Current Summer Projects (2014):

 

BUILDINGDESCRIPTIONDATE APPROVEDSCHED TO BEGINSCHED TO COMPLETE% COMPLETEPROJECT NUMBER
Biosystems Engineering and Soil Science Labs BuildingReplace roofs damaged in hailstorm on 4/27/11 at BEES Office Building. (BU and tile) (Ins) (Cap/Repl BU) (XYZ) (C13) (S14)7/2/1285D-13016
BoathouseReplace storm damaged metal roof on the Boathouse. (XYZ) (S14)10/18/139/1/1410/10/1495D-14197
Communications and University Extension BuildingPlaza roof replacement at Communictions/Student Services (XYZ) (Crisis) (C13) (S14)11/20/1310/20/142/27/151D-14224
Dougherty Engineering BuildingDougherty Engineering - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (S14) NEW PROJECT 7/1/14 D-1506511/2/1210/27/142/27/151D-13262
ETREC Johnson Animal Research BuildingMetal roof replacement at ETREC Johnson Animal Research Building. (XYZ) (S14)5/22/1410/20/143/31/155D-14440
Lindsey Nelson StadiumLindsey Nelson Stadium - Repair/Replace/Recover the Built-up roof and metal roof due to Storm Damage of April 2011 (XYZ) (S14)11/2/124/15/148/30/1410D-13283



Current Open Projects (ALL):

BUILDINGDESCRIPTIONDATE APPROVEDSCHED TO BEGINSCHED TO COMPLETE% COMPLETEPROJECT NUMBER
Alumni Memorial BuildingCorrections to stage curtain headblock at Alumni Memorial Building.8/19/140D-15211
Anderson Training CenterSet up Elevator # 1 at Anderson Training Center so that to operate it will require a SmartCard/VolCard. Contact Scott Zurcher @ 617-731810/10/140D-15264
Andy Holt TowerAndy Holt Tower - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (FP)11/2/121D-13242
Art and Architecture BuildingNew electrical panel I drop down Receptacles from track, outlet connectors- rooms 307, 313, 317 @ A & A. Need ASAP6/24/147/14/1410/24/1490D-15084
Art and Architecture BuildingDownTown Studio: install security upgrades including card enty & possible camera @ 502 South Gay Street, Knoxville, Tn.7/7/140D-15138
Art and Architecture BuildingCONTINUATION OF D-13630 -- Install Cameras in wood shop for safety & security at A & A.7/1/141/13/149/26/1475D-15021
Art and Architecture BuildingCONTINUATION OF D-13039--Replacement or possible upgrade for our current swipe card system at 2nd floor bridge stairs, stairs at 1st level atruim; loading dock area. Installing a new swipe card system in the main administratice offce room 224. please cor7/1/1412/2/1310/31/1485D-15006
Art and Architecture BuildingCONTINUATION OF D-14412--Studio electrical renovations all 3rd and 4th floor studios College of Architecture and Design.7/1/144/17/1410/30/1485D-15002
Art and Architecture BuildingArt & Architecture Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (FP)11/2/121D-13243
Austin Peay BuildingMake improvements for ADA route At Austin Peay through building in conjunction with landscaping project. (No Labor) (ADA) MUST BE DONE BEFORE SCHOOL STARTS!! D-144295/8/147/14/148/20/1470D-14429
Ayres HallAyres Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/1212/15/143/7/151D-13246
Biosystems Engineering and Soil Science Labs BuildingReplace roofs damaged in hailstorm on 4/27/11 at BEES Office Building. (BU and tile) (Ins) (Cap/Repl BU) (XYZ) (C13) (S14)7/2/1285D-13016
Black Cultural CenterReplace fan shrouds, or replace fans damaged in hailstorm on 4/27/11 at Black Cultural Center.7/31/120D-13017
Blount HallBlount Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/129/29/1412/31/1410D-13249
Blount HallMagnetic door hold open devices connected to fire alarm for various doors in Blount Hall. See Carolyn. Estimate requested by 4/25/14. Please contact Carolyn Underwood In Facilities Services for additional instructions. The doors are located in the lobby area of the 1st floor (two doors on east side & 2 doors on west side of lobby), double doors on ground floor of Blount Hall entering into suite area A008, and double doors on 4th floor of Blount Hall leading into hallway area 499B.5/28/149/29/1410/17/1450D-14452
BoathouseBlanket: Maintenance as needed (FY 2012-2013)7/1/127/1/126/30/130D-13008
