Current Open Projects (Summer 2013):

BUILDINGDESCRIPTIONDATE APPROVEDSCHED TO BEGINSCHED TO COMPLETE% COMPLETEPROJECT NUMBER
2121 Stephenson DriveRedesign the layout of staff area 23 located at the corner of Pat Head Summitt and Andy Holt Blvd. This should include any surfacing coating and restriping of the parking area. The goal is to provide design options for approval that will minimize the loss of existing parking spaces yet achieve more room for people to enter/exit threir parked vehicles. (S13)2/12/20137/30/20138/9/20131D-13429
AG CAMPUSInstall Lighting for Rugby Field at Fulton Bottoms. (S13)1/11/20126/17/20138/30/20131D-12272
Andy Holt TowerCreate new VC space beside conference room on 4th floor. (S13)12/31/20123/20/20135/10/201385D-13375
Art and Architecture BuildingRemove graffiti from the exterior and interior of A & A and re-stain or paint as necessary. (S13)4/22/20135D-13512
Art and Architecture BuildingRenovations for McCarty Auditorium, room 109. (S13)1/11/20135/8/20138/12/201310D-13391
Biosystems Engineering and Soil Science Labs BuildingClassroom Upgrade 2012 - BEES 268/270 (S13)1/22/20135/8/20138/12/20135D-13403
Burchfiel Geography BuildingPour slab to create storage spaces in unfinished area room 204. (S13)5/19/20106/17/20131D-10462
Burchfiel Geography BuildingClassroom Upgrade 2012 - Burchfiel Geography 101 (S13)12/17/20125/8/20138/12/201310D-13359
CAMPUSFraternity Park - Improve landscaping to bring the Park up to Landscape Master Plan standards. Includes: Addition of Understory Trees and Accent Planting, Irrigation of Lawn and Landscape, Site Amenitites: (13) Site Benches, (9) Trash Receptacles, (25) Additional Trees, Site Amenitites: (10) Site Benches, renovate ballcourts, and Sidewalk Repairs. (CC) (S13)9/11/20125D-13155
CAMPUSFraternity Park- Install exterior lighting (front and rear) and security cameras for exterior coverage. (CC) (S13)9/11/20123/19/20138/30/201330D-13148
CAMPUSCONTINUATION OF D-10099 Replace transformers Perkins Hall, Andy Holt Tower, Communications, Humanities and McClung Tower. (CHANCELLOR-NR11) (CC) (S13)6/12/201310D-13593
CAMPUSFraternity Park - Relocate and rework dumpster locations. (CC) (S13)9/11/20121D-13156
CAMPUSFraternity Park - Install entrance wall/sign(s) similar to the other Campus main entrances. (CC) (S13)9/11/20121D-13157
CAMPUSResurface/Striping large parking lot adjacent to Baseball Stadium. (S13)12/19/20121D-13323
CAMPUSClean/polish all Code Blue phone units on campus once annually. (S13)8/29/20120D-13146
CAMPUSSite preparation for new Facilities Services Complex at 2200 Sutherland Avenue. (S13)5/30/20130D-13567
CAMPUSImprovements to Campus Entrances. Refurbising of plantings, lighting, and irrigation. (S13)5/1/20135/1/20135D-13527
CAMPUSSpring Clean up 2013 (S13)3/25/20134/17/20138/2/201375D-13483
Clarence Brown TheatreReplace wooden ramp to Lab Theatre with permanent ramp. (ADA) (NO LABOR) (S13)8/17/20121D-13108
College of NursingRenovation of Ladies Restrooms. (S13)10/17/20115/15/20138/1/201340D-12181
Communications and University Extension BuildingMonitors, computer networking, and related electrical for lobby renovation. Includes work required for completion of overall lobby renovation. (S13)8/31/20115/14/20123/29/201395D-12121
Conference Center BuildingRenovations for the Psychology Clinic at the Conference Center Building. (CC) (S13)9/19/20125/8/20137/28/201340D-13167
Conference Center BuildingReplace the damaged concrete sidewalk around the exterior perimeter of the Conference Center to match existing exposed aggregate concrete. (CC) (S13)9/11/20121D-13128
Dabney-Buehler HallClassroom Upgrade 2012 - Buehler Hall 475 (S13)12/17/20125/8/20138/12/201310D-13360
Dabney-Buehler HallClassroom Upgrade 2012 - Buehler Hall 476 (S13)12/17/20125/8/20138/2/201310D-13358
Dougherty Engineering BuildingRenovations to room 110 Dougherty Engineering Building. (S13)3/21/20135/1/20137/31/201370D-13481
Dougherty Engineering BuildingDougherty Repairs - Phase II (CONTINUATION OF D-10324) (S13)6/4/20135D-13575
Earth and Planetary Sciences BuildingClassroom Upgrade - Earth & Planetary Sciences room 405 (S13)1/22/20135/8/20138/12/201310D-13406
Earth and Planetary Sciences BuildingClassroom Upgrade 2012 - EPS 302 (S13)1/22/20135/8/20138/12/20135D-13405
Frank H. McClung Museum of Natural History and CultureClassroom Upgrade 2012 - McClung Museum 63 (S13)1/22/20135/8/20138/12/20131D-13404
Greve HallGreve Hall; install a system that will allow occupants to legally prop open office doors without violating fire code. Two possible solutions were suggested to Bryan Lord: (S13)2/15/20131D-13449
Humanities and Social Sciences BuildingReplace steps and ADA ramp for Lot 9 at South End of Humanities. (NO LABOR) (S13)1/11/20130D-13231
Jessie W. Harris BuildingRepair floors in the animal facility at Jessie Harris. Wash and repaint the floor in the dirty side cage. The flooring was cited in our latest IACUC inspection. It should be noted that our Accreditation site visit from AAALAS takes place this coming Summer, and should be given quick attention. (S13)2/18/20136/24/20137/29/201320D-13453
