BUILDINGDESCRIPTIONDATE APPROVEDSCHED TO BEGINSCHED TO COMPLETE% COMPLETEPROJECT NUMBER
Alumni Memorial BuildingAMB room 27: New White Board (S14)3/31/20145/7/20148/25/201440D-14389
Biosystems Engineering and Soil Science Labs BuildingReplace roofs damaged in hailstorm on 4/27/11 at BEES Office Building. (BU and tile) (Ins) (Cap/Repl BU) (XYZ) (C13) (S14)7/2/201285D-13016
BoathouseReplace storm damaged metal roof on the Boathouse. (XYZ) (S14)10/18/201350D-14197
Communications and University Extension BuildingCONTINUATION OF D-14191: Renovations to room 260/261/262 Communications. See attachments! ***Eliminate accordian door, base cabinet, and accompanying design*** (S14)6/30/20143/17/20148/29/201495D-15095
Communications and University Extension BuildingPlaza roof replacement at Communictions/Student Services (XYZ) (Crisis) (C13) (S14)11/20/20131D-14224
Dougherty Engineering BuildingDougherty Engineering - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (S14) NEW PROJECT 7/1/14 D-1506511/2/20123/31/20148/31/20141D-13262
ETREC Johnson Animal Research BuildingMetal roof replacement at ETREC Johnson Animal Research Building. (XYZ) (S14)5/22/20145D-14440
Lindsey Nelson StadiumLindsey Nelson Stadium - Repair/Replace/Recover the Built-up roof and metal roof due to Storm Damage of April 2011 (XYZ) (S14)11/2/20124/15/20148/30/201410D-13283
Min H. Kao Electrical Engineering & Computer ScienceAdd cooling water for electrical experiments to be used by researchers in room 101, 117, 117A, 117B and 125 Min Kao. Each room shall have a minimum of 1 outlet and 1 inlet controlled via ball valves. Water temperature is not an issue by condensation on pipes should be minimized. The total load will be 50KW or less. Any attached research equipment may use fast acting water valves. Dan Smith has further info. (S14) D-136146/21/20137/14/20149/12/201490D-13614
Racheff ResearchNew sidewalk needed to connect parking surface outside Racheff GH to new entry. Sidewalk to slope from the edge of the parking lot & connect to the existing slab just outside of the new entrance. Old Entrance is now closed due to GH redesign. Additionally a large slab should be added just past the new entrance for various applications. See Attached Photo`s (2) for details. (S14) D-143362/28/20149/29/201410/13/201490D-14336



Current Open Projects (ALL):

BUILDINGDESCRIPTIONDATE APPROVEDSCHED TO BEGINSCHED TO COMPLETE% COMPLETEPROJECT NUMBER
1643 Cumberland Avenue - Commercial Bldgcontinuation of D-14118: Cumberland Renovations for Vol Shop and Dining facility at Cumberland and 17th.8/22/201490D-15219
2101 Terrace AvenueNeed 2 electrical wall outlets installed to accommodate copier & other office machines in 101 & 102 2101 Terrace Avenue. Several machines are currently operating off one outle with surge protectors & extension cords. (Reference attached inspection report the RadiationSafety Building performed by Health & Safety.)9/12/20140D-15235
Alumni Memorial BuildingAMB room 27: New White Board (S14)3/31/20145/7/20148/25/201440D-14389
Alumni Memorial BuildingCorrections to stage curtain headblock at Alumni Memorial Building.8/19/20140D-15211
Andy Holt TowerAndy Holt Tower - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13242
Art and Architecture BuildingArt & Architecture Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13243
Art and Architecture BuildingCONTINUATION OF D-13630 -- Install Cameras in wood shop for safety & security at A & A.7/1/20141/13/20149/26/201475D-15021
Art and Architecture BuildingCONTINUATION OF D-13628 -- Create kiosks area on each end of studio floor (3rd & 4th) would include area for small microwave, small fridge, 4 electrical outlets with counter top space, optional small sink area request estimate with and with out sink optio7/1/20144/23/20149/26/201495D-15020
Art and Architecture BuildingDownTown Studio: install security upgrades including card enty & possible camera @ 502 South Gay Street, Knoxville, Tn.7/7/20140D-15138
Art and Architecture BuildingNew electrical panel I drop down Receptacles from track, outlet connectors- rooms 307, 313, 317 @ A & A. Need ASAP6/24/20147/14/201410/24/201485D-15084
Art and Architecture BuildingCONTINUATION OF D-13039--Replacement or possible upgrade for our current swipe card system at 2nd floor bridge stairs, stairs at 1st level atruim; loading dock area. Installing a new swipe card system in the main administratice offce room 224. please cor7/1/201412/2/20139/26/201485D-15006
Art and Architecture BuildingCONTINUATION OF D-14412--Studio electrical renovations all 3rd and 4th floor studios College of Architecture and Design.7/1/20144/17/201410/30/201475D-15002