BoathouseReplace storm damaged metal roof on the Boathouse. (XYZ) (S14)10/18/139/1/1410/10/1495D-14197
Brenda Lawson Athletic CenterBrenda Lawson Athletic Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/121D-13250
Brenda Lawson Athletic CenterInstall door security at entrances of Brenda Lawson Center.7/18/140D-15170
CAMPUSBlanket - general maintenance in classrooms to include replacing markers, erasers, seating repairs, painting, etc. (FY15)8/6/140D-15199
CAMPUSLimited Campus Concrete Sidewalk Repairs (BC)9/15/149/16/1412/31/140D-15237
CAMPUSCONTINUATION OF D-13565 -- Installation of electric, water and condensate metering in academic, reaseardh & administration buildings. (Chancellor-NR11) (CC) (S13)7/1/147/1/136/30/145D-15017
CAMPUSCONTINUATION OF D-13395 -- Green Project - Reinsulate Steam Lines (2014-2015) (year 3 of 5)7/1/149/2/148/24/140D-15013
CAMPUSBlanket - general maintenance in classrooms to include replacing markers, erasers, seating repairs, painting, etc. (FY13)1/29/1350D-13410
CAMPUSRepairs to roofs due to Storm Damage of April 2011. (XYZ) (Ins)3/21/140D-14365
CAMPUSBlanket: Campus Beautification (FY 2012-2013)7/1/127/1/126/30/130D-13005
CAMPUSCONTINUATION OF D-13626 GREEN PROJECT - MOG Education, Publicity & Support - Year 10 (2014-2015)7/1/145/19/145/23/140D-15057
CAMPUSCONTINUATION OF D-14176: Housing Master Plan for Presidential Court Complex.7/1/1430D-15118
CAMPUSProjects for Bid on Metal roof damage storm of 2011 to include Project D-D-13028 Publications & Services, D-13031 Tom Black Track, D-15183 Neyland Biology Annex, D-15183 Pratt Pavilion.7/29/141D-15185
CAMPUSBlanket - Annual maintenance for water bottle filling fountains only. (FY1013 and FY 2014)1/11/130D-13392
CAMPUSBlanket: Disabilities Accommodations (FY 2012-2013)7/1/127/1/126/30/1310D-13002
CAMPUSFacilities Services support for the Hill Master Plan9/16/140D-15239
CAMPUSCONTINUATION OF D-13621 -- Green Project - Exterior Lighting Upgrades - Building Mounted.7/1/1411/4/1312/31/1410D-15019
CAMPUSBlanket: Misc. Conduit, raceways & other wiring for Network Services -Tech Fee (FY 2012-2013)7/1/127/1/126/30/130D-13004
CAMPUSDamages from storm on July 27-28, 2014.8/4/147/28/1490D-15198
CAMPUSCONTINUATION OF PROJECT D-14202: Project for Bid on Metal roof damage storm of 2011 to include Project D-13209 Regal Soccer, D-13030 Sherri Lee Parker Stadium, D-14197 Boathouse, D-14196 ELC-2010 Lake Avenue, D-13283 Lindsey Nelson.6/30/147/14/1410/31/1495D-15097
CAMPUSCONTINUATION OF D-14054 -- Campus Building Security Upgrade7/1/147/22/1312/31/145D-15022
CAMPUSCONTINUATION OF D-13593 -- Replace transformers @ Perkins Hall, Andy Holt Tower, Communications, Humanities & McClung Tower. (CHANCELLOR-NR11) (CC) (S13)7/1/141D-15018
CAMPUSGreen Project - Install flash tanks to trap high pressure traps to low side of building systems, allowing venting to low side steam system, and trappping then to condensate receivers. D-133931/11/1311/18/136/30/150D-13393
CAMPUS-Green ProjectCONTINUATION OF D-13394 Green Project- Install water bottle filling stations. (2014-2015)7/1/149/30/136/30/141D-15074
CAMPUS-Green ProjectCONTINUATION OF D-13396 Green Project - Low flow plumbing fixtures. (2014-2015) (year 3 of 5)7/1/140D-15075
CHEROKEE FARMSReplace fence at Cherokee Farms with our Campus Standard around the Generator.8/4/141D-15197
CHEROKEE FARMSProvide alarm monitoring in the Vault at Cherokee Farms. Monitoring should include water, access & temperature.9/9/140D-15232
Clarence Brown TheatreUpgrade stage lift controls at Clarence Brown Theatre. (C14)10/7/1312/22/141/11/151D-14185
Clarence Brown TheatreRun surface mounted conduit and mount a junction box above two portraits in the Lobby of the CBT (one each on the south and north walls). This conduit will be used to power two LED lights, and will need to placed on the same circuit as the rest of the lobby lights. The department will provide the following fixture to install (also located as an attachment). http://www.atgstores.com/picture-lights/wac-lighting-pl-led-ledmereg-hardwire-led-picture-light_g1518535.html?linkloc=collectionItems10/7/140D-15259