Jessie W. Harris BuildingJHB rm 329--remove roll out window; replace HVAC unit with window unit; paint walls; wash & wax floor. JHB rm 337--replace lighting (upgrade); remove cabinet on wall by window & repair wall; repair heating & AC unit in ceiling; replace windows/reinstall window AC unit if necessary; remove piping in ceiling and blower connected to the window; paint walls; wash & wax floors. Need for new incoming faculty person. (S13)12/17/20123/22/20136/30/201350D-13342
John C Hodges LibraryRenovations for converting Hodges Library to 24/7 operation. Add emergency phones at every elevator stop at every floor. Add cameras (see Cpt. Lambert). Add lighting & power for device (laptops, phones, etc) chargers near elevators on each floor. Add security measurers to Volunteer Boulevard entrances (lasers). (S13)7/2/20125/20/20138/30/201315D-13034
John C Hodges LibraryClean the inside & outside of the windows on the 1st & 2nd floors. (S13)12/17/201290D-13352
John D. Tickle Engineering BuildingProvide Technology systems for 4 classrooms in the Tickle Building. (S13)7/2/20126/3/20138/16/20130D-13036
John D. Tickle Engineering BuildingTickle Building - move-in to facility after construction. (S13)5/9/20131D-13546
Kingston Pike BuildingInstall a second water chiller at the Kingston Pike Building. (S13)5/20/20114/8/201375D-11488
Lindsey Nelson StadiumElectric Shop to install magnets on numerous doors at Lindsey Nelson Baseball Stadium as soon as possible. (S13)3/19/201211/12/20127/12/201390D-12378
Lindsey Nelson StadiumRepair or replace field lighting damaged in hail storm on 4/27/11 at Lindsey Nelson Stadium. (S13)9/11/20125D-13023
Min H. Kao Electrical Engineering & Computer ScienceConstruct Min Kao loading dock behind Dougherty. (S13)2/13/20124/15/20136/14/201390D-12320
Music CenterProvide technology systems for 9 classrooms in the Music Building. (S13)7/2/20124/11/20138/16/201310D-13035
Music CenterFacilities Services to assist with Band Uniform Storage Conveyor System and for installing Theatrical Lighting for Recital Hall in the Music Building. (S13)5/16/20135/30/20137/19/201390D-13556
Music CenterMusic Building - move-in to facility after construction. (S13)3/14/20135D-13478
Nielsen Physics BuildingRenovate lab space in 506 & 507 Nielsen Physics into office space for Graduate Research Assistant`s research work and Study Area. Provide layout, office landscape partitions, electrical and network connections. This work has to be coordinated with establishing astronomy laboratory in Nielsen 108 in connection with the planetarium project. (SERFHOODS) (CC) (S13)11/29/20120D-13333
Racheff ResearchRenovations including back-up generator for non-life safety process use and HVAC controls. (S13)8/1/20112/11/201310/18/20135D-12059
Science and Engineering BuildingInstall two fume hoods in room 603 SERF. (CC) (SERFHOODS) (S13)1/23/20123/15/20134/16/201350D-12289
Science and Engineering BuildingInvestigate feasibility of installing two 8 foot hoods in room 518 SERF. (CC) (SERFHOODS) (S13)1/23/20127/26/20139/16/20130D-12288
Science and Engineering BuildingInstall fume hood in 606 SERF. (CC) (SERFHOODS) (S13)1/23/20123/20/20134/26/20131D-12291
Science and Engineering BuildingInstall two fume hoods in 536 SERF. (CC) (SERFHOODS) (S13)1/23/20124/29/20138/5/20135D-12292
Science and Engineering BuildingRenovation of lab 718 at SERF. (SFMO) (S13)6/27/20117/9/201212/1/201295D-11539
Science and Engineering BuildingInstall three fume hoods in room 218 SERF. (CC) (SERFHOODS) (S13)1/23/20124/10/20135/16/201390D-12293
Science and Engineering BuildingInstall fume hoods in room 312 SERF. (CC) (SERFHOODS) (S13)1/26/20122/13/20135/16/201350D-12296
Science and Engineering BuildingRepairs for 4th floor entrance skylight at SERF. (Crisis) (CC) (S13)5/1/20121D-12444
Science and Engineering BuildingBuild a permanent wall that separates the "wedge space" in Serf 538 from the other part of 538. (SERFHOODS) (S13)8/8/20125/6/20136/30/201380D-13092
Science and Engineering BuildingSERF 606: Lab renovations, in addition to and not including work for fume hoods. (CC) (SERFHOODS) (S13)8/22/20121D-13124
Science and Engineering BuildingAdd fire alarm controllers on each floor of SERF to accommodate additional strobes. (CC) (C12) (SERFHOODS) (S13)9/11/201210/15/20126/28/201390D-d-12378
Science and Engineering BuildingSERF 603/604: Lab renovations, in addition to and not including work for fume hoods. (CC) (SERFHOODS) (S13)8/22/20125/20/201310D-13125
Science and Engineering BuildingSERF 218: Lab renovations, in addition to and not including work for fume hoods. (CC) (SERFHOODS) (S13)8/22/20124/12/20135D-13126
Science and Engineering BuildingAdd one fume hood to room 702 SERF. (CC) (SERFHOODS) (S13)11/19/20120D-13330
Science and Engineering BuildingSERF 312: Lab renovations, in addition to and not including work for fume hoods. (CC) (SERFHOODS) (S13)8/22/201210/1/20126/5/201310D-13123
South & East StadiumWork associated with the DAS (Distributed Antenna System) project. (Wireless communication tower) (S13)5/16/20128/28/20125D-12493
Stokely Management CenterReplace Fire Alarm System. (FACPL) (ADA) (No labor) (S13)9/30/20116/11/20127/31/201350D-12149