Austin Peay BuildingMake improvements for ADA route At Austin Peay through building in conjunction with landscaping project. (No Labor) (ADA) MUST BE DONE BEFORE SCHOOL STARTS!! D-144295/8/20147/14/20148/20/201470D-14429
Ayres HallAyres Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13246
Biosystems Engineering and Soil Science Labs BuildingReplace roofs damaged in hailstorm on 4/27/11 at BEES Office Building. (BU and tile) (Ins) (Cap/Repl BU) (XYZ) (C13) (S14)7/2/201285D-13016
Black Cultural CenterReplace fan shrouds, or replace fans damaged in hailstorm on 4/27/11 at Black Cultural Center.7/31/20120D-13017
Blount HallCONTINUATION OF D-13510-- Install glass wall with double doors on the ground floor of Blount Hall. The glass would partially separate A001 form A004. Please see Beth Neilson & Renee Thomas.7/1/20144/21/20148/29/201495D-15014
Blount HallBlount Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13249
Blount HallNeed estimate by 8/19/14 if possible. Replace existing carpet in A104 & A 105 Blount Hall with new carpet, carpet squares or tile flooring. Please give separate estimate for A105 and one for combining A104 & 105. This should include padding as well. Please see Renee Thomas in 118-C or Beth Neilson in 118-B when coming to perform the estimate.9/12/20140D-15234
BoathouseBlanket: Maintenance as needed (FY 2012-2013)7/1/20127/1/20126/30/20130D-13008
BoathouseReplace storm damaged metal roof on the Boathouse. (XYZ) (S14)10/18/201350D-14197
Brehm Animal Science BuildingPatch & repaint wall where tape has removed paint down to the drywall in room 299L Brehm Animal Science. This will entail spackling. Would it be possible to have the entire wall repainted with a semi-gloss (or some other type of scrubbable) finish in the same color?9/8/20140D-15228
Brenda Lawson Athletic CenterInstall door security at entrances of Brenda Lawson Center.7/18/20140D-15170
Brenda Lawson Athletic CenterBrenda Lawson Athletic Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13250
Brenda Lawson Athletic CenterInstall conduit for wireless access points in Brenda Lawson studio area and provide access to other rooms needed.8/22/20148/25/20149/12/201480D-15221
CAMPUSRepairs to roofs due to Storm Damage of April 2011. (XYZ) (Ins)3/21/20140D-14365
CAMPUSCONTINUATION OF D-13395 -- Green Project - Reinsulate Steam Lines (2014-2015) (year 3 of 5)7/1/20149/2/20148/24/20140D-15013
CAMPUSCONTINUATION OF D-13621 -- Green Project - Exterior Lighting Upgrades - Building Mounted.7/1/201411/4/201312/31/201410D-15019
CAMPUSProjects for Bid on Metal roof damage storm of 2011 to include Project D-D-13028 Publications & Services, D-13031 Tom Black Track, D-15183 Neyland Biology Annex, D-15183 Pratt Pavilion.7/29/20141D-15185
CAMPUSDamages from storm on July 27-28, 2014.8/4/20147/28/201490D-15198
CAMPUSCONTINUATION OF D-13626 GREEN PROJECT - MOG Education, Publicity & Support - Year 10 (2014-2015)7/1/20145/19/20145/23/20140D-15057
CAMPUSCONTINUATION OF PROJECT D-14202: Project for Bid on Metal roof damage storm of 2011 to include Project D-13209 Regal Soccer, D-13030 Sherri Lee Parker Stadium, D-14197 Boathouse, D-14196 ELC-2010 Lake Avenue, D-13283 Lindsey Nelson.6/30/201480D-15097
CAMPUSCONTINUATION OF D-14176: Housing Master Plan for Presidential Court Complex.7/1/201430D-15118
CAMPUSCONTINUATION OF D-13565 -- Installation of electric, water and condensate metering in academic, reaseardh & administration buildings. (Chancellor-NR11) (CC) (S13)7/1/20147/1/20136/30/20145D-15017
CAMPUSCONTINUATION OF D-14054 -- Campus Building Security Upgrade7/1/20147/22/201312/31/20145D-15022
CAMPUSBlanket - general maintenance in classrooms to include replacing markers, erasers, seating repairs, painting, etc. (FY13)1/29/201350D-13410
CAMPUSCONTINUATION OF D-13593 -- Replace transformers @ Perkins Hall, Andy Holt Tower, Communications, Humanities & McClung Tower. (CHANCELLOR-NR11) (CC) (S13)7/1/20141D-15018
CAMPUSBlanket - Annual maintenance for water bottle filling fountains only. (FY1013 and FY 2014)1/11/20130D-13392
CAMPUSBlanket - general maintenance in classrooms to include replacing markers, erasers, seating repairs, painting, etc. (FY15)8/6/20140D-15199
CAMPUSBlanket: Campus Beautification (FY 2012-2013)7/1/20127/1/20126/30/20130D-13005
CAMPUSBlanket: Misc. Conduit, raceways & other wiring for Network Services -Tech Fee (FY 2012-2013)7/1/20127/1/20126/30/20130D-13004
CAMPUSBlanket: Disabilities Accommodations (FY 2012-2013)7/1/20127/1/20126/30/201310D-13002
CAMPUSLimited Campus Concrete Sidewalk Repairs (BC)9/15/20149/16/201412/31/20140D-15237
CAMPUSGreen Project - Install flash tanks to trap high pressure traps to low side of building systems, allowing venting to low side steam system, and trappping then to condensate receivers. D-133931/11/201311/18/20136/30/20150D-13393
