Current Summer Projects (2014):

 

BUILDINGDESCRIPTIONDATE APPROVEDSCHED TO BEGINSCHED TO COMPLETE% COMPLETEPROJECT NUMBER
Biosystems Engineering and Soil Science Labs BuildingReplace roofs damaged in hailstorm on 4/27/11 at BEES Office Building. (BU and tile) (Ins) (Cap/Repl BU) (XYZ) (C13) (S14)7/2/201285D-13016
Dougherty Engineering BuildingDougherty Engineering - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (S14) NEW PROJECT 7/1/14 D-1506511/2/201210/27/20142/27/20151D-13262
ETREC Johnson Animal Research BuildingMetal roof replacement at ETREC Johnson Animal Research Building. (XYZ) (S14) (C14)5/22/201410/20/20143/31/201515D-14440
Lindsey Nelson StadiumLindsey Nelson Stadium - Repair/Replace/Recover the Built-up roof and metal roof due to Storm Damage of April 2011 (XYZ) (S14)11/2/201211/24/20141/30/201510D-13283



Current Open Projects (ALL):

BUILDINGDESCRIPTIONDATE APPROVEDSCHED TO BEGINSCHED TO COMPLETE% COMPLETEPROJECT NUMBER
11th Street Parking Garage11 Street Parking Garage flat roof over UTPD - Repair/Replace/Recover roof due to Storm Damage of April 2011 (XYZ)10/23/20140D-15279
Alumni Memorial BuildingCorrections to stage curtain headblock at Alumni Memorial Building.8/19/20140D-15211
Anderson Training CenterSet up Elevator # 1 at Anderson Training Center so that to operate it will require a SmartCard/VolCard. Contact Scott Zurcher @ 617-731810/10/20140D-15264
Andy Holt TowerAndy Holt Tower - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (FP)11/2/20121D-13242
Art and Architecture BuildingCONTINUATION OF D-14412--Studio electrical renovations all 3rd and 4th floor studios College of Architecture and Design. (C14)7/1/20144/17/20141/9/201595D-15002
Art and Architecture BuildingCONTINUATION OF D-13630 -- Install Cameras in wood shop for safety & security at A & A. (C14)7/1/20141/13/201412/19/201495D-15021
Art and Architecture BuildingCONTINUATION OF D-13039--Replacement or possible upgrade for our current swipe card system at 2nd floor bridge stairs, stairs at 1st level atruim; loading dock area. Installing a new swipe card system in the main administratice offce room 224. (C14)7/1/201412/2/20131/9/201595D-15006
Art and Architecture BuildingNew electrical panel I drop down Receptacles from track, outlet connectors- rooms 307, 313, 317 @ A & A. Need ASAP (C14)6/24/20147/14/20141/9/201595D-15084
Art and Architecture BuildingArt & Architecture Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (FP)11/2/20121D-13243
Art and Architecture BuildingRemove carpet in room 336 and place sealer on concrete.12/18/20140D-15320
Austin Peay BuildingAustin Peay Building - Repair/Replace/Recover the flat roof sections due to Storm Damage of April 2011 (XYZ)10/23/20140D-15278
Ayres HallAyres Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/201212/15/20143/7/20151D-13246
Biosystems Engineering and Soil Science Labs BuildingReplace roofs damaged in hailstorm on 4/27/11 at BEES Office Building. (BU and tile) (Ins) (Cap/Repl BU) (XYZ) (C13) (S14)7/2/201285D-13016
Biosystems Engineering and Soil Sciences Office BuildingRepair/Replace/Recover flat roof section on BEES Office Building due to Storm Damage of April 2011 (XYZ)10/23/20140D-15281
Black Cultural CenterReplace fan shrouds, or replace fans damaged in hailstorm on 4/27/11 at Black Cultural Center.7/31/20120D-13017
Blount HallBlount Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/201211/24/20142/27/201590D-13249
BoathouseBlanket: Maintenance as needed (FY 2012-2013)7/1/20127/1/20126/30/20130D-13008
Brehm Animal Science BuildingFrame in wall with door to create a private office in 149 Brehm Animal Science. (C14)10/24/201412/15/20141/9/20151D-15282