Clarence Brown TheatreReplace 3 circuit breakers that service our sound system that have been prematurely tripping in s101 Clarence Brown Theatre.9/2/1410/13/1411/14/145D-15224
Clarence Brown Theatrecontinuation of D-13459 : Provide fire protection system for stage area and proscenium including fire separation curtain and re-initiation of deluge system at Clarence Brown Theatre. (CC)7/1/142/20/1312/31/140D-15148
College of NursingCollege of Nursing - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (FP)11/2/121D-13257
Communications and University Extension BuildingCommunications - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (FP)11/2/121D-13258
Communications and University Extension BuildingRemove door that enters from hallway on NW side to room 440 Communications as shown in 4th floor plan layout 1133 sheet 4 of 5 dtd 5/18/12. Opening to be sealed/drywall and painted.8/28/140D-15222
Communications and University Extension BuildingContinuation of D-12366 -- Build enclosed space(s) on third floor patio area at Communications.4/17/140D-14410
Communications and University Extension BuildingPlaza roof replacement at Communictions/Student Services (XYZ) (Crisis) (C13) (S14)11/20/1310/20/142/27/151D-14224
Communications and University Extension BuildingRemove existing solid wood doors to Rooms 447 & 441 shown on 4th floor plan 1133, dtd 5/18/12. Doors are left & right of observer facing No exiting elevators on 4th floor lobby Communications. Replace with new doors with glass pane to rooms 447 & 441.8/28/140D-15223
Communications and University Extension BuildingInstall acoustical ceiling to reduce noise in the CCI 3rd floor lobby Communications.7/11/1410/13/1411/14/140D-15157
Communications and University Extension BuildingAdd additional insulation to the three small practice rooms in the newly renovated Public Communication Center as speech is still audible. *Has spoken to Jeff Barnes about options to resolve problem.10/8/140D-15262
Conference Center BuildingInstall new carpet per estimate T-11129 in 212 CCB. Furniture Vendor will be handling removal & installation of furniture.5/15/1411/2/1411/21/140D-14430
Conference Center BuildingCCB the old UT Bookstore, install window treatment, possible curtain with drawstring to cover the entire fron window/doors from the street view. Would like to meet with someone to discuss options.10/13/140D-15266
Conference Center BuildingBlanket: Miscellaneous work as needed (FY 2012-2013)7/1/127/1/126/30/1310D-13001
CRC - Material Science and Technology UnitRemove Carver hydraulic press to Surplus Property from Center for Renewable Carbon. (BC)10/8/140D-15261
Dabney-Buehler HallFume hood changes, 2nd floor of Buehler Hall: All of the work included in this PP28 relates to changes being made in research labs, in order to provide laboratory space for a new faculty member who starts 8/1/13. 1. Remove old existing 3-ft hood in Room 204C. Replace that hood with a similarly-sized ventilated cabinet. 2. Install a new 6-ft fume hood in Room 214A, which will tie in to the same 8-in fume hood trunk line as the cabinet in 204C. 3. Remove old existing 6-ft fume hood in Room 211. 4. Move newer existing 8-ft fume hood from Room 210 to replace the old hood in Room 211. (C13) D-14149 NEW PROJECT 7/1/14 D-150519/12/138/4/1410/17/1490D-14149
Dabney-Buehler HallFume hood changes, 2nd floor of Buehler Hall: All of the work included in this PP28 relates to changes being made in research labs, in order to provide laboratory space for a new faculty member who starts 8/1/13. 1. Remove old existing 3-ft hood in Room 204C. Replace that hood with a similarly-sized ventilated cabinet. 2. Install a new 6-ft fume hood in Room 214A, which will tie in to the same 8-in fume hood trunk line as the cabinet in 204C. 3. Remove old existing 6-ft fume hood in Room 211. 4. Move newer existing 8-ft fume hood from Room 210 to replace the old hood in Room 211. (C13)9/12/138/18/1410/17/1490D-14150