CAMPUS-Green ProjectCONTINUATION OF D-13394 Green Project- Install water bottle filling stations. (2014-2015)7/1/20149/30/20136/30/20141D-15074
CAMPUS-Green ProjectCONTINUATION OF D-13396 Green Project - Low flow plumbing fixtures. (2014-2015) (year 3 of 5)7/1/20140D-15075
Central GreenhouseInstall a 220V 20amp electric circuit in each of the two rooms ( Bay 2 & Bay 4 of Central Greenhouse).8/13/20148/25/20149/12/201480D-15202
CHEROKEE FARMSReplace fence at Cherokee Farms with our Campus Standard around the Generator.8/4/20140D-15197
CHEROKEE FARMSCONTINUATION OF D-14363 -- Eradicate fire ants at Cherokee Farms (BC)7/1/20143/21/201410/31/201460D-15032
CHEROKEE FARMSProvide alarm monitoring in the Vault at Cherokee Farms. Monitoring should include water, access & temperature.9/9/20140D-15232
Clarence Brown TheatreUpgrade stage lift controls at Clarence Brown Theatre.10/7/201312/22/20141/11/20151D-14185
Clarence Brown Theatrecontinuation of D-13459 : Provide fire protection system for stage area and proscenium including fire separation curtain and re-initiation of deluge system at Clarence Brown Theatre. (CC)7/1/20142/20/201312/31/20140D-15148
Clarence Brown TheatreReplace 3 circuit breakers that service our sound system that have been prematurely tripping in s101 Clarence Brown Theatre.9/2/20140D-15224
Clarence Brown TheatreReplace existing wall mounted A/C unit (similar to the work that was performed in the back stairwells on the CBT last Year) on the First floor D-101.9/10/20140D-15233
College of NursingCollege of Nursing - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13257
Communications and University Extension BuildingCONTINUATION OF D-13554 -- Redesign 4th floor lobby outside of the School of Information Sciences offices, Suite 451. Per designs by Keith Downen & team finalized 12/12/12.7/1/20143/10/20148/29/201496D-15016
Communications and University Extension BuildingContinuation of D-12366 -- Build enclosed space(s) on third floor patio area at Communications.4/17/20140D-14410
Communications and University Extension BuildingCommunications - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13258
Communications and University Extension BuildingCONTINUATION OF D-14191: Renovations to room 260/261/262 Communications. See attachments! ***Eliminate accordian door, base cabinet, and accompanying design*** (S14)6/30/20143/17/20148/29/201495D-15095
Communications and University Extension BuildingCONTINUATION OF D-14456: Radio Center-WUOT wishes to empty auxiliary broadcast site at Channel 10 preparatory to installing a new transmitter. Need Res Brooks & Tim Tomlinson to assess the sire for needed electrical work in shutting down existing equipment & setting up for replacement.6/30/20147/1/201410/31/201470D-15096
Communications and University Extension BuildingPlaza roof replacement at Communictions/Student Services (XYZ) (Crisis) (C13) (S14)11/20/20131D-14224
Communications and University Extension BuildingRemove existing solid wood doors to Rooms 447 & 441 shown on 4th floor plan 1133, dtd 5/18/12. Doors are left & right of observer facing No exiting elevators on 4th floor lobby Communications. Replace with new doors with glass pane to rooms 447 & 441.8/28/20140D-15223
Communications and University Extension BuildingRemove door that enters from hallway on NW side to room 440 Communications as shown in 4th floor plan layout 1133 sheet 4 of 5 dtd 5/18/12. Opening to be sealed/drywall and painted.8/28/20140D-15222
Communications and University Extension BuildingInstall acoustical ceiling to reduce noise in the CCI 3rd floor lobby Communications.7/11/20140D-15157
Conference Center BuildingBlanket: Miscellaneous work as needed (FY 2012-2013)7/1/20127/1/20126/30/201310D-13001
Conference Center BuildingInstall new carpet per estimate T-11129 in 212 CCB. Furniture Vendor will be handling removal & installation of furniture.5/15/201411/2/201411/21/20140D-14430
Dabney-Buehler HallFume hood changes, 2nd floor of Buehler Hall: All of the work included in this PP28 relates to changes being made in research labs, in order to provide laboratory space for a new faculty member who starts 8/1/13. 1. Remove old existing 3-ft hood in Room 204C. Replace that hood with a similarly-sized ventilated cabinet. 2. Install a new 6-ft fume hood in Room 214A, which will tie in to the same 8-in fume hood trunk line as the cabinet in 204C. 3. Remove old existing 6-ft fume hood in Room 211. 4. Move newer existing 8-ft fume hood from Room 210 to replace the old hood in Room 211. (C13) D-14149 NEW PROJECT 7/1/14 D-150519/12/20138/4/201410/3/201470D-14149