Brenda Lawson Athletic CenterBrenda Lawson Athletic Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13250
Brenda Lawson Athletic CenterInstall door security at entrances of Brenda Lawson Center.7/18/20140D-15170
CAMPUSCONTINUATION OF D-13565 -- Installation of electric, water and condensate metering in academic, reaseardh & administration buildings. (Chancellor-NR11) (CC) (S13) (C14)7/1/20147/1/20137/30/201520D-15017
CAMPUSBlanket - general maintenance in classrooms to include replacing markers, erasers, seating repairs, painting, etc. (FY15)8/6/20140D-15199
CAMPUSCONTINUATION OF D-14176: Housing Master Plan for Presidential Court Complex.7/1/201430D-15118
CAMPUSDamages from storm on July 27-28, 2014.8/4/20147/28/201490D-15198
CAMPUSLimited Campus Concrete Sidewalk Repairs (BC)9/15/20149/16/201412/31/20140D-15237
CAMPUSFacilities Services support for the Hill Master Plan9/16/20140D-15239
CAMPUSProjects for Bid on Metal roof damage storm of 2011 to include Project D-D-13028 Publications & Services, D-13031 Tom Black Track, D-15183 Neyland Biology Annex, D-15183 Pratt Pavilion.7/29/20141D-15185
CAMPUSInstall 110 volt circuit at the Panda Express Raising Cane`s location. The outlet needs to be placed just left of the door. Please see Brianna Wilkerson for details on location.12/18/20140D-15322
CAMPUSCONTINUATION OF D-13626 GREEN PROJECT - MOG Education, Publicity & Support - Year 10 (2014-2015)7/1/20145/19/20145/23/20140D-15057
CAMPUSBlanket: Disabilities Accommodations (FY 2012-2013)7/1/20127/1/20126/30/201310D-13002
CAMPUSRepairs to roofs due to Storm Damage of April 2011. (XYZ) (Ins)3/21/20140D-14365
CAMPUSCONTINUATION OF D-13593 -- Replace transformers @ Perkins Hall, Andy Holt Tower, Communications, Humanities & McClung Tower. (CHANCELLOR-NR11) (CC) (S13) (C14)7/1/20145D-15018
CAMPUSCONTINUATION OF D-13395 -- Green Project - Reinsulate Steam Lines (2014-2015) (year 3 of 5)7/1/20149/2/20146/30/20150D-15013
CAMPUSBlanket: Misc. Conduit, raceways & other wiring for Network Services -Tech Fee (FY 2012-2013)7/1/20127/1/20126/30/20130D-13004
CAMPUSBlanket: Campus Beautification (FY 2012-2013)7/1/20127/1/20126/30/20130D-13005
CAMPUSCONTINUATION OF D-14054 -- Campus Building Security Upgrade7/1/20147/22/201312/31/20145D-15022
CAMPUSBlanket - general maintenance in classrooms to include replacing markers, erasers, seating repairs, painting, etc. (FY13)1/29/201350D-13410
CAMPUSGreen Project - Install flash tanks to trap high pressure traps to low side of building systems, allowing venting to low side steam system, and trappping then to condensate receivers. D-133931/11/201311/18/20136/30/20150D-13393
CAMPUSBlanket - Annual maintenance for water bottle filling fountains only. (FY1013 and FY 2014)1/11/20130D-13392
CAMPUSGreen Project - Exterior Lighting Upgrades - Building Mounted. Continuation of D-136217/1/201411/4/201312/31/201410D-15019
CAMPUS (Pat Summitt Statue)Annual maintenance of Pat Summitt statue for spring 2015.11/26/20140D-15310
CAMPUS-Green ProjectCONTINUATION OF D-13396 Green Project - Low flow plumbing fixtures. (2014-2015) (year 3 of 5)7/1/20147/1/20146/30/20150D-15075
CAMPUS-Green ProjectCONTINUATION OF D-13394 Green Project- Install water bottle filling stations. (2014-2015)7/1/20149/30/20136/30/20151D-15074
Carrick Hall NorthSimplex Fire Alarm Testing - Complete test with 50% of the devices cleaned and 50% of the devices tested. Please provide a complete report upon completion. (C14)11/26/201412/15/20141/9/20151D-15300
Carrick Hall SouthSimplex Fire Alarm Testing - Complete test with 50% of the devices cleaned and 50% of the devices tested. Please provide a complete report upon completion. (C14)11/26/201412/15/20141/9/20151D-15301