Dabney-Buehler HallAdd automatic openers at 4th floor entrance to Buehler. (ADA) (No Labor)4/17/1410/15/1412/10/1425D-14411
Dougherty Engineering BuildingRenovation of Dougherty Engineering 103. Please see attached for more details.10/16/140D-15272
Dougherty Engineering BuildingMABE room 110 will be converted to Welding Lab. Clean & prep floor for new equipment. Add electrical & other service connections for new welding equip. Add fume Hood. Add localized vent system for various welding stations.4/4/149/29/1412/31/140D-14398
Dougherty Engineering BuildingDougherty Engineering - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (S14) NEW PROJECT 7/1/14 D-1506511/2/1210/27/142/27/151D-13262
Dougherty Engineering BuildingMABE Machine Shop, Room 102 Reconfigure (relocating various Machine tools), clean up, paint & forklift truck access to DO hallways & elevator. Add fume hood. Add electrical & other service connections for equipment in Prototyping Lab, rm. 110 and as necessary for equip to be reconfigured in room 102. see attached for more details4/4/149/9/1412/31/1440D-14399
Early Learning Centerin room 105 (middle room/gym) located in the Lake Ave ELC, we would like the flooring, including the carpet & tile at the entry way, removed and replace with tile.4/4/140D-14400
Early Learning Center - Research & PracticeReplace built-up roof, windows, and masonry repairs at ELC-1206 White Avenue. (XYZ)5/1/121D-12460
Earth and Planetary Sciences BuildingCONTINUATION OF D-14287 Replace roof & air handler serving classroom 302 EPS. (Crisis) (CC) (replaces M12100)7/1/145/19/1410/31/1490D-15073
ETREC Johnson Animal Research BuildingMetal roof replacement at ETREC Johnson Animal Research Building. (XYZ) (S14)5/22/1410/20/143/31/155D-14440
Facilities Services and Operations BuildingCONTINUATION OF D-14268 Archibus Phase I, II, & III.7/1/142/5/136/30/1550D-15053
Ferris HallFerris Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/1210/27/142/27/151D-13265
Food Science and Technology BuildingFood Science & Tech room 217 need a 15A, 3 phase 208V breaker installed in electric panel and outlet (provided) installed on East wall.10/20/140D-15273
Frank H. McClung Museum of Natural History and CultureClean Monty the Dinosaur at McClung Museum8/15/140D-15206
Fraternity ParkCONTINUATION OF D-13155-- Fraternity Park - Improve landscaping to bring Park up to Landscape master plan standards. (BC)7/1/148/29/1490D-15009
Fraternity ParkCONTINUATION OF D-13148-- Fraternity Park- Install security cameras for exterior coverage.7/1/147/10/1310/17/1495D-15008
Fulton BottomCONTINUATION OF D-12272--Install Lighting for Rugby Field at Fulton Bottoms.7/1/146/17/1310/10/1495D-15005
Glazer BuildingInstall a projector and ceiling on ceiling in 116 Glazer Building. Add wiring for projector and sound.9/22/1410/27/1411/21/140D-15243
Goodfriend Tennis CenterReplace storm damaged metal roof on GoodFriend Tennis Center. (XYZ)10/18/131D-14195
Goodfriend Tennis CenterPlease run 2-20 amp circuits to room 114A Goodfriend Tennis Center. Circuits need to be installed into a 4" square box in the Hoffman cabinet mounted on the wall in the room. Pleas have the electrician contact Thomas Moats (310-8313/cell) before beginning the work.10/6/1410/6/1410/17/1450D-15254
Greve HallRemoval of closets and built-in dressers in labs 223, 224, 238, 239 and move whiteboards.7/1/140D-15105
Greve HallInstall power for projectors in rooms 318, 330 and 220.10/6/1410/13/1410/24/171D-15256
Greve HallGreve Hall hallway between rooms 218 & 219. Need plexiglass sign the same as photo attached, made & mounted on the wall. See project D-13140 from August 2012 for deminsions. Remove "The" and remove "Center" so that the sign reads Student Success (1st line), and your future, your success (2nd Line). (BC)8/20/140D-15212