Dabney-Buehler HallFume hood changes, 2nd floor of Buehler Hall: All of the work included in this PP28 relates to changes being made in research labs, in order to provide laboratory space for a new faculty member who starts 8/1/13. 1. Remove old existing 3-ft hood in Room 204C. Replace that hood with a similarly-sized ventilated cabinet. 2. Install a new 6-ft fume hood in Room 214A, which will tie in to the same 8-in fume hood trunk line as the cabinet in 204C. 3. Remove old existing 6-ft fume hood in Room 211. 4. Move newer existing 8-ft fume hood from Room 210 to replace the old hood in Room 211. (C13)9/12/20138/18/201410/3/201450D-14150
Dabney-Buehler HallAdd automatic openers at 4th floor entrance to Buehler. (ADA) (No Labor)4/17/201410/15/201410/31/201425D-14411
Dougherty Engineering BuildingMABE Machine Shop, Room 102 Reconfigure (relocating various Machine tools), clean up, paint & forklift truck access to DO hallways & elevator. Add fume hood. Add electrical & other service connections for equipment in Prototyping Lab, rm. 110 and as necessary for equip to be reconfigured in room 102. see attached for more details4/4/20149/9/201412/31/20140D-14399
Dougherty Engineering BuildingDougherty Engineering - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (S14) NEW PROJECT 7/1/14 D-1506511/2/20123/31/20148/31/20141D-13262
Dougherty Engineering BuildingMABE room 110 will be converted to Welding Lab. Clean & prep floor for new equipment. Add electrical & other service connections for new welding equip. Add fume Hood. Add localized vent system for various welding stations.4/4/20149/29/201412/31/20140D-14398
Dougherty Engineering BuildingDougherty 323 B & C paint & carpet .7/7/20148/4/20148/29/201495D-15146
Early Learning Centerin room 105 (middle room/gym) located in the Lake Ave ELC, we would like the flooring, including the carpet & tile at the entry way, removed and replace with tile.4/4/20140D-14400
Early Learning Center - Research & PracticeOutside of Kindergarten class exit (basement Level) ELC, there is an asphalt patchwork ramp that is a tripping hazard. We request that a concrete section be poured where the asphalt section is currently, and that the concrete section beneath the existing storage shed be leveled. The asphalt patchwork is approx. 5`x5`, and the section beneath the shed is 4`x4`.8/21/20140D-15217
Early Learning Center - Research & PracticeReplace built-up roof, windows, and masonry repairs at ELC-1206 White Avenue. (XYZ)5/1/20121D-12460
Earth and Planetary Sciences BuildingCONTINUATION OF D-14287 Replace roof & air handler serving classroom 302 EPS. (Crisis) (CC) (replaces M12100)7/1/20145/19/20148/22/201490D-15073
ETREC Johnson Animal Research BuildingMetal roof replacement at ETREC Johnson Animal Research Building. (XYZ) (S14)5/22/20145D-14440
Facilities Services and Operations BuildingCONTINUATION OF D-14268 Archibus Phase I, II, & III.7/1/20142/5/20136/30/201550D-15053
Ferris HallFerris Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13265
Frank H. McClung Museum of Natural History and CultureClean Monty the Dinosaur at McClung Museum8/15/20140D-15206
Fraternity ParkCONTINUATION OF D-13148-- Fraternity Park- Install security cameras for exterior coverage.7/1/20147/10/20139/26/201495D-15008
Fraternity ParkCONTINUATION OF D-13155-- Fraternity Park - Improve landscaping to bring Park up to Landscape master plan standards. (BC)7/1/20148/29/201490D-15009
Fraternity ParkCONTINUATION OF D-13156-- Fraternity Park - Relocate & rework dumpster locations.7/1/20147/10/20139/26/201485D-15010
Fraternity ParkCONTINUATION OF D-13157 Fraternity Prak - Install entrance wall/signs similar to other Campus main entrances. (BC)7/1/20149/16/20138/29/201490D-15011
Fulton BottomCONTINUATION OF D-12272--Install Lighting for Rugby Field at Fulton Bottoms.7/1/20146/17/20139/26/201475D-15005
Golf Team FacilityCONTINUATION OF D-14361 -- Eradicate fire ants at the Golf Team Facility. (BC)7/1/20143/21/201410/31/201475D-15030
Goodfriend Tennis CenterReplace storm damaged metal roof on GoodFriend Tennis Center. (XYZ)10/18/20131D-14195
Greve HallGreve Hall 2nd floor: hallway doors across from south elevator . Need to make the one closest to 217 open the other way. Right now it opens towards room 217, need to have it open away from 217. Paint hallway area across from same elevator a contrasting color. Are there any limitations on paint color choices?5/6/20149/16/20149/26/201410D-14427
Greve HallRemoval of closets and built-in dressers in labs 223, 224, 238, 239 and move whiteboards.7/1/20140D-15105
Greve HallGreve Hall hallway between rooms 218 & 219. Need plexiglass sign the same as photo attached, made & mounted on the wall. See project D-13140 from August 2012 for deminsions. Remove "The" and remove "Center" so that the sign reads Student Success (1st line), and your future, your success (2nd Line).8/20/20140D-15212
