the existing LED TV. Provide and install two table-mounted cable access enclosures and patch cables for extending 120v electrical power, CAT6 network, telephone, and A/V connections (VGA, Mini-jack Audio, HDMI) from the existing floor box to the table top. Contact Randy Bond (4-3836, rbond@utk.edu) and Michael Berger (4-0599, mberger@utk.edu) to discuss project details.3/18/20140D-14358
Min H. Kao Electrical Engineering & Computer ScienceAdd cooling water for electrical experiments to be used by researchers in room 101, 117, 117A, 117B and 125 Min Kao. Each room shall have a minimum of 1 outlet and 1 inlet controlled via ball valves. Water temperature is not an issue by condensation on pipes should be minimized. The total load will be 50KW or less. Any attached research equipment may use fast acting water valves. Dan Smith has further info.6/21/20130D-13614
Min H. Kao Electrical Engineering & Computer ScienceInstall Ice Guards on metal roof of Min Kao. (Crisis Maintenance) (C13)10/18/2013-1D-14198
Min H. Kao Electrical Engineering & Computer ScienceMount a NEMA 1 steel enclosure, 12"H x 10"W x 6"D (provided by requestor)on south wall close to distribution panel. Run one 3/4" conduit up to a junction box above the ceiling for 24V control wire (provided by requestor). Run a second 3/4" conduit down to a junction box under the floor for a 24V control wire (provided by requestor). Provide dedicated 120V, 15A circuit to NEMA enclosure. Add a parallel 120V shunt trip circuit for the main 600A breaker in the distribution panel. This circuit will be run through a ABB/Jokab Safety RT6 115 AC relay (P/N 2TLA010026R0400) (provided by requestor).12/19/20133/10/20145/2/201485D-14275
Morgan HallInstall power & network Jack in corner by the window/round table in room 101 Morgan Hall.10/16/20130D-14192
Morgan HallRenovations to Morgan Hall room 104. See attached for details2/10/20143/10/20145/2/20141D-14319
Morgan HallMorgan Hall 226 - classroom Upgrade. Carpet, ceramic boards, paint & audio/visual.3/31/20145/7/20148/25/20140D-14377
Morgan HallRemove and reinstall Kiosk on the first floor. Prepare walls for monitors. Remove sculptures and hang in new location. Refinish & paint wall where needed.11/9/20100D-11186
Morgan HallReplace roof on Morgan Hall. (Ins) (Cap/Repl) (Review tile) (XYZ)5/1/20121D-12454
Natalie L. Haslam Music CenterMusic Center Installation of 10 New Glass Boards.3/31/20145/7/20148/25/20140D-14386
Neyland-Thompson Sports CenterNeyland-Thompson Sports Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13291
Nielsen Physics BuildingNielsen Physics Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13292
Nielsen Physics BuildingNielsen Physics room 304: Audio/Video ONLY.3/31/20145/7/20148/25/20140D-14387
Nielsen Physics BuildingRenovate lab space in 506 & 507 Nielsen Physics into office space for Graduate Research Assistant`s research work and Study Area. Provide layout, office landscape partitions, electrical and network connections. This work has to be coordinated with establishing astronomy laboratory in Nielsen 108 in connection with the planetarium project. (SERFHOODS) (CC) (C13)11/29/20122/3/20145/30/201450D-13333
Outdoor Tennis Center BuildingOutdoor Tennis Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13293
Panhellenic BuildingReplace roof at Panhellenic. (Ins) (XYZ) (C13)5/1/20123/24/20146/30/201480D-12455
Panhellenic BuildingCorrections in Panhellenic to allow use of building during Student Union construction. (C13)10/29/201311/5/20134/18/201495D-14209
Perkins HallReplace roof at Perkins Hall. (Ins) (Cap/Rpl) (Ck Tile) (XYZ)5/1/20121D-12456
Perkins HallReplace exhaust fan serving hoods in 57A/57B in Perkins Hall.4/9/20140D-14403
Phi Kappa Psi Fraternity HouseReplace roof on Phi Kappa Psi Fraternity House. (Maint)5/3/20128/13/201295D-12464
Philander P. Claxton Education BuildingContinuation of M-12105: SFMO corrections at Philander P Claxton Education Building.1/3/20140D-14278
Philander P. Claxton Education BuildingReplace roof at Philander Claxton. (Ins) (Cap/Rpl) (Ck Tile) (XYZ)5/1/20124/15/20148/31/20141D-12457
Pi Kappa Phi Fraternity HousePi Kappa Phi Fraternity 1828 - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (C13)11/2/20121/6/20142/28/201410D-13294
Plant Biotechnology BuildingPBB B001 disconnect & remove two Percival growth chambers from center room of Racheff GH & move to room B001 PBB. & reconnect. Unit will be converted to water cooled so new plumbing will need to be connected as well. PI will cover conversion cost. Conversion will occur after chambers have been moved to biotech so this will cause a delay for the plumbing portion. Room should be surveyed for adequate water & electrical lines, we request Tim Tomlinson given his knowledge of the building. Attached is the original PP28 estimate T-11078 when we requested the chambers to be moved without the water cool adjustment.2/28/20144/14/20145/30/201410D-14335