Health, Physical Education, and Recreation BuildingCONTINUATION OF D-14301 -- HPER 135. 135C, 135D, 135E: refurbish to accommodate teaching & laboratory space. We`d like to divide the room into adjoining rooms.7/1/141/30/1410/24/1490D-15027
Hearing and Speech CenterHearing & Speech Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (FP)11/2/121D-13268
Hesler Biology Building and GreenhouseMake improvements to humidification systems for the snake rooms at Hesler Biology.7/17/140D-15166
Hesler Biology Building and GreenhouseContinuation of D-13269: Hesler Biology & Greenhouse - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (Ins)7/30/140D-15189
Hesler Biology Building and GreenhouseRoom 615, insulate ceiling and provide temperature control. (MOE)3/3/110D-11353
Holt Avenue Apartments Residence HallHolt Ave Res Hall: install 3 swings, (2 from Strong Hall Courtyard and 1 stored at Metron Warehouse) in the fron of the Residence Hall. Please see Lucinda Moore974-3606 for exact location and any questions. See Devery Cox 974-5246 to obtain swing.7/7/147/28/148/15/1480D-15132
Howard H. Baker Jr.Center for Public PolicyReplace dome and window flashing damaged in hailstorm of 4/27/11 at Baker Center. (XYZ)9/11/120D-13014
Howard H. Baker Jr.Center for Public PolicyReplace flat roof sections of Baker Center. (XYZ)8/22/121D-13122
James A. Haslam II Business BuildingCONTINUATION OF D-14364 Haslam B B 607: construct a floor to ceiling wall located as shown on attached plan & photo (1 & 2). Wall should be constructed in style/type shown on attached # 3. Doors should be centered on wall, of type shown in Attch # 3 & s7/1/145/19/1411/28/1480D-15033
James A. Haslam II Business Building"HASLAM COLLEGE OF BUSINESS" to be etched over the Volunteer Entrance and over the Side Entrance facing the pedestrian walkway.10/7/1410/16/1411/8/141D-15260
James A. Haslam II Business BuildingJames Haslam Business Building install a 110 volt outet in Einsteins behind the fountain machine for a dedicated ice machine.10/1/140D-15252
James A. Haslam II Business BuildingCONTINUATION OF D-13274 James A Haslam II Business Building Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)7/1/149/1/1410/31/1480D-15068
James D Hoskins LibraryCONTINUATION OF D-13275 Repai/replace/recover the built-up roof due to Storm Damage of April 2011 (XYZ)7/1/143/31/148/31/1420D-15069
Jane and David Bailey Education ComplexCONTINUATION OF D-13276 Jane & David Bailey Education Repair/replace/recover the Built-up roof due to Storm Damage of April 2011 (XYZ)7/1/144/15/148/30/1495D-15070
Jessie W. Harris BuildingJessie Harris Fire Alarm upgrade. (NO LABOR)10/6/1410/13/1411/28/140D-15253
Jessie W. Harris BuildingReplace Flat Roofs. (Crisis) (XYZ) (CC) replaces M-12099.1/16/140D-14297
Jessie W. Harris BuildingRenovation of 202, 202C space in Jessie Harris Building. See attached Drawing (not to scale) Preferred completion deadline August 1, 2014. D-151397/7/149/15/1410/31/1440D-15139
John C Hodges LibraryRenovations to Galleria at John C Hodges Library.10/10/140D-15263
John C Hodges LibraryPatch & paint walls in 299B WLS. ***SEE MAP*** (C14)9/16/140D-15238
John C Hodges Librarycontinuation of D-14468: John C Hodges: repairs done that were not storm damage.6/27/146/16/2411/21/1480D-15093
John C Hodges LibraryCONTINUATION OF D-14295 -- Purchase & install video surveillance cameras & software with correlation with UT Police Department & Facilities Services. Rick Caldwell is the project coordinator on 3,4,5,& 6 floor that is now getting the same cameras install7/1/146/16/1410/31/1495D-15026
John C Hodges LibraryJohn C Hodges Library South Commons, installation of a two-piece iPad Kiosk and Career Services display (see attachment). Manufacturing of display will take roughly 8 weeks. Hoping for installation in late Dec./early Jan.10/14/140D-15269
Kingston Pike BuildingBlanket: Routine Maintenance (FY 2012-2013)7/1/127/1/126/30/130D-13009