CHEROKEE FARMSProvide alarm monitoring in the Vault at Cherokee Farms. Monitoring should include water, access & temperature.9/9/20140D-15232
CHEROKEE FARMSReplace fence at Cherokee Farms with our Campus Standard around the Generator.8/4/201411/24/20142/20/20151D-15197
Clarence Brown TheatreUpgrade stage lift controls at Clarence Brown Theatre. (C14)10/7/201312/22/20141/11/20151D-14185
Clarence Brown Theatrecontinuation of D-13459 : Provide fire protection system for stage area and proscenium including fire separation curtain and re-initiation of deluge system at Clarence Brown Theatre. (CC)7/1/20142/20/201312/31/20140D-15148
College of NursingProvide new signs with rooms numbers and Braille signage to meet ADA.12/3/20140D-15315
College of NursingCollege of Nursing - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (FP)11/2/20121D-13257
Communications and University Extension BuildingRemove door that enters from hallway on NW side to room 440 Communications as shown in 4th floor plan layout 1133 sheet 4 of 5 dtd 5/18/12. Opening to be sealed/drywall and painted. (C14)8/28/201412/15/20141/31/20150D-15222
Communications and University Extension BuildingRemove existing solid wood doors to Rooms 447 & 441 shown on 4th floor plan 1133, dtd 5/18/12. Doors are left & right of observer facing No exiting elevators on 4th floor lobby Communications. Replace with new doors with glass pane to rooms 447 & 441.8/28/20140D-15223
Communications and University Extension BuildingInstall acoustical ceiling to reduce noise in the CCI 3rd floor lobby Communications. (C14)7/11/201412/15/20141/9/20151D-15157
Communications and University Extension Building321 Communications Building, Patrick Auditorium, minor renovations. Please see attached for details. (C14)11/12/201412/5/201412/19/201450D-15289
Communications and University Extension Building402 Communications Building, Scripps Theatre, minor renovations. Please see attached details.11/12/201412/5/20141/9/201550D-15290
Communications and University Extension BuildingContinuation of D-12366 -- Build enclosed space(s) on third floor patio area at Communications.4/17/20140D-14410
Communications and University Extension BuildingPaint Room 107F Communications and clean carpets.3/17/20144/4/20144/4/201480D-14352
Communications and University Extension BuildingPlaza roof replacement at Communictions/Student Services (XYZ) (Crisis) (C14)11/20/201312/4/20142/27/20151D-14224
Communications and University Extension BuildingAdd additional insulation to the three small practice rooms in the newly renovated Public Communication Center as speech is still audible. *Has spoken to Jeff Barnes about options to resolve problem.10/8/20140D-15262
Communications and University Extension BuildingCommunications - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (FP)11/2/20121D-13258
Conference Center BuildingInstall new carpet per estimate T-11129 in 212 CCB. Furniture Vendor will be handling removal & installation of furniture.5/15/201411/2/201412/5/201495D-14430
Conference Center BuildingRepair wall and repaint in rooms 313B, 313C, 313D1 and 313E.11/20/201412/11/201412/12/20140D-15298
Conference Center BuildingBlanket: Miscellaneous work as needed (FY 2012-2013)7/1/20127/1/20126/30/201310D-13001
Dabney-Buehler HallAdd automatic openers at 4th floor entrance to Buehler. (ADA) (No Labor) (C14)4/17/201410/15/201412/31/201425D-14411
Dougherty Engineering BuildingRenovation of Dougherty Engineering 103. Please see attached for more details. (C14)10/16/201411/3/201412/31/201495D-15272
Dougherty Engineering BuildingInstall campus standard fencing and provide metal roof at the loading dock of Doughtery Engineering.11/17/20140D-15295