Plant Biotechnology BuildingPBB room 160: Audio/Video ONLY.3/31/20145/7/20148/25/20140D-14384
Plant Biotechnology BuildingPBB room 113: Audio/Video ONLY.3/31/20145/7/20148/25/20140D-14385
Plant Biotechnology BuildingReplace window awnings damaged in hail storm on 4/27/11 at Plant Biotech. (XYZ)7/2/20120D-13012
Plant Biotechnology BuildingPlant Biotechnology Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (C13)11/2/20121D-13295
Pratt PavilionRepair or replace window flashing & lightning rods damaged in storms on 4/25/11 & 4/27/11 at Pratt Pavilion. (XYZ)9/11/20121D-13013
Presidential CourtProvide ventilation in CO2 tank room of Presidential Court.10/21/20135D-14200
Presidential CourtAdd ductwork to provide ventilation to office on 3rd floor at Presidential Court.4/14/20140D-14407
Publications and Services BuildingReplace metal roof damaged in hail storm on 4/27/11 at Publications & Services. (Ins) (XYZ)7/2/20120D-13028
Racheff ResearchRenovations including back-up generator for non-life safety process use and HVAC controls. (C13)8/1/20112/11/20134/25/201455D-12059
Racheff ResearchNew sidewalk needed to connect parking surface outside Racheff GH to new entry. Sidewalk to slope from the edge of the parking lot & connect to the existing slab just outside of the new entrance. Old Entrance is now closed due to GH redesign. Additionally a large slab should be added just past the new entrance for various applications. See Attached Photo`s (2) for details.2/28/20144/28/20145/19/20140D-14336
Radiological Safety - Old Cherokee TrailRadiological Safety - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13297
Reese Hall ChillerReese Hall Chiller - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13299
Regal Soccer StadiumReplace metal roofs damaged in hail storm on 4/27/11 at Regal Soccer Stadium. (Ins) (XYZ) (C13)7/2/20123/17/20146/30/20140D-13029
Science and Engineering BuildingRepairs for 4th floor entrance skylight at SERF. (Crisis) (CC) (C13)5/1/20128/13/20134/30/201480D-12444
Science and Engineering BuildingInvestigate feasibility of installing two 8 foot hoods in room 518 SERF. (CC) (SERFHOODS) (C13)1/23/20128/30/20134/25/201470D-12288
Science and Engineering BuildingSERF - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20124/15/20141D-13300
Science and Engineering BuildingAdd new, laboratory grade counter top to center island of floor cabinets in SERF 702. Provide drop down electricity to island (power is available above) Dean Wessels is familiar with project and has bee involved with preliminary planning.3/10/20140D-14347
Science and Engineering BuildingAdd cabinet to the right of newly installed fume hood in 702 SERF Dean Wessels is familiar with the project.3/10/20140D-14348
Science and Engineering BuildingRevolving fund - Retrofit light fixtures in elevator lobbies. (C13)10/29/201312/2/20134/4/201490D-14204
Science and Engineering Building•Prepare an appropriate size and material ventilation duct system to support two radiological glove boxes, connecting the outflow to my nuclear-grade HEPA filtered stacks in 531/531A. The ducting should be routed in 522 such that we can connect the "last mile" to the facility ducting with flexible connections to accommodate any adjustments in the final layout. • We will also need to make sure we have necessary electrical service to the boxes. • The door from 522 into the adjacent lab should be removed and drywalled over • The room should be maglocked like the rest of my labs9/23/20131/13/20145/30/201430D-14165
Science and Engineering BuildingAdd one fume hood to room 702 SERF. (CC) (SERFHOODS) (C13)11/19/20121/6/20134/25/201450D-13330
Science and Engineering BuildingInstall seating in offset area of elevator lobby on 5th floor of SERF.1/10/20141D-14285
Science and Engineering BuildingInstall seating in offset area of elevator lobby on 7th floor of SERF.1/9/20141D-14284
Sherri Parker Lee StadiumReplace metal roofs damaged in hail storm on 4/27/11 at Sherri Parker Lee Stadium. (Ins) (C13) (XYZ)7/2/20120D-13030
South & East StadiumReplace siding & window flashing damaged in hail storm on 4/27/11 at Neyland Stadium West Skybox/Club. (XYZ)9/11/20120D-13027
South & East Stadium2014 Football Season - Gameday coverage and cleanup.3/26/20140D-14369
South & East StadiumFacilities Services Support of Orange & White Game April 2014.7/1/20134/1/20146/30/20141D-14026
South & East StadiumAssist Longent with the installation of the DAS at Neyland Stadium. This will include mainly high voltage and Fire Alarm Work.3/28/20140D-14371
South & East StadiumNeyland Stadium Structural Review of West Side Bleachers.4/16/20140D-14409
Stadium Drive Parking Garage-G10Green Project - Evaluate installation of Photovoltaic system on G-10 garage. (Stadium Drive Parking Garage) (SI)3/27/20130D-13486