Stokely Management CenterReplace doors from basement to vestibule between G2 & G4 SMC. Replace doors from plaza to G2. Also includes handrail replacement around area wells. (S13)2/19/20130D-13455
Thornton Athletics Student Life CenterInstall system to eliminate moisture for sunken slab area at main entrance of Thornton Athletics. (S13)3/28/20130D-13472


Current Open Projects (ALL):

BUILDINGDESCRIPTIONDATE APPROVEDSCHED TO BEGINSCHED TO COMPLETE% COMPLETEPROJECT NUMBER
11th Street Parking GarageInstall photovoltaic system for research on 11th Street Parking Garage. Provide raceways to Min Kao.5/29/20130D-13561
1643 Cumberland Avenue - Commercial BldgMcMillens Bookstore & Dynasty Rest. - Repair/Replace/Recover the Built-up roof (XYZ)3/28/20131D-13287
1817 Melrose AvenueInstall blinds on windows in room 201 at 1817 Melrose Avenue.5/2/20131D-13533
2121 Stephenson DriveRedesign the layout of staff area 23 located at the corner of Pat Head Summitt and Andy Holt Blvd. This should include any surfacing coating and restriping of the parking area. The goal is to provide design options for approval that will minimize the loss of existing parking spaces yet achieve more room for people to enter/exit threir parked vehicles. (S13)2/12/20137/30/20138/9/20131D-13429
2121 Stephenson DrivePave area 66 located off Fletcher Luck Lane near Plant Sciences Annex B.5/9/20111D-11473
2121 Stephenson DriveReference Environmental Health & Safety Report dated 8/18/09. Estimate cost to repair various trip hazards identified in parking area S14 near the Warehousing offices. Specifically, raised utility boxes, overturned wheel stops, and loose covers to hole.11/11/20101D-11194
AG CAMPUSInstall Lighting for Rugby Field at Fulton Bottoms. (S13)1/11/20126/17/20138/30/20131D-12272
Alpha Gamma Rho Fraternity HouseAlpha Gamma Rho Fraternity - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13240
Alumni Memorial BuildingReplace door sign from previous occupant of G026 Alumni Memorial Building with a new sign that names the current occupant. NEW SIGN: MFLL Lecturers6/5/20130D-13579
Andy Holt TowerCreate new VC space beside conference room on 4th floor. (S13)12/31/20123/20/20135/10/201385D-13375
Andy Holt TowerAndy Holt Tower - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13242
Art and Architecture BuildingArt & Architecture Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13243
Art and Architecture BuildingReplacement or possible upgrade for our current swipe card system at 2nd floor bridge stairs, stairs at 1st level atrium; loading dock area at A & A. Installing a new swipe card system is in the main administrative office room 224 (please see attached documentation and correspondence from Captain Severs & Tim York). (CC)7/5/20120D-13039
Art and Architecture BuildingPatch & Paint room 204 A & A.4/26/20136/23/20136/24/20131D-13523
Art and Architecture BuildingRenovations for McCarty Auditorium, room 109. (S13)1/11/20135/8/20138/12/201310D-13391
Art and Architecture BuildingRemove graffiti from the exterior and interior of A & A and re-stain or paint as necessary. (S13)4/22/20135D-13512
Art and Architecture BuildingRequest for cleaning & removal of graffiti off the building at the entrance 2nd floor bridge, dock area and lower levels, testing of small area to make certain the building is not damage with any chemicals before cleaning entire building.5/9/20120D-12480
Art and Architecture Buildinginstall the following sleeves in A & A: 4" conduit in room 413A - This will be 1 continuous pipe out into the hallways outside 413A through the floor to 309A1. 4" sleeve through the floor of 409C down outside 307; 4" Sleeve outside 307 dow to 215E; 4" sleeve down from 215E to 105A; 4` sleeve from 231 down to 103B; 1" sleeve 119 through wall into 121.3/28/20135/27/20136/14/20131D-13471
Austin Peay BuildingInstallation of a projector mount, power for a projector and core drill under the table with conduit to the projector in Austin Peay 411. Estimator should contact Mike Berger in OIT for more details regarding what is needed. Would like to have work complete in summer 2013, but pay from FY 13 funds.6/12/20130D-13590
Austin Peay BuildingPaint the open suite of 215 and room 215 D, E, & G. Depending upon approval of the estimate, this work should be completed in June or early July of this summer, but we will be using funds from this fiscal year.6/12/20130D-13591
Austin Peay BuildingReconfigure Austin Peay rooms 203, 203A, 205B, 225, 225A, 225B, 225C, 226E, 226F, 226G1, 227, 227A, 227B, 227C, 227E, 227F as shown on drawing. Make necessary changes in lighting, HVAC, door location, electrical, paint and ceiling. Paint & replace carpet in rooms 207A, 207B, 207C,205C, hall 207W, 224, 226B, 226C, 226D.6/12/20130D-13592
Austin Peay BuildingAustin Peay Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13244
Auxiliary Services BuildingAuxiliary Services Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13245
Ayres HallAyres Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13246