Kingston Pike BuildingFurnish and install eleven (11) ceiling mounted radiant heater (similar to Qmark) in room 127 Kingston Pike Building.10/14/140D-15267
Law Complex: George C Taylor WingLaw Complex: George C Talor Wing - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/1210/14/141/30/1510D-13281
Law Complex: George C Taylor WingPaint over logo at bottom of directory boxes on eash floor of building with matching blue paint at the Low Complex: George C Taylor Wing. (BC)8/22/140D-15220
Law Complex: Law Library and Classroom AdditionLaw Complex: Law Library & Classroom Addition - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/1210/20/141/30/1510D-13282
Lindsey Nelson StadiumLindsey Nelson Stadium - Repair/Replace/Recover the Built-up roof and metal roof due to Storm Damage of April 2011 (XYZ) (S14)11/2/124/15/148/30/1410D-13283
McClung Tower and PlazaMcClung Tower - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (FP)11/2/121D-13286
McCord HallReplace roof at McCord Hall. (Ins) (Cap/Repl) (Replace east tile, review west tile) (XYZ)5/1/121D-12453
Middlebrook BuildingBlanket: Perform Miscellaneous work as needed (FY 2012-2013)7/1/127/1/126/30/130D-13006
Min H. Kao Electrical Engineering & Computer ScienceMin Kao - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/121D-13289
Min H. Kao Electrical Engineering & Computer ScienceCONTINUATION OF D-14198 Install Ice Guards on Metal Roof of Min Kao (Crisis)7/1/1410/18/1410/31/141D-15052
Min H. Kao Electrical Engineering & Computer ScienceCONTINUATION OF D-13548 -- Add swipe locks to the following room doors with dual access control by CURENT & Police department. Hallway doors into Min Kao rooms 101, 117, 121A, 121B, 124 (2 doors), 125, 402, 411, 412, 530, 531, 532, 533, 554 & 555. Access7/1/143/10/149/12/1496D-15015
Morgan HallCONTINUATION OF D-14377 Morgan Hall 226 - Classroom Upgrade. Carpet, ceramic boards, paint & audio/visual.7/1/145/7/148/22/1490D-15043
Morgan HallReplace roof on Morgan Hall. (Ins) (Cap/Repl) (Review tile) (XYZ)5/1/128/4/1411/28/141D-12454
Morgan HallMorgan Hall tile Roof Repair. Remove necessary tile and repai damaged sheathing and rafters (XYZ) (Crisis)6/5/149/2/1411/7/1460D-14464
Morgan Hallinstall cooling/heating device in room 203 Morgan Hall, repaint room, provide & install appropriate cover for an IDF board (picture attached). This replaces the work request dated 2/7/14 for the same room.4/21/1410/22/1411/21/141D-14414
Morgan HallRefer to the Attachments. 1. Morgan Hall Plan 2. Sheet MH-CWI-Dated 5/28/149/3/149/25/1420D-15225
Natalie L. Haslam Music CenterReplace existing solid wood door on G17 Natalie Haslam Music Center with a door with a window such as used in the practice rooms on that hallway (Room#G28 is an esample).10/14/140D-15270
Natalie L. Haslam Music CenterProvide furniture for the Music Music Building. Please see attachments.9/23/140D-15245
Neyland Drive Biology AnnexReplace metal roof damaged in hail storm on 4/27/11 at Neyland Drive Biology Annex. (Ins) (XYZ)7/29/141D-15183
Neyland-Thompson Sports CenterNeyland-Thompson Sports Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/121D-13291
Neyland-Thompson Sports CenterUpgrade exterior security for doors at Neyland-Thompson Sports Center.7/18/140D-15169
Nielsen Physics BuildingNielsen Physics Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/1210/27/1412/31/141D-13292
Outdoor Tennis Center BuildingOutdoor Tennis Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/121D-13293
Panhellenic BuildingInstall new concrete sidewalk to attach to Law College and install Modular ramp to sidewalk on Strong Hall side.9/23/140D-15246
Perkins HallReplace roof at Perkins Hall. (Ins) (Cap/Rpl) (Ck Tile) (XYZ)5/1/129/29/1411/28/1410D-12456
Perkins HallInstall new air conditioner unit in suite 219 Perkins hall.8/19/140D-15210
Philander P. Claxton Education BuildingContinuation of M-12105: SFMO corrections at Philander P Claxton Education Building.1/3/140D-14278
Plant Biotechnology BuildingReplace window awnings damaged in hail storm on 4/27/11 at Plant Biotech. (XYZ)7/2/120D-13012