Dougherty Engineering BuildingReplace furnace control panel in Dougherty 228 with a traditional breakerbox for bench top furnace use. Divide power in several circuits: ie (2) 50 amp, (3) 30 Amp, (4) 20 Amp, or something similar based on current available. Circuits to be run at later date.12/5/20140D-15316
Dougherty Engineering BuildingMABE room 110 will be converted to Welding Lab. Clean & prep floor for new equipment. Add electrical & other service connections for new welding equip. Add fume Hood. Add localized vent system for various welding stations. (C14)4/4/20149/29/201412/31/201485D-14398
Dougherty Engineering BuildingMABE Machine Shop, Room 102 Reconfigure (relocating various Machine tools), clean up, paint & forklift truck access to DO hallways & elevator. Add fume hood. Add electrical & other service connections for equipment in Prototyping Lab, rm. 110 and as necessary for equip to be reconfigured in room 102. see attached for more details. (C14)4/4/20149/9/201412/31/201470D-14399
Dougherty Engineering BuildingDougherty Engineering - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (S14) NEW PROJECT 7/1/14 D-1506511/2/201210/27/20142/27/20151D-13262
Dougherty Engineering BuildingDougherty 429: Needs new paint, carpet, and possible wiring for new student cubicals. The audio visual equipment (including the projector screen) needs to be removed. Our new Governor`s Cahir , Dr. Ragauskas, will need the space for students. Preferabley this is to be done over winter break. The room must be completd by January 1, 2015.10/21/20140D-15275
Dunford HallReconstruct space on First floor Dunford Hall for Disability Services.12/1/20140D-15314
Early Learning Centerin room 105 (middle room/gym) located in the Lake Ave ELC, we would like the flooring, including the carpet & tile at the entry way, removed and replace with tile.4/4/20140D-14400
Early Learning Center - Research & PracticeReplace built-up roof, windows, and masonry repairs at ELC-1206 White Avenue. (XYZ)5/1/20121D-12460
Earth and Planetary Sciences BuildingCONTINUATION OF D-14287 Replace roof & air handler serving classroom 302 EPS. (Crisis) (CC) (replaces M12100)7/1/20145/19/201410/31/201495D-15073
ETREC Johnson Animal Research BuildingMetal roof replacement at ETREC Johnson Animal Research Building. (XYZ) (S14) (C14)5/22/201410/20/20143/31/201515D-14440
Facilities Services and Operations BuildingCONTINUATION OF D-14268 Archibus Phase I, II, & III. (C14)7/1/20142/5/20136/30/201550D-15053
Facilities Services Utilities Maintenance BuildingModifications to rooms 108 and 110 in the Construction Arera to serve as FSEOC12/10/20140D-15317
Ferris HallFerris Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/201210/27/20142/27/201595D-13265
Food Safety and Processing BuildingReplace flat roof sections at Food Safety. (Ins) (Cap/Repl) (Review tile) (XYZ)10/23/20140D-15277
Frank G. Clement HallSimplex Fire Alarm Testing - Complete test with 50% of the devices cleaned and 50% of the devices tested. Please provide a complete report upon completion. (C14)11/26/201412/15/20141/9/20151D-15308
Frank H. McClung Museum of Natural History and CultureClean Monty the Dinosaur at McClung Museum8/15/20140D-15206
Fraternity Park Fraternity Park- Install security cameras for exterior coverage. *Continuation of D-131487/1/20147/10/201312/19/201495D-15008
Goodfriend Tennis CenterReplace storm damaged metal roof on GoodFriend Tennis Center. (XYZ)10/18/20131D-14195
Greve HallGreve Hall hallway between rooms 218 & 219. Need plexiglass sign the same as photo attached, made & mounted on the wall. See project D-13140 from August 2012 for deminsions. Remove "The" and remove "Center" so that the sign reads Student Success (1st line), and your future, your success (2nd Line). (BC)8/20/20140D-15212