Ayres HallAdd additional cubicle area near the waiting area for an additional graduate student space in 313 Ayres Hall. Dean Wessels has the measurements. Would like this work completed at or around the same time as the cubicles additions for Ayres 327.3/27/20135D-13484
Ayres HallAdd an additional cubicle space similar to the professional advisors` office cubicle in Ayres 313. The first space on the left as you enter 327 seems like the best spot. The 313 cubicle walls are over 6`5" and if possible we would like the walls for 327 to be that high as well.3/27/20135D-13485
Berry HallBerry Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13247
Biosystems Engineering and Soil Science Labs BuildingInstall new furniture in room 276 Biosystems Eng (computer tables & chairs) for CASNR computer lab. Would like to increase capacity from 24 to 32.4/23/20131D-13515
Biosystems Engineering and Soil Science Labs BuildingClassroom Upgrade 2012 - BEES 268/270 (S13)1/22/20135/8/20138/12/20135D-13403
Biosystems Engineering and Soil Science Labs BuildingBiosystems Eng & Soil Sci Labs - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13248
Biosystems Engineering and Soil Science Labs BuildingReplace roofs damaged in hailstorm on 4/27/11 at BEES Office Building. (BU and tile) (Ins) (Cap/Repl BU) (XYZ)7/2/20121D-13016
Black Cultural CenterReplace fan shrouds, or replace fans damaged in hailstorm on 4/27/11 at Black Cultural Center.7/31/20120D-13017
Black Cultural CenterClean windows throughout the Black Cultural Center.5/8/20130D-13540
Black Cultural CenterBlack Cultural Center has 4 sandwich boards fro promoting programs. Please provide 8 plexiglass covres measuring 2`x4` to cover the promotional advertisements that will be displayed on these boards. Please provide 8, 2`x3` plexiglass covrs for the sandwich boards. When cuts, the plexiglass covers will need to be screw-mounted to each sandwich board to provide some weather protection.6/7/20130D-13584
Blount HallRe-key offices on 4th floor of Blount Hall.5/6/20131D-13537
Blount HallElectrical work for 4th floor of Blount Hall. Pigtails removed and replaced with duplex outlets in 404, 406, 409 & 410. Solid wall plate covers in 408, 409 & 410.4/23/20135/24/20136/21/201395D-13517
Blount HallInstall glass wall with double doors on the ground floor of Blount Hall. The glass would partially separate A001 from A004. Please see Beth Neilson & Renee Thomas when arriving. See attached for more detail.4/22/20130D-13510
Blount HallBlount Hall rooms 401, 401A, 401B, 401C, 402, 403, 403A, 403B fill holes and paint, deep clean carpets to remove stains. Rooms 401B & 401A move doorways so that exit will be in main corridor (416) and not 401. Data, telecom, and electrical as needed for modular furniture.3/28/20135/1/20136/20/201395D-13487
Blount HallBlount Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13249
Brenda Lawson Athletic CenterBrenda Lawson Athletic Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13250
Brenda Lawson Athletic CenterElectric Shop to please install proxy readers (6) in Brenda Lawson Center.7/13/201110/29/20125/31/201390D-12031
Burchfiel Geography BuildingClassroom Upgrade 2012 - Burchfiel Geography 101 (S13)12/17/20125/8/20138/12/201310D-13359
Burchfiel Geography BuildingPour slab to create storage spaces in unfinished area room 204. (S13)5/19/20106/17/20131D-10462
Burchfiel Geography BuildingBurchfiel Geography Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13251
Business IncubatorBusiness Incubator - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13252
Butler BuildingReplace metal roof damaged in hailstorm on 4/27/11 at Butler Building. (Ins)7/2/20120D-13018
CAMPUSSpring Clean up 2013 (S13)3/25/20134/17/20138/2/201375D-13483
CAMPUSRepair/replace the roof at 1643 Cumberland Avenue. (XYZ)2/14/20130D-13447
CAMPUSGreen Project - Student Interns for FY 2012-20137/13/201210D-13049
CAMPUSBlanket: Disabilities Accommodations (FY 2012-2013)7/1/20127/1/20126/30/201310D-13002
CAMPUSClean/polish all Code Blue phone units on campus once annually. (S13)8/29/20120D-13146
CAMPUSFraternity Park- Install exterior lighting (front and rear) and security cameras for exterior coverage. (CC) (S13)9/11/20123/19/20138/30/201330D-13148
CAMPUSFraternity Park - Improve landscaping to bring the Park up to Landscape Master Plan standards. Includes: Addition of Understory Trees and Accent Planting, Irrigation of Lawn and Landscape, Site Amenitites: (13) Site Benches, (9) Trash Receptacles, (25) Additional Trees, Site Amenitites: (10) Site Benches, renovate ballcourts, and Sidewalk Repairs. (CC) (S13)9/11/20125D-13155
CAMPUSFraternity Park - Relocate and rework dumpster locations. (CC) (S13)9/11/20121D-13156
CAMPUSFraternity Park - Install entrance wall/sign(s) similar to the other Campus main entrances. (CC) (S13)9/11/20121D-13157
CAMPUSResurface/Striping large parking lot adjacent to Baseball Stadium. (S13)12/19/20121D-13323
CAMPUSProgramming for Academic Building 1 (Melrose site)7/13/20125D-13056
CAMPUSGREEN PROJECT- MOG Education, Publicity & Support - Year 8 (2012-2013)7/11/201210D-13046
CAMPUSBlanket - Annual maintenance for water bottle filling fountains only. (FY1013 and FY 2014)1/11/20130D-13392