Health, Physical Education, and Recreation BuildingCONTINUATION OF D-14301 -- HPER 135. 135C, 135D, 135E: refurbish to accommodate teaching & laboratory space. We`d like to divide the room into adjoining rooms.7/1/20141/30/201410/24/201480D-15027
Hearing and Speech CenterPaint rooms 11 & 13 and the hallway at Hearing & Speech Center.8/15/20140D-15205
Hearing and Speech CenterHearing & Speech Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13268
Hesler Biology Building and GreenhouseContinuation of D-13269: Hesler Biology & Greenhouse - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (Ins)7/30/20140D-15189
Hesler Biology Building and GreenhouseMake improvements to humidification systems for the snake rooms at Hesler Biology.7/17/20140D-15166
Hesler Biology Building and GreenhouseRoom 615, insulate ceiling and provide temperature control. (MOE)3/3/20110D-11353
Holt Avenue Apartments Residence HallHolt Ave Res Hall: install 3 swings, (2 from Strong Hall Courtyard and 1 stored at Metron Warehouse) in the fron of the Residence Hall. Please see Lucinda Moore974-3606 for exact location and any questions. See Devery Cox 974-5246 to obtain swing.7/7/20147/28/20148/15/201480D-15132
Howard H. Baker Jr.Center for Public PolicyReplace flat roof sections of Baker Center. (XYZ)8/22/20121D-13122
Howard H. Baker Jr.Center for Public PolicyReplace dome and window flashing damaged in hailstorm of 4/27/11 at Baker Center. (XYZ)9/11/20120D-13014
Humanities and Social Sciences BuildingCONTINUATION OF D-13231-- Replace steps and ADA ramp for lot 9 at South end of Humanities.7/1/201411/11/20138/22/201496D-15012
James A. Haslam II Business BuildingCONTINUATION OF D-14364 Haslam B B 607: construct a floor to ceiling wall located as shown on attached plan & photo (1 & 2). Wall should be constructed in style/type shown on attached # 3. Doors should be centered on wall, of type shown in Attch # 3 & s7/1/20145/19/20148/29/201440D-15033
James A. Haslam II Business BuildingCONTINUATION OF D-13274 James A Haslam II Business Building Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)7/1/20143/31/20147/31/201460D-15068
James D Hoskins LibraryCONTINUATION OF D-13275 Repai/replace/recover the built-up roof due to Storm Damage of April 2011 (XYZ)7/1/20143/31/20148/31/201420D-15069
Jane and David Bailey Education ComplexCONTINUATION OF D-13276 Jane & David Bailey Education Repair/replace/recover the Built-up roof due to Storm Damage of April 2011 (XYZ)7/1/20144/15/20148/30/201495D-15070
Jessie W. Harris BuildingRenovation of 202, 202C space in Jessie Harris Building. See attached Drawing (not to scale) Preferred completion deadline August 1, 2014. D-151397/7/20149/15/201410/3/201420D-15139
Jessie W. Harris BuildingReplace Flat Roofs. (Crisis) (XYZ) (CC) replaces M-12099.1/16/20140D-14297
John C Hodges LibraryCONTINUATION OF D-14295 -- Purchase & install video surveillance cameras & software with correlation with UT Police Department & Facilities Services. Rick Caldwell is the project coordinator on 3,4,5,& 6 floor that is now getting the same cameras install7/1/20146/16/20149/30/201495D-15026
John C Hodges Librarycontinuation of D-14468: John C Hodges: repairs done that were not storm damage.6/27/20146/16/20246/30/201460D-15093
John C Hodges LibraryPatch & paint walls in 299B WLS. ***SEE MAP***9/16/20140D-15238
Kingston Pike BuildingContinuation of D-14281: Grade parking area SC-40 (gravel portion of lot) at Kingston Pike Building. If Needed add more gravel. There are deep trenches forming in this parking area the need to be addressed. (BC)6/30/20140D-15094
Kingston Pike BuildingBlanket: Routine Maintenance (FY 2012-2013)7/1/20127/1/20126/30/20130D-13009
Kingston Pike BuildingKingston Pike Building 132N has solid wooden door. Please install a standard glass window (full Length) or replace the door with a glass window, whichever is more cost effective.9/8/20140D-15230
Lake Ave Early Learning Ctr (2nd bldg)Continuation of D-13541: Move a playground Gazebo (wooden Structure) from South Doyle High School to the UT Early Learning Center at Lake Avenue. Move cannot take place until the month of June 2013 because in June School will not be in session and children will not be disturbed at South Doyle. We would like the Gazebo moved to 2010/2016 Lake Avenue at the ELC Preschool Playground site. Contact Kathy Kidd for additional information regarding the move and the site it will be moved to. 865-755-2048 (BC)7/1/20148/6/20135/30/20140D-15107
Law Complex: George C Taylor WingLaw Complex: George C Talor Wing - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13281
Law Complex: George C Taylor WingPaint over logo at bottom of directory boxes on eash floor of building with matching blue paint at the Low Complex: George C Taylor Wing. (BC)8/22/20140D-15220