Steam PlantSteam Plant - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13303
Stokely Management CenterRenovation of Lounge Service Area in SMC 710. See attached for details.3/6/20140D-14343
Stokely Management CenterStokely Management Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13304
Stokely Management CenterSMC 5th floor common areas: 1. Repair & repaint walls of common areas as shown on attached plan. Colors TBD by department. 2. Replace carpet in common areas with carpet tiles. Pattern to be chosen by department. Room numbers & door mounted name plates will be replaced with units matched to those used on the 3rd floor SMC. (Marketing Dept) 4. Outside of elevator door will be cleaned and repainted. Common Areas are 599, 599A,B,C,D; 527, 521B, 505A,B,C. Tiffany Shuler will assist the department with paint & carpet colors.12/9/20130D-14256
Stokely Management CenterReplace doors from basement to vestibule between G2 & G4 SMC. Replace doors from plaza to G2. Also includes handrail replacement around area wells. (C13)2/19/201312/13/20136/30/201440D-13455
Stokely Management CenterRenovate 7th floor SMC. See attached work list and drawings.2/11/20140D-14321
Stokely Management CenterClean carpet in room 627 SMC.8/9/20134/30/201495D-14093
Stokely Management CenterReplace Fire Alarm System. (FACPL) (ADA) (No labor) (C13)9/30/20116/11/20124/30/201495D-12149
Student Aquatic CenterStudent Aquatic Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (C13)11/2/20121D-13305
Student Recreational and Fitness CenterReplace the green carpet located next to the bike rack on the TRECS plaza with a concrete pad. (C13)8/9/20134/30/20140D-14091
Student Services BuildingInstall drain and pour concrete floor in the areaway at Student Services. Trim bushes down to knee height. Install brick curbing around areaway. (C13) (continuation of M-14081)1/7/20140D-14280
Student Services BuildingSSB - remove 407C & D cubicles; remove old & build new wall indicted between 409A & 409B1; remove old & build new wall indicted between 409A & 407; remove glass hallway window in 407 & replace with wall; add door so conference room 409B7 can also be accessed from 412A as indicted on attachment. New Conference Room 409A will need repainted & recarpeted to match 409. (C13)12/18/20125/22/20134/11/201496D-13369
Student Services BuildingStudent Services Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13308
Temple HallInstall L530 circuit/outlet for UPS for server in B001 Temple Hall. Location should be near 4 port power outlet and network ports.4/4/20140D-14394
Temple HallFacilities Services support for Phase II renovations (C13)8/8/20137/1/20134/25/201495D-14090
Thompson-Boling Assembly Center and ArenaBlanket: Miscellaneous work as needed (FY 2012-2013)7/1/20127/1/20126/30/201390D-13003
Thompson-Boling Assembly Center and ArenaBlanket: Miscellaneous work as needed (FY 2013-2014)7/1/20137/1/20136/30/20145D-14003
Thompson-Boling Assembly Center and ArenaProvide ventilation in TV equipment room.12/30/20080D-09205
Thompson-Boling Assembly Center and ArenaBlanket: HVAC Water Treatment (FY 2013-2014)7/1/20137/1/20136/30/201410D-14007
Thornton Athletics Student Life CenterThornton Athletics Student Life Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/201210/21/20132/14/201485D-13310
Tom Black Track Facilities BuildingReplace metal roof damaged in hail storm on 4/27/11 At Tom Black Track. (Ins) (XYZ)7/2/20120D-13031
UT Welcome CenterReplace roof at Welcome Center. (Ins) (Cap/Rpl) (XYZ) (C13)5/1/20121D-12459
UT Welcome CenterAdditional improvements to the UT Welcome Center including exterior repairs and painting, cameras, awning, etc. (C13)6/26/201310/5/20135/22/201460D-13620
Veterinary Teaching HospitalVeterinary Teaching Hospital - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13311
Volunteer HallNew storefront doors to be install on all exterior doors leading onto the courtyard at Volunteer Hall. See attached shop drawings & quote from Tennessee Skyline Glass. Please Contact Lucinda Moore 865-974-3606 with any questions.3/24/20145/1/20145/23/20140D-14367
Volunteer HallVolunteer Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13312
Walters Life Sciences BuildingInstall 4 dedicated 115v - 20a circuits on emergency power to the west wall. Relocate thermostat from D105 to D107 in WLS.4/14/20140D-14408
Walters Life Sciences BuildingProgramming for Walters Life Sciences.7/13/20125D-13053
Walters Life Sciences BuildingWLS Room M309: Audio/Video ONLY3/31/20145/7/20148/25/20140D-14388
Walters Life Sciences BuildingWalters Life Sciences Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13313
West Skybox AdditionRenovations to rooms 501 & 502 to create one space in West Skybox of Neyland Stadium. (S14)3/24/20148/1/20140D-14366
West Skybox AdditionInstall access controls in West Skyboxes where already roughed in.10/28/20130D-14206



 