CAMPUSGreen Project - Install flash tanks to trap high pressure traps to low side of building systems, allowing venting to low side steam system, and trappping then to condensate receivers.1/11/20130D-13393
CAMPUSGreen Project - Install water bottle filling stations. (2012-2014) (years 1 and 2 of 5) (Communications, Humanities, Nursing)1/11/20131D-13394
CAMPUSGreen Project - Reinsulate steam lines. (2012-2014) (years 1 and 2 of 5)1/11/20131D-13395
CAMPUSGreen Project - Low flow plumbing fixtures. (2012-2014) (years 1 and 2 of 5)1/11/20130D-13396
CAMPUSBlanket - general maintenance in classrooms to include replacing markers, erasers, seating repairs, painting, etc. (FY13)1/29/201350D-13410
CAMPUSServicing & Testing kitchen hoods and ductwork for Aramark (FY 12-13)3/28/201310D-13428
CAMPUSProgramming for Class Lab 1 to be built at Cumberland and 13th Street.7/13/20125D-13051
CAMPUSCONTINUATION OF D-10099 Replace transformers Perkins Hall, Andy Holt Tower, Communications, Humanities and McClung Tower. (CHANCELLOR-NR11) (CC) (S13)6/12/201310D-13593
CAMPUSCONTINUATION OF D-10100 Upgrade lighting in Student Services, Communications, HPER, and Bailey Education. (CHANCELLOR-NR11) (NR11-$4.84M) (CC)6/12/201350D-13594
CAMPUSImprovements to Campus Entrances. Refurbising of plantings, lighting, and irrigation. (S13)5/1/20135/1/20135D-13527
CAMPUSSite preparation for new Facilities Services Complex at 2200 Sutherland Avenue. (S13)5/30/20130D-13567
CAMPUSUse of City of Knoxville´s John Clabo Field at Duff Park during a time period that Fulton Bottoms will be occupied by KUB.9/28/201110D-12147
CAMPUS (Parking Lot N-16)Pave N-16 Lot (corner of Lake and 16th Street)5/9/20111D-11474
Carrick Hall NorthCarrick Hall North - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13253
Carrick Hall SouthCarrick Hall South - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13254
Ceramics AnnexReplace roof and skylight at Ceramics Annex. (Ins) (XYZ)5/1/20120D-12447
Clarence Brown TheatreRebuild the storage room, dust collector room and sound and lighting room at Clarence Brown Theatre out of non combustible material. (CC)2/20/20130D-13461
Clarence Brown TheatreRebuild trapped portion of stage floor at Clarence Brown Theatre. Existing floor is showing signs of weakness and failure due to 41 years of use. See Architectural Plate T1 (attached) for details on the existing system. Some portions of the framing and telespar supports may be usable, but a substantial amount will need to be replaced. (CC)2/20/20130D-13460
Clarence Brown TheatreReplace HVAC system in Lab Theatre with system sufficient for current needs at Clarence Brown Theatre. (CC)2/20/20130D-13458
Clarence Brown TheatreReplace HVAC in basement of Clarence Brown Theatre. (CC)2/20/20130D-13457
Clarence Brown TheatreClarence Brown Theatre - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13255
Clarence Brown TheatreReplace wooden ramp to Lab Theatre with permanent ramp. (ADA) (NO LABOR) (S13)8/17/20121D-13108
Clarence Brown TheatreProvide shunt trip for sound system when fire alarm activates at Clarence Brown Theatre. (CC)2/20/20130D-13456
Clarence Brown TheatreProvide fire protection system for stage area and proscenium including fire separation curtain and re-initiation of deluge system at Clarence Brown Theatre. (CC)2/20/20130D-13459
College of NursingCollege of Nursing - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13257
College of NursingRenovation of Ladies Restrooms. (S13)10/17/20115/15/20138/1/201340D-12181
College of NursingMove the KARDEX filing cabinet into the maon office area (room 203 College of Nursing). Repair walls and carpet as needed in order to convert 203B into another Office.5/8/20130D-13542
Communications and University Extension BuildingInstall magnetic locks and card readers to control access to room 21, 26 (consumable inventory warehouse) and 30 (classroom upgrade inventory warehouse) in Communications Building.1/31/20131D-13420
Communications and University Extension BuildingCommunications - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13258
Communications and University Extension BuildingMonitors, computer networking, and related electrical for lobby renovation. Includes work required for completion of overall lobby renovation. (S13)8/31/20115/14/20123/29/201395D-12121
Communications and University Extension BuildingEstimate for work as designed in T-10514 on 4th floor Lobby in Communication outside the School of Information offices, Suite 451. Per designs by Keith Downen and team finalized 12/12/12.5/15/20130D-13554
Communications and University Extension BuildingReplace current light sensor switches to adjustable dimmer switches that have factory presets, on or off, and allows fine adjustments form 0% to 100% in rooms 455, 456, 457 Conference at Communications.3/13/20130D-13476
Communications and University Extension BuildingRemove existing carpet, install new carpet and paint room 442 Communications.5/3/20131D-13534
Conference Center BuildingBlanket: Miscellaneous work as needed (FY 2012-2013)7/1/20127/1/20126/30/201310D-13001
Conference Center BuildingRenovations for the Psychology Clinic at the Conference Center Building. (CC) (S13)9/19/20125/8/20137/28/201340D-13167