Hearing and Speech CenterHearing & Speech Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (FP)11/2/20121D-13268
Hesler Biology Building and GreenhouseMake improvements to humidification systems for the snake rooms at Hesler Biology.7/17/20140D-15166
Hesler Biology Building and GreenhouseRoom 615, insulate ceiling and provide temperature control. (MOE)3/3/20110D-11353
Hesler Biology Building and GreenhouseContinuation of D-13269: Hesler Biology & Greenhouse - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (Ins)7/30/20140D-15189
Hess HallSimplex Fire Alarm Testing - Complete test with 50% of the devices cleaned and 50% of the devices tested. Please provide a complete report upon completion. (C14)11/26/201412/15/20141/9/20151D-15304
Howard H. Baker Jr.Center for Public PolicyReplace flat roof sections of Baker Center. (XYZ) (C14)8/22/201212/15/20143/27/20151D-13122
Howard H. Baker Jr.Center for Public PolicyReplace dome and window flashing damaged in hailstorm of 4/27/11 at Baker Center. (XYZ)9/11/20120D-13014
Humes HallSimplex Fire Alarm Testing - Complete test with 50% of the devices cleaned and 50% of the devices tested. Please provide a complete report upon completion. (C14)11/26/201412/15/20141/9/20151D-15303
James A. Haslam II Business BuildingCONTINUATION OF D-14364 Haslam B B 607: construct a floor to ceiling wall located as shown on attached plan & photo (1 & 2). Wall should be constructed in style/type shown on attached # 3. Doors should be centered on wall, of type shown in Attch # 3 & s7/1/20145/19/201412/19/201490D-15033
James A. Haslam II Business BuildingRenovations to 613/614 James A Haslam Business Building. See attacheted list for details.11/3/201411/13/20141/30/201575D-15287
James D Hoskins LibraryCONTINUATION OF D-13275 Repai/replace/recover the built-up roof due to Storm Damage of April 2011 (XYZ) (C14)7/1/201410/6/20141/30/201580D-15069
Jessie W. Harris BuildingJessie Harris Fire Alarm upgrade. (NO LABOR) (C14)10/6/201410/13/201411/28/201460D-15253-P
Jessie W. Harris BuildingReplace Flat Roofs. (Crisis) (XYZ) (CC) replaces M-12099.1/16/20140D-14297
Jessie W. Harris BuildingJessie Harris Fire Alarm upgrade. (NO LABOR) (C14)10/6/201410/13/201411/28/201460D-15253
Jessie W. Harris BuildingRenovation of 202, 202C space in Jessie Harris Building. See attached Drawing (not to scale) Preferred completion deadline August 1, 2014. D-151397/7/20149/15/201412/19/201490D-15139
John C Hodges LibraryRenovations to Galleria at John C Hodges Library.10/10/20140D-15263
John C Hodges LibraryJohn C Hodges Library South Commons, installation of a two-piece iPad Kiosk and Career Services display (see attachment). Manufacturing of display will take roughly 8 weeks. Hoping for installation in late Dec./early Jan.10/14/20140D-15269
John C Hodges LibraryPatch & paint walls in 299B WLS. ***SEE MAP*** (C14)9/16/201412/15/20141/9/20150D-15238
John C Hodges LibraryJohn C Hodges Library room 207 install two electrical outlets.11/14/201412/1/201412/3/20140D-15291
Kingston Pike BuildingBlanket: Routine Maintenance (FY 2012-2013)7/1/20127/1/20126/30/20130D-13009
Kingston Pike BuildingFurnish and install eleven (11) ceiling mounted radiant heater (similar to Qmark) in room 127 Kingston Pike Building. (C14)10/14/201412/8/20141/9/20155D-15267
Laurel Residence HallSimplex Fire Alarm Testing - Complete test with 50% of the devices cleaned and 50% of the devices tested. Please provide a complete report upon completion. (C14)11/26/201412/15/20141/9/20151D-15306
Law Complex: George C Taylor WingPaint over logo at bottom of directory boxes on eash floor of building with matching blue paint at the Low Complex: George C Taylor Wing. (BC)8/22/20140D-15220