Law Complex: Law Library and Classroom AdditionLaw Complex: Law Library & Classroom Addition - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13282
Lindsey Nelson StadiumLindsey Nelson Stadium - Repair/Replace/Recover the Built-up roof and metal roof due to Storm Damage of April 2011 (XYZ) (S14)11/2/20124/15/20148/30/201410D-13283
McClung Tower and PlazaMcClung Tower - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13286
McCord HallReplace roof at McCord Hall. (Ins) (Cap/Repl) (Replace east tile, review west tile) (XYZ)5/1/20121D-12453
Middlebrook BuildingMiddlebrook Building take down shelves and put in our storage are in room 119P. Patch, repair, and pat the wall in 119P. Install power for wall mounted flat panel monitor in Facilities Planning rooms 119P & 204. Contact Mike Berger @ 974-0599 for details on location of power.7/7/20148/4/20149/30/201490D-15133
Middlebrook BuildingBlanket: Perform Miscellaneous work as needed (FY 2012-2013)7/1/20127/1/20126/30/20130D-13006
Min H. Kao Electrical Engineering & Computer ScienceMin Kao - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13289
Min H. Kao Electrical Engineering & Computer ScienceAdd cooling water for electrical experiments to be used by researchers in room 101, 117, 117A, 117B and 125 Min Kao. Each room shall have a minimum of 1 outlet and 1 inlet controlled via ball valves. Water temperature is not an issue by condensation on pipes should be minimized. The total load will be 50KW or less. Any attached research equipment may use fast acting water valves. Dan Smith has further info. (S14) D-136146/21/20137/14/20149/12/201490D-13614
Min H. Kao Electrical Engineering & Computer ScienceCONTINUATION OF D-14198 Install Ice Guards on Metal Roof of Min Kao (Crisis)7/1/20149/13/201410/31/20141D-15052
Min H. Kao Electrical Engineering & Computer ScienceCONTINUATION OF D-13548 -- Add swipe locks to the following room doors with dual access control by CURENT & Police department. Hallway doors into Min Kao rooms 101, 117, 121A, 121B, 124 (2 doors), 125, 402, 411, 412, 530, 531, 532, 533, 554 & 555. Access7/1/20143/10/20149/12/201496D-15015
Morgan HallCONTINUATION OF D-14377 Morgan Hall 226 - Classroom Upgrade. Carpet, ceramic boards, paint & audio/visual.7/1/20145/7/20148/22/201490D-15043
Morgan Hallinstall cooling/heating device in room 203 Morgan Hall, repaint room, provide & install appropriate cover for an IDF board (picture attached). This replaces the work request dated 2/7/14 for the same room.4/21/20141D-14414
Morgan HallRefer to the Attachments. 1. Morgan Hall Plan 2. Sheet MH-CWI-Dated 5/28/149/3/20140D-15225
Morgan HallMorgan Hall repair and paint room 302G, repair & paint window and door trim & bookcases; stretch & clean carpet. Request paint color swatches.7/30/20140D-15191
Morgan HallMorgan Hall tile Roof Repair. Remove necessary tile and repai damaged sheathing and rafters (XYZ) (Crisis)6/5/201420D-14464
Neyland Drive Biology AnnexReplace metal roof damaged in hail storm on 4/27/11 at Neyland Drive Biology Annex. (Ins) (XYZ)7/29/20141D-15183
Neyland-Thompson Sports CenterNeyland-Thompson Sports Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13291
Neyland-Thompson Sports CenterUpgrade exterior security for doors at Neyland-Thompson Sports Center.7/18/20140D-15169
Nielsen Physics BuildingNielsen Physics Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13292
OFF CAMPUSReplace signage for the Holston Unit of ETREC. Dr. Simpson will be glad to answer any questions. Please see all attached. (BC)6/4/201450D-14458
OFF CAMPUSReplace signs for Plant Sciences. Dr. Simpson will be glad to answer any questions. Please see all attachments!! (BC)6/4/201496D-14457
Outdoor Tennis Center BuildingOutdoor Tennis Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13293
Pasqua Nuclear Engineering BuildingPasqua Nuclear Engineering Building install radiant heaters above exterior roll up door and double doors.7/7/20149/9/201410/3/201410D-15144
Perkins Hallsee attached for details of work to be completed in Perkins Hall. This work must be completed before the fall semester starts because they are used for the Senior Design Rooms. Call Toby Boulet at 974-8376 with questions. D-151547/11/20148/28/201410/3/201420D-15154
Perkins HallReplace roof at Perkins Hall. (Ins) (Cap/Rpl) (Ck Tile) (XYZ)5/1/20121D-12456
Perkins HallInstall new air conditioner unit in suite 219 Perkins hall.8/19/20140D-15210
Philander P. Claxton Education BuildingContinuation of M-12105: SFMO corrections at Philander P Claxton Education Building.1/3/20140D-14278
Plant Biotechnology BuildingReplace window awnings damaged in hail storm on 4/27/11 at Plant Biotech. (XYZ)7/2/20120D-13012