Conference Center BuildingReplace the damaged concrete sidewalk around the exterior perimeter of the Conference Center to match existing exposed aggregate concrete. (CC) (S13)9/11/20121D-13128
Crops Genetic LaboratoryReplace roof at Crops Genetics. (Review Tile) (Repl slate)5/1/20120D-12448
Dabney-Buehler HallClassroom Upgrade 2012 - Buehler Hall 476 (S13)12/17/20125/8/20138/2/201310D-13358
Dabney-Buehler HallClassroom Upgrade 2012 - Buehler Hall 475 (S13)12/17/20125/8/20138/12/201310D-13360
Delta Tau Delta Fraternity HouseDelta Tau Delta Fraternity - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13261
Dougherty Engineering BuildingDougherty Repairs - Phase II (CONTINUATION OF D-10324) (S13)6/4/20135D-13575
Dougherty Engineering BuildingInstall swipe card access to room 337 & 227 Dougherty Engineering.10/3/201210D-13191
Dougherty Engineering BuildingPaint and carpet room 403 Dougherty by 6/28/13.6/6/20131D-13580
Dougherty Engineering BuildingDougherty Engineering - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13262
Dougherty Engineering BuildingDougherty 407 is a three-room suite and all three rooms need to be painted and the carpet to be cleaned before 6/28/13.6/5/20131D-13576
Dougherty Engineering BuildingPaint & recarpet room 410 Dougherty Engineering. Would lide a padding for the carpet if possible.6/17/20130D-13600
Dougherty Engineering BuildingInstall door with window kit and Simplex lock (punch code lock) on room 211 Dougherty Engineering.4/3/20135/14/20136/30/201397D-13488
Dougherty Engineering BuildingRenovations to room 110 Dougherty Engineering Building. (S13)3/21/20135/1/20137/31/201370D-13481
Dougherty Engineering BuildingPurchase and mount three glass marker boards on the north wall of Dougherty room 421. If available, the center board should be 7 feet wide and the left and right boards should be 6 feet wide. Due to conduit mounted on the wall, the boards will have to be stood out for the wall. A projection screen switch will need to be moved to the west wall. Pen and eraser trays should be included with each board.4/9/20136/11/20136/13/201397D-13501
Dunford HallDunford Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13263
Early Learning CenterSecurity buzzer to all outside door for ELC which would trigger an ELC personnel to have access. Please look into other options like: key code system or key scan card system. Install mag locks and card readers on two classroom entry doors.8/15/20123/25/20136/21/201395D-13104
Early Learning Center - Research & PracticeSecurity buzzer (soft sound) to all outside doors of Early Learning Center which would trigger an inside ELC personnel to allow access into the building. Please rush for security reasons.8/14/20123/25/20136/21/201395D-13098
Early Learning Center - Research & PracticeReplace built-up roof, windows, and masonry repairs at ELC-1206 White Avenue. (XYZ)5/1/20121D-12460
Earth and Planetary Sciences BuildingClassroom Upgrade - Earth & Planetary Sciences room 405 (S13)1/22/20135/8/20138/12/201310D-13406
Earth and Planetary Sciences BuildingClassroom Upgrade 2012 - EPS 302 (S13)1/22/20135/8/20138/12/20135D-13405
East Skybox & PressboxEast Skybox & Pressbox - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13264
Ellington Plant Sciences BuildingGas lines to be installed in 105 Ellington Plant Sciences to be connected to a clean bench.4/22/20135/22/20136/14/201395D-13511
Ellington Plant Sciences BuildingProgramming for Ellington Plant Sciences.7/13/20125D-13055
Estabrook HallNetwork/Telephone to install 11 circuits in Estabrook. Rooms 100, 101, 102, 104A, 104B, 105, 105B, 105 Hallway all need 1 circuit Room 103 needs 2 circuits. The circuits will originate at one of the network closets depending on which loction is easier to access. Ben Rayfield & Justin Forbes will be contacts for placement of the circuits.5/14/20136/10/20136/28/20131D-13553
ETREC Johnson Animal Research BuildingReplace roofs damaged in storms of 4/25/11 & 4/27/11 at KES Johnson Animal Research. (Ins) (Cap/Rpl) (Metal and BU) (XYZ)7/2/20121D-13011
Ferris HallFerris Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13265
Ferris HallInstall restrooms on second floor Ferris Hall. (SFMO) (ADA) (NO LABOR)11/14/201195D-12217
Food Safety and Processing BuildingReplace roof at Food Safety. (Ins) (Cap/Repl) (Review tile)5/1/20120D-12450
Frank G. Clement HallFrank G Clement Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13256
Frank H. McClung Museum of Natural History and CultureClassroom Upgrade 2012 - McClung Museum 63 (S13)1/22/20135/8/20138/12/20131D-13404
Frank H. McClung Museum of Natural History and CultureMcClung Museum - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13285
Gibbs HallGibbs Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13266
Gibbs HallContract with Del-Air to replace electric control valves, thermostats and sensors as identified by building Maintenance at Gibbs Hall. Currently identified 41 units that need work.3/20/20131D-13480