Law Complex: George C Taylor WingLaw Complex: George C Talor Wing - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (C14)11/2/201210/14/20141/30/201550D-13281
Law Complex: Law Library and Classroom AdditionLaw Complex: Law Library & Classroom Addition - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/201210/20/20141/30/201510D-13282
Lindsey Nelson StadiumLindsey Nelson Stadium - Repair/Replace/Recover the Built-up roof and metal roof due to Storm Damage of April 2011 (XYZ) (S14)11/2/201211/24/20141/30/201510D-13283
Massey HallSimplex Fire Alarm Testing - Complete test with 50% of the devices cleaned and 50% of the devices tested. Please provide a complete report upon completion. (C14)11/26/201412/15/20141/9/20151D-15305
McClung Tower and PlazaMcClung Tower - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (FP)11/2/20121D-13286
McCord HallReplace roof at McCord Hall. (Ins) (Cap/Repl) (Replace east tile, review west tile) (XYZ)5/1/20121D-12453
McCord HallRepair/Replace/Recover flat roof at McCord Hall roof due to Storm Damage of April 2011 (XYZ)10/23/20140D-15280
Middlebrook BuildingBlanket: Perform Miscellaneous work as needed (FY 2012-2013)7/1/20127/1/20126/30/20130D-13006
Min H. Kao Electrical Engineering & Computer ScienceMin Kao - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13289
Min H. Kao Electrical Engineering & Computer ScienceInstall new Mott Optima 2500 series laboratory bench systems in room 336 & 337 Min H Kao Building. See Attachments for details. (C14)11/17/201412/8/20141/9/20155D-15294
Morgan Hallinstall cooling/heating device in room 203 Morgan Hall, repaint room, provide & install appropriate cover for an IDF board (picture attached). This replaces the work request dated 2/7/14 for the same room.4/21/201410/22/201412/31/201460D-14414
Morgan HallRefer to the Attachments. 1. Morgan Hall Plan 2. Sheet MH-CWI-Dated 5/28/14. (C14)9/3/20149/25/201412/31/201420D-15225
Morgan HallIn Rooms 205A & 205E: Paint walls and fill in holes in walls from hanging pictures.12/1/20140D-15311
Morgan HallReplace roof on Morgan Hall. (Ins) (Cap/Repl) (Review tile) (XYZ)5/1/20128/4/201411/28/20141D-12454
Morgan HallMorgan Hall tile Roof Repair. Remove necessary tile and repai damaged sheathing and rafters (XYZ) (Crisis) (C14)6/5/20149/2/20141/30/201560D-14464
Morrill HallSimplex Fire Alarm Testing - Complete test with 50% of the devices cleaned and 50% of the devices tested. Please provide a complete report upon completion (C14)11/26/201412/15/20141/9/20151D-15299
Natalie L. Haslam Music CenterReplace existing solid wood door on G17 Natalie Haslam Music Center with a door with a window such as used in the practice rooms on that hallway (Room#G28 is an esample).10/14/20140D-15270
Neyland Drive Biology AnnexReplace metal roof damaged in hail storm on 4/27/11 at Neyland Drive Biology Annex. (Ins) (XYZ)7/29/20141D-15183
Neyland-Thompson Sports CenterUpgrade exterior security for doors at Neyland-Thompson Sports Center.7/18/20140D-15169
Neyland-Thompson Sports CenterNeyland-Thompson Sports Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13291
Nielsen Physics BuildingIn Room 203: Install projector mounts and projector screens and supply any needed electrical service and conduit for internet service that is needed by OIT and Mike Berger to complete installation.11/19/20140D-15297
Nielsen Physics BuildingNielsen Physics Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/201210/27/201412/31/20141D-13292
OFF CAMPUSBuild/Furnish a guard to protect the exterior vacuum equipment outside of 525 N. Gay Street as this is exposed to vehicles in the parking lot.12/18/20140D-15321
Outdoor Tennis Center BuildingOutdoor Tennis Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13293