Pratt PavilionReplace metal roof damaged in hail storm on 4/27/11 at Pratt Pavilion. (Ins) (XYZ)7/29/20141D-15184
Pratt PavilionCONTINUATION OF D-13013 Repair or replace window flashing & Lightening rods damaged in storms of 4/25/11 & 4/27/11 at Pratt Pavilion.7/1/20149/11/20129/29/20141D-15059
Pratt PavilionReplace flat roof section of Pratt Pavilion. (XYZ)7/29/20140D-15186
Presidential CourtProvide ventilation in CO2 tank room of Presidential Court.10/21/20135D-14200
Publications and Services BuildingReplace metal roof damaged in hail storm on 4/27/11 at Publications & Services. (Ins) (XYZ)7/2/20121D-13028
Racheff ResearchNew sidewalk needed to connect parking surface outside Racheff GH to new entry. Sidewalk to slope from the edge of the parking lot & connect to the existing slab just outside of the new entrance. Old Entrance is now closed due to GH redesign. Additionally a large slab should be added just past the new entrance for various applications. See Attached Photo`s (2) for details. (S14) D-143362/28/20149/29/201410/13/201490D-14336
Radiological Safety - Old Cherokee TrailInstall safety shower & eye wash station in 101 Radiological Safety. I would like to have the water supply plumbed from the Bass Anthropology Building fixture. This idea was proposed in estimate T-10711. Does not need to be connected to sanitary sewer. Install a shower drain pan to collect any water. The fixtures need to be freeze resistant if possible since the building has no heat. Need an instant water heated connected to the system to meet the OSHA tepid water requirements.5/16/20140D-14434
Radiological Safety - Old Cherokee TrailRadiological Safety - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/201210D-13297
Science and Engineering BuildingContinuation of D-13300: Replace/Repair built up roof from storm damage (XYZ) (Ins)6/25/201490D-15086
Science and Engineering BuildingSERF 338: Power supply, water for chillers & other requirements mentioned in the cut sheets attached for the two new X-ray diffraction instruments. The instruments will arrive in late July.6/18/20148/11/20149/5/201495D-14472
Science and Engineering BuildingSERF 522: Glove box nees to be attached to the ceiling exhaust system.6/16/20145/1/201410/3/201450D-14470
Science and Engineering BuildingSERF 522: Picture one shows where the attachment needs to be made. Picture two shows where the vacuum is located. Picture three shows the vacuum, the filter can be removed or an attachment to go over it. I might be best to leave it so not to suck up pump oil. Please see attached pictures.9/3/20140D-15226
Science and Engineering BuildingSERF 201 replace filter in pressuer regulator. It will require rerouting of the pipe because the new filter is much larger than the old.8/1/20148/25/20149/19/201450D-15195
Science and Engineering BuildingInstall Card Swipe Access to SERF 338.9/12/20140D-15236
Science and Engineering BuildingRenovations to room 603 SERF for Dr. Colleen Jonsson. (SERFHOODS) (CC)9/9/20140D-15231
Sigma Phi Epsilon Fraternity HouseSigma Phi Epsilon Fraternity House install a drain & water pipe/line in dinning room 214 for a drink machine.9/8/20140D-15229
South & East StadiumReplace siding & window flashing damaged in hail storm on 4/27/11 at Neyland Stadium West Skybox/Club. (XYZ)9/11/20120D-13027
South & East Stadium2014 Football Season - Gameday coverage and cleanup.3/26/201410D-14369
South & East StadiumBlanket: 2015 Football Season - work required to get the stadium ready prior to season start July 20147/9/201425D-15149
South & East StadiumCONTINUATION OF D-14371 Assist Longent with the installation of the DAS at Neyland Stadium. This will include mainly high voltage and fire alarm work. Cost is not to excee $5000 per Bryan Lord. See Pinnacle workorder # 90408.7/1/20147/1/201410/31/201480D-15037
South & East StadiumScrape existing paint off radiators in East Stadium Hall and paint. Need cost per hour for both scraping and painting, please.7/1/20149/4/20149/12/20140D-15103
South CollegeInstall ADA opener on doors at top of HC ramp at South College.7/25/20149/15/201410/31/201410D-15181
Southeast Precast WarehouseCONTINUATION OF D-13567: Site preparation for new Facilities Services Complex at 2000 Sutherland Avenue.7/1/20141D-15111
Stokely Management CenterRenovations to 2nd floor break area at SMC. See attached.6/4/20141D-14461
Stokely Management CenterRenovation of Lounge Service Area in SMC 710. See attached for details.3/6/20141D-14343
Stokely Management CenterStokely Management Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13304
Stokely Management CenterRenovate 7th floor SMC. See attached work list and drawings.2/11/20147/1/20147/1/201510D-14321
Stokely Management CenterReplace carpet on second floor of Stokely Management Center.5/1/20140D-14423