Golf Team FacilityPlumbing/Facilities Services to install hot water heater and a utility sink at he Mack & Jonnie Day Golf Practice Facility (2045 Alcoa Highway). Contact Mark Gossett @ 209-09074/3/20130D-13490
Goodfriend Tennis CenterInstall and set up new alarm system (maglocks) to work properly throughout Goodfriend Tennis Center.9/24/20121D-13175
Greve HallElectrical outlets needed on walls without whiteboards in the following spaces in Greve Hall: 401-405; 407; 414-417; 422-426; 428-429; 431-433; 435-439; 431-433; 435-439. Original PP28 attached since this was part of our original renovations that needed to be done.6/17/20130D-13604
Greve HallReplace broken windows in Greve Hall room 111.6/12/20130D-13589
Greve HallGreve Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13267
Greve HallReplace door on 111 Greve Hall with fire rated door. 32" door same as other new doors on first floor. Need this done as soon as possible without rush charge.4/4/20136/11/20136/28/20131D-13496
Greve HallAdditional power outlets needed in Greve Hall 119 at counter height. This room is our materials library and the additional power supply is needed to charge and plug equipment as needed. Kip Thorson @ 974-9132 is our Materials Manager and should considered contact person. Would like to get on Fiscal Year 2013 budget.4/4/20130D-13495
Greve HallCorrect heat and air issue in room 111 Greve Hall.4/15/20130D-13505
Greve HallGreve Hall; install a system that will allow occupants to legally prop open office doors without violating fire code. Two possible solutions were suggested to Bryan Lord: (S13)2/15/20131D-13449
Greve HallCONTINUATION OF D-11080 Greve Hall Renovation Phase 2--Ground floor, second floor, fourth and sixth floors. (LABOR OK)6/13/20130D-13598
Hearing and Speech CenterHearing & Speech Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13268
Henson HallRenovations for Social Work. (CC)5/29/20120D-12515
Hesler Biology Building and GreenhouseRoom 105 Hesler, Split emergency power circuits so each outlet is on a separate circuit.9/24/20125/31/20136/28/20135D-13179
Hesler Biology Building and GreenhouseInstall internal shade cloth in Greenhouses 2, 3, and 4. (MOE)4/21/20116/19/20137/12/20131D-11456
Hesler Biology Building and GreenhouseHesler Biology & Greenhouse - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13269
Hesler Biology Building and GreenhouseRoom 615, insulate ceiling and provide temperature control. (MOE)3/3/20110D-11353
Hess HallHess Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13270
Holt Avenue Apartments Residence HallProgramming for Apartment Residence Hall renovation. (University Residence Hall)12/20/201212/21/20123/1/201310D-13372
Hoskins Library Chiller BuildingHoskins Library Chiller Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13271
Howard H. Baker Jr.Center for Public PolicyReplace flat roof sections of Baker Center. (XYZ)8/22/20121D-13122
Humanities and Social Sciences BuildingInstall ADA ramp at Humanities Plaza and landscape the surrounding areas to include tables w/seating, benches, trash receptacles, bike hoops, lighting, concrete demolition and repairs, landscape plantings, landscape irrigation. (C12)6/13/20127/16/201212/7/201295D-12542
Humanities and Social Sciences BuildingHumanities - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13272
Humanities and Social Sciences BuildingReplace steps and ADA ramp for Lot 9 at South End of Humanities. (NO LABOR) (S13)1/11/20130D-13231
Humanities and Social Sciences Parking GarageG-1 Entrance/exit lane of the McClung Garage. Currently there is not a sidewalk at the entrance to G1. Pedestrians commonly use the vehicles entrance/exit lanes for ease of access (the most direct route to the building where they are going). It is typical for the lower entrance to retain water that the storm drains cannot handle during heavy rain storms & floods. The entrance is located with hills on every side & is at or near the lowest grade level. Recommend solution. Suggestions: repave the ramp so that it slopes toward the drain, install another storm drain so that it can handle the water flow.8/9/20120D-13095
Humes HallHumes Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13273
Humes HallReplace coating on promenade deck that is over basement at Humes Hall. Remove old coating, prior to installing new coating.8/21/20121D-13121
International HouseReplace light fixtures in hallway to match those in room 110 International House. (See Rick Caldwell for lighting specifications)5/15/20135D-13555
International HouseCarpet room 112 International House (same as used for D-13204).6/4/20130D-13573
International HouseCarpet 203, 206-208, 213, & 215 International House using the same carpet that was used on D-13236. Please breakdown by room.6/4/20130D-13574
International HouseReplace fan shrouds, or replace fans damaged in hail storm on 4/27/11 at International House.7/31/20120D-13021
James A. Haslam II Business BuildingJames A Haslam II Business Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13274