Panhellenic BuildingRemove old carpet and install new carpet in Room 206 of Panhellenic. Confirm carpet selection: Biglow Desert Oasis 7843. Include transition strips at doors. No new baseboard required.11/26/201412/15/20141/9/20150D-15313
Panhellenic BuildingRemove old carpet install new carpet in Room 202 of Panhellenic. Confirm carpet selection: Biglow Desert Oasis 7843. Include transition strips at doors. No new base board required11/26/201412/15/20141/9/20150D-15312
Panhellenic BuildingInstall new concrete sidewalk to attach to Law College and install Modular ramp to sidewalk on Strong Hall side. (ADA) (No Labor) (FP) (C14)9/23/201412/15/20143/31/20151D-15246
Perkins HallReplace roof at Perkins Hall. (Ins) (Cap/Rpl) (Ck Tile) (XYZ)5/1/20121/5/20153/27/201510D-12456
Perkins HallTake out old cubicles, patch floor, paint walls and install electric reels in room 51 Perkins Hall. Contact Dr. Toby Boulet at est. 974-8376, for any questions about details of work projects.10/29/201411/10/201412/31/201475D-15286
Perkins HallInstall new air conditioner unit in suite 219 Perkins hall.8/19/20140D-15210
Perkins HallMove the projector screen from Perkins 319 to Perkins 219. Also need a power connection placed in the center of the ceiling of Perkins 219 for a projector that will be mounted there. We would like to complete this project in the first two weeks of Jan.12/18/20140D-15323
Plant Biotechnology BuildingReplace window awnings damaged in hail storm on 4/27/11 at Plant Biotech. (XYZ)7/2/20121D-13012
Pratt PavilionReplace metal roof damaged in hail storm on 4/27/11 at Pratt Pavilion. (Ins) (XYZ)7/29/20141D-15184
Pratt PavilionCONTINUATION OF D-13013 Repair or replace window flashing & Lightening rods damaged in storms of 4/25/11 & 4/27/11 at Pratt Pavilion.7/1/20149/11/20129/29/20141D-15059
Pratt PavilionReplace flat roof section of Pratt Pavilion. (XYZ)7/29/20140D-15186
Publications and Services BuildingReplace metal roof damaged in hail storm on 4/27/11 at Publications & Services. (Ins) (XYZ)7/2/20121D-13028
Radiological Safety - Old Cherokee TrailRadiological Safety: Clean-up and response for Storm Damage, 4/25/11. (S12) (J010001760) (XYZ)10/15/20140D-15271
Radiological Safety - Old Cherokee TrailInstall safety shower & eye wash station in 101 Radiological Safety. I would like to have the water supply plumbed from the Bass Anthropology Building fixture. This idea was proposed in estimate T-10711. Does not need to be connected to sanitary sewer. Install a shower drain pan to collect any water. The fixtures need to be freeze resistant if possible since the building has no heat. Need an instant water heated connected to the system to meet the OSHA tepid water requirements.5/16/20140D-14434
Radiological Safety - Old Cherokee TrailRadiological Safety - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/201210/20/201412/31/201410D-13297
Reese HallSimplex Fire Alarm Testing - Complete test with 50% of the devices cleaned and 50% of the devices tested. Please provide a complete report upon completion. (C14)11/26/201412/15/20141/9/20151D-15302
Science and Engineering BuildingSERF 328: add outlets and remove some high voltage lines. Need installations for an ultrapure water system. (C14)10/14/201411/10/20141/30/201550D-15268
Science and Engineering BuildingSERF 522: Glove box nees to be attached to the ceiling exhaust system.6/16/20145/1/201411/21/201490D-14470
Science and Engineering BuildingRenovations to room 603 SERF for Dr. Colleen Jonsson. (SERFHOODS) (CC) (C14)9/9/201410/14/201411/14/20145D-15231
Science and Engineering BuildingFilter the room exhaust of 522 SERF. Dan Smith will have more information on how we plan on accomplishing this.10/21/20141/7/20151/30/20150D-15274