Pratt PavilionReplace flat roof section of Pratt Pavilion. (XYZ)7/29/140D-15186
Pratt PavilionCONTINUATION OF D-13013 Repair or replace window flashing & Lightening rods damaged in storms of 4/25/11 & 4/27/11 at Pratt Pavilion.7/1/149/11/129/29/141D-15059
Pratt PavilionReplace metal roof damaged in hail storm on 4/27/11 at Pratt Pavilion. (Ins) (XYZ)7/29/141D-15184
Presidential CourtProvide ventilation in CO2 tank room of Presidential Court.10/21/1310/7/1411/7/1480D-14200
Presidential CourtInstall a 110 volt outlet changed to a 220 volt in Chick-fil-A at Presidential Court for a new oven. Invoice to ARAMARK.10/1/140D-15251
Publications and Services BuildingReplace metal roof damaged in hail storm on 4/27/11 at Publications & Services. (Ins) (XYZ)7/2/121D-13028
Radiological Safety - Old Cherokee TrailInstall safety shower & eye wash station in 101 Radiological Safety. I would like to have the water supply plumbed from the Bass Anthropology Building fixture. This idea was proposed in estimate T-10711. Does not need to be connected to sanitary sewer. Install a shower drain pan to collect any water. The fixtures need to be freeze resistant if possible since the building has no heat. Need an instant water heated connected to the system to meet the OSHA tepid water requirements.5/16/140D-14434
Radiological Safety - Old Cherokee TrailRadiological Safety - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/1210/20/1412/31/1410D-13297
Radiological Safety - Old Cherokee TrailRadiological Safety: Clean-up and response for Storm Damage, 4/25/11. (S12) (J010001760) (XYZ)10/15/140D-15271
Science and Engineering BuildingRenovations to room 603 SERF for Dr. Colleen Jonsson. (SERFHOODS) (CC)9/9/1410/14/1411/14/145D-15231
Science and Engineering BuildingSERF 522: Picture one shows where the attachment needs to be made. Picture two shows where the vacuum is located. Picture three shows the vacuum, the filter can be removed or an attachment to go over it. I might be best to leave it so not to suck up pump oil. Please see attached pictures.9/3/140D-15226
Science and Engineering BuildingFilter the room exhaust of 522 SERF. Dan Smith will have more information on how we plan on accomplishing this.10/21/140D-15274
Science and Engineering BuildingSERF 522: Glove box nees to be attached to the ceiling exhaust system.6/16/145/1/1410/17/1490D-14470
Science and Engineering BuildingContinuation of D-13300: Replace/Repair built up roof from storm damage (XYZ) (Ins)6/25/1490D-15086
Science and Engineering BuildingSERF 328: add outlets and remove some high voltage lines. Need installations for an ultrapure water system.10/14/140D-15268
Science and Engineering BuildingInstall Card Swipe Access to SERF 338.9/12/1410/1/1410/24/1490D-15236
Sigma Phi Epsilon Fraternity HouseSigma Phi Epsilon Fraternity House install a drain & water pipe/line in dinning room 214 for a drink machine.9/8/140D-15229
South & East StadiumReplace siding & window flashing damaged in hail storm on 4/27/11 at Neyland Stadium West Skybox/Club. (XYZ)9/11/120D-13027
South & East StadiumBlanket: 2015 Football Season - work required to get the stadium ready prior to season start July 20147/9/1425D-15149
South & East Stadium2014 Football Season - Gameday coverage and cleanup.3/26/1410D-14369
South & East StadiumCONTINUATION OF D-14371 Assist Longent with the installation of the DAS at Neyland Stadium. This will include mainly high voltage and fire alarm work. Cost is not to excee $5000 per Bryan Lord. See Pinnacle workorder # 90408.7/1/147/1/1410/31/1490D-15037
South CollegeRemove temporary cubical paneled wall & door in 310A South College, and replace with permanent framed, studded wall with drywall to make space into a new faculty office.10/6/140D-15257
South CollegeInstall ADA opener on doors at top of HC ramp at South College.7/25/149/15/1410/31/1450D-15181
Southeast Precast WarehouseCONTINUATION OF D-13567: Site preparation for new Facilities Services Complex at 2000 Sutherland Avenue.7/1/141D-15111