Stokely Management CenterSMC 5th floor common areas: 1. Repair & repaint walls of common areas as shown on attached plan. Colors TBD by department. 2. Replace carpet in common areas with carpet tiles. Pattern to be chosen by department. Room numbers & door mounted name plates will be replaced with units matched to those used on the 3rd floor SMC. (Marketing Dept) 4. Outside of elevator door will be cleaned and repainted. Common Areas are 599, 599A,B,C,D; 527, 521B, 505A,B,C. Tiffany Shuler will assist the department with paint & carpet colors.12/9/20130D-14256
Stokely Management CenterInstall new carpet in room 628 Stokely Management. Paint rooms 628 & 635 SMC.8/21/20140D-15216
Student Services BuildingStudent Services Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13308
Temple HallInstall campus standard gate with hasp to retard access to air handler on ground at Temple Hall.8/15/20140D-15207
Temple HallCONTINUATION OF D-14090: Facilities Services support for Phase II renovations (C13)7/1/20147/1/20134/25/201496D-15114
Thompson-Boling Assembly Center and ArenaReplace old TV monitor & install 37" monitor (ceiling Mount) in front of command post. We have possession of 37" replacement monitor. Will need appropriate mount to secure to overhead structure.7/16/20140D-15161
Thompson-Boling Assembly Center and ArenaBlanket: Miscellaneous work as needed (FY 2012-2013)7/1/20127/1/20126/30/201390D-13003
Thompson-Boling Assembly Center and ArenaBlanket: HVAC Water Treatment (FY 2012-2013)7/1/20127/1/20126/30/20130D-13007
Thompson-Boling Assembly Center and ArenaAssist Longent with the installation of DAS at Tompson Boling Arena. This will include mainly high voltage and fire alarm work. Cost not to exceed $5,000 per Bryan Lord. See Pinnacle work order # 92324.7/15/20147/1/201410/31/201480D-15159
Thompson-Boling Assembly Center and ArenaMagnetic door hold open devices connected to fire alarm for various doors in Blount Hall. See Carolyn. Estimate requested by 4/25/14. Please contact Carolyn Underwood In Facilities Services for additional instructions. The doors are located in the lobby area of the 1st floor (two doors on east side & 2 doors on west side of lobby), double doors on ground floor of Blount Hall entering into suite area A008, and double doors on 4th floor of Blount Hall leading into hallway area 499B.5/28/20140D-14452
Tom Black Track Facilities BuildingATTN: Roger McDonald, please fix the light pole at Tom Black Track/LaPorte Stadium. Contact Brad Hallums 809-39247/9/20148/29/20149/26/201410D-15152
University Commons Vol ShopUniversity Commons, need alarm system set up, panic button, motion detectors, pin pad/sensors on doors.9/3/20140D-15227
UT Welcome CenterNeed electrical work on in varoious spots throughout UT Welcome Center. Two new outlets added and 1 potentially slpit with mid-wall outlets created for IPOD docking stations. Would prefer a walk-through before work starts so we can arrange to have ther person who knows exctly wher placement is needed present to show.7/30/20149/22/201410/31/201495D-15192
UT Welcome CenterCONTINUATION OF D-13620 : Additional improvements to the UT Welcome Center including exterior repairs and painting, cameras, awning, etc. (C13)6/24/201410/5/201310/24/201490D-15083
UT Welcome CenterCONTINUATION OF D-12459 Replace roof & windows. Waterproof Basement at the Welcome Center.7/1/20145/19/20147/21/201495D-15058
Veterinary Teaching HospitalVet Teaching Hospital room A-113-E reinforce a wall so that it can hold a 60" flat screen Television, Paint over the reinforcement , add an electrical outlet to supply power to the TV; outlet should be behind the TV to hide the wires. Needs two estimates, one that includes electrical and one that does not include electrical.7/1/20140D-15104
Veterinary Teaching HospitalVeterinary Teaching Hospital - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13311
Walters Life Sciences BuildingMake improvements to humidification systems for the animal facility at WLS.7/17/20140D-15163
Walters Life Sciences BuildingPaint rooms M407 & M407A WLS. Department would like to select color.8/21/20140D-15214
Walters Life Sciences BuildingWalters Life Sciences Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13313
Walters Life Sciences BuildingConvert existing 208V - 20A emergency Power outlet to a 115v - 20A outlet remainting on Emergency Power in A214 WLS.8/21/20140D-15215
West Skybox AdditionCONTINUATION OF D-14366 Renovations to rooms 501 & 502 to create one space in West Skybox of Neyland Stadium.7/1/20145/2/20148/22/201496D-15034



 

Contribute to a big idea. Give to UT.

The University of Tennessee, Knoxville. Big Orange. Big Ideas.

Knoxville, Tennessee 37996 | 865-974-1000
The flagship campus of the University of Tennessee System