Science and Engineering BuildingContinuation of D-13300: Replace/Repair built up roof from storm damage (XYZ) (Ins) (C14)6/25/201410/6/20141/30/201540D-15086
Science and Engineering BuildingIn room 531: The connection between the fume hoods is made at the connection. We no longer want them to be connected but a separate pipe added to the waste container. Please see the attached picture.11/26/20140D-15309
Sigma Phi Epsilon Fraternity HouseSigma Phi Epsilon Fraternity House install a drain & water pipe/line in dinning room 214 for a drink machine.9/8/20140D-15229
South & East StadiumReplace siding & window flashing damaged in hail storm on 4/27/11 at Neyland Stadium West Skybox/Club. (XYZ)9/11/20120D-13027
South & East Stadium2014 Football Season - Gameday coverage and cleanup. Also includes pre-season start-up.3/26/201410D-14369
South CollegeInstall ADA opener on doors at top of HC ramp at South College. (C14)7/25/20149/15/201412/19/201490D-15181
South CollegeRemove temporary cubical paneled wall & door in 310A South College, and replace with permanent framed, studded wall with drywall to make space into a new faculty office.10/6/20140D-15257
Southeast Precast WarehouseCONTINUATION OF D-13567: Site preparation for new Facilities Services Complex at 2000 Sutherland Avenue. (C14)7/1/20141D-15111
Stokely Management CenterStokely Management Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/201210/27/20141/30/20151D-13304
Stokely Management CenterBuild & install white boards on a wall in 505 A/B/C SMC for Econ Dept., measuring 4`x14`, or tow 4`x7` boards. Please frame with wood trim. Size may be adjusted as needed.10/27/20140D-15283
Stokely Management CenterRenovate 7th floor SMC. See attached work list and drawings. (C14)2/11/201410/10/201412/19/201480D-14321
Student Services BuildingDesign Fee for Architectural Drawings11/17/20140D-15293
Student Services BuildingStudent Services Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13308
Temple HallInstall campus standard gate with hasp to retard access to air handler on ground at Temple Hall.8/15/201411/3/201412/31/201460D-15207
Thompson-Boling Assembly Center and ArenaBlanket: HVAC Water Treatment (FY 2012-2013)7/1/20127/1/20126/30/20130D-13007
Thompson-Boling Assembly Center and ArenaAssist Longent with the installation of DAS at Thompson Boling Arena. This will include mainly high voltage and fire alarm work. Cost not to exceed $5,000 per Bryan Lord. See Pinnacle work order # 92324. (C14)7/15/20147/1/20141/30/201590D-15159
Thompson-Boling Assembly Center and ArenaBlanket: Miscellaneous work as needed (FY 2012-2013)7/1/20127/1/20126/30/201390D-13003
University Commons Vol ShopUniversity Commons, need alarm system set up, panic button, motion detectors, pin pad/sensors on doors. (C14)9/3/201410/27/201412/31/201495D-15227
UT Welcome CenterRenovation of the Bakery area. Remove existing equipment, fix electrical and plumbing. Install new equipment and tables when purchased.12/15/20140D-15319
Veterinary Teaching HospitalInstall one quad power outlet where new projector was installed. (Room A113)11/19/201412/1/201412/2/20140D-15296
Veterinary Teaching HospitalVeterinary Teaching Hospital - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (C14)11/2/201210/20/20143/31/201550D-13311
Volunteer HallBuilding Systems Technology Fire Alarm Testing - Complete test with 50% of the devices cleaned and 50% of the devices tested. Please provide a complete report upon completion. (C14)11/26/201412/15/20141/9/20151D-15307
Walters Life Sciences BuildingWalters Life Sciences Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13313
Walters Life Sciences BuildingMake improvements to humidification systems for the animal facility at WLS.7/17/20140D-15163



 