Stokely Management CenterRenovate 7th floor SMC. See attached work list and drawings.2/11/147/1/147/1/1510D-14321
Stokely Management CenterReplace carpet on second floor of Stokely Management Center.5/1/140D-14423
Stokely Management CenterSMC 5th floor common areas: 1. Repair & repaint walls of common areas as shown on attached plan. Colors TBD by department. 2. Replace carpet in common areas with carpet tiles. Pattern to be chosen by department. Room numbers & door mounted name plates will be replaced with units matched to those used on the 3rd floor SMC. (Marketing Dept) 4. Outside of elevator door will be cleaned and repainted. Common Areas are 599, 599A, B, C, D; 527, 521 B, 505 A, B, C. Tiffany Shuler will assist the department with paint & carpet colors.12/9/131D-14256
Stokely Management CenterStokely Management Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/1210/27/141/30/151D-13304
Stokely Management CenterIn room 720: Install blocking for large screen display panel. Relocate outlet box. Provide duplex outlet at display panel. Add duplex outlets to external walls. Install box under table for data and power. Provide cables from floor box to wall. Provide internet connection to box. Reroute telephone line. Repair & repaint walls. See detailed list attached.10/13/140D-15265
Stokely Management CenterRenovation of Lounge Service Area in SMC 710. See attached for details.3/6/1410/13/1411/13/1415D-14343
Stokely Management CenterRenovations to 2nd floor break area at SMC. See attached.6/4/1410/13/1411/13/1410D-14461
Student Services BuildingStudent Services Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/121D-13308
Temple HallCONTINUATION OF D-14090: Facilities Services support for Phase II renovations (C13)7/1/147/1/1311/28/1496D-15114
Temple HallInstall campus standard gate with hasp to retard access to air handler on ground at Temple Hall.8/15/140D-15207
Thompson-Boling Assembly Center and ArenaBlanket: HVAC Water Treatment (FY 2012-2013)7/1/127/1/126/30/130D-13007
Thompson-Boling Assembly Center and ArenaBlanket: Miscellaneous work as needed (FY 2012-2013)7/1/127/1/126/30/1390D-13003
Thompson-Boling Assembly Center and ArenaAssist Longent with the installation of DAS at Tompson Boling Arena. This will include mainly high voltage and fire alarm work. Cost not to exceed $5,000 per Bryan Lord. See Pinnacle work order # 92324.7/15/147/1/1410/31/1480D-15159
Thompson-Boling Assembly Center and ArenaReplace old TV monitor & install 37" monitor (ceiling Mount) in front of command post. We have possession of 37" replacement monitor. Will need appropriate mount to secure to overhead structure.7/16/1410/13/1410/17/141D-15161
University Commons Vol ShopUniversity Commons, need alarm system set up, panic button, motion detectors, pin pad/sensors on doors.9/3/1410/27/1412/31/141D-15227
UT Welcome CenterCONTINUATION OF D-12459 Replace roof & windows. Waterproof Basement at the Welcome Center.7/1/145/19/147/21/1495D-15058
UT Welcome CenterNeed electrical work on in varoious spots throughout UT Welcome Center. Two new outlets added and 1 potentially slpit with mid-wall outlets created for IPOD docking stations. Would prefer a walk-through before work starts so we can arrange to have ther person who knows exctly wher placement is needed present to show.7/30/149/22/1410/31/1495D-15192
UT Welcome CenterCONTINUATION OF D-13620 : Additional improvements to the UT Welcome Center including exterior repairs and painting, cameras, awning, etc. (C13)6/24/1410/5/1311/14/1490D-15083
Veterinary Teaching HospitalVeterinary Teaching Hospital - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/1210/20/143/31/151D-13311
Walters Life Sciences BuildingMake improvements to humidification systems for the animal facility at WLS.7/17/140D-15163
Walters Life Sciences BuildingWalters Life Sciences Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/121D-13313



 