James A. Haslam II Business BuildingJames A Haslam Business Bldg. rm. 442: Remove existing upper and lower cabinets. Repair/repaint was as needed. Repair/replace carpet as needed. Relocate electrical outlets and data ports lower on wall. Install work station furniture (provided by department). Designer familiar with this type furniture will be needed. Contact Bryan Hopkins @ 246-8506 to arrange inspection of area.4/16/20135/8/201390D-13506
James D Hoskins LibraryJames D Hoskins Library - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13275
Jane and David Bailey Education ComplexPaint room 315 Bailey Ed Complex. Move faculty office from 315 BEC to 325 BEC and move faculty from 325 to another office in BEC (office to be determined). Needs to be completed by June 1, 2013.5/7/20131D-13538
Jane and David Bailey Education ComplexJ & D BEC - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13276
Jessie W. Harris BuildingInstall new carpet and paint all walls and window ledges in 220C in Jessie Harris.6/6/20130D-13581
Jessie W. Harris BuildingRenovations of suite office space in 230.3/16/20113/25/20136/30/201370D-11390
Jessie W. Harris BuildingTwo entrances in space 301D/344. Install multiple emergency power outlets to support up to 6 minus 80 freezers. Enlarge doorway to accommodate freezers size. Install portable air conditioning unit to help keep the space cool. (C12)6/1/201212/17/20126/25/201390D-12525
Jessie W. Harris BuildingJHB rm 329--remove roll out window; replace HVAC unit with window unit; paint walls; wash & wax floor. JHB rm 337--replace lighting (upgrade); remove cabinet on wall by window & repair wall; repair heating & AC unit in ceiling; replace windows/reinstall window AC unit if necessary; remove piping in ceiling and blower connected to the window; paint walls; wash & wax floors. Need for new incoming faculty person. (S13)12/17/20123/22/20136/30/201350D-13342
Jessie W. Harris BuildingNew lock for JHB 402 door and an access between 402 & 401 closed in wall built where there had been a wall before passed book shelves, light switch and next to the lockers. (SFMO)9/27/201195D-12138
Jessie W. Harris BuildingRepair floors in the animal facility at Jessie Harris. Wash and repaint the floor in the dirty side cage. The flooring was cited in our latest IACUC inspection. It should be noted that our Accreditation site visit from AAALAS takes place this coming Summer, and should be given quick attention. (S13)2/18/20136/24/20137/29/201320D-13453
John C Hodges LibraryJohn C Hodges Library - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13277
John C Hodges LibraryPaint rooms 211, 212, 213, 251, 252, and 253 John C Hodges Library. **Note: MUST BE PAINTED WITH SCUTT MASTER PAINT***4/29/20135/14/20135/17/20131D-13525
John C Hodges LibraryRenovations for converting Hodges Library to 24/7 operation. Add emergency phones at every elevator stop at every floor. Add cameras (see Cpt. Lambert). Add lighting & power for device (laptops, phones, etc) chargers near elevators on each floor. Add security measurers to Volunteer Boulevard entrances (lasers). (S13)7/2/20125/20/20138/30/201315D-13034
John C Hodges LibraryClean the inside & outside of the windows on the 1st & 2nd floors. (S13)12/17/201290D-13352
John C Hodges LibraryRenovations to Galleria at John C Hodges Library.4/26/20130D-13518
John C Hodges LibraryRefinish wooden doors at John C Hodges Library, see list.2/21/20131D-13465
John D. Tickle Engineering BuildingProvide Technology systems for 4 classrooms in the Tickle Building. (S13)7/2/20126/3/20138/16/20130D-13036
John D. Tickle Engineering BuildingTickle Building - move-in to facility after construction. (S13)5/9/20131D-13546
Kappa Sigma Fraternity HouseDesign services for roof replacement - replace roof (Maint) (XYZ)3/21/201170D-11394
Kingston Pike BuildingInstall a second water chiller at the Kingston Pike Building. (S13)5/20/20114/8/201375D-11488
Kingston Pike BuildingRepair or replace carpet in KPB 109 due to extensive wrinkles. Mark Smith of EHS requested work to prevent accident/trip hazard.5/15/20130D-13552
Kingston Pike BuildingInstall a signal wire from the Automatic Transfer Switch for the KPB generator to the KPB Eaton 9395 UPS. This needs to be a "dry contact" type connection to allow the UPS to sense when the input power is being provided by the generator.4/3/20135/27/20136/14/201395D-13493
Kingston Pike BuildingReplace roof on KPB. (Ins) (Cap/Repl) (XYZ)5/1/20121D-12452
Laboratory Animal FacilityLaboratory Animal Facility - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13278
Lake Ave Early Learning Ctr (2nd bldg)Move a playground Gazebo (wooden Structure) from South Doyle High School to the UT Early Learning Center at Lake Avenue. Move cannot take place until the month of June 2013 because in June School will not be in session and children will not be disturbed at South Doyle. We would like the Gazebo moved to 2010/2016 Lake Avenue at the ELC Preschool Playground site. Contact Kathy Kidd for additional information regarding the move and the site it will be moved to. 865-755-20485/8/20130D-13541
Lake Ave Early Learning Ctr (2nd bldg)Security buzzer to all outside doors for ELC which would trigger an ELC personnel to have access. Please look into other options like: key code system or key scan card system. Program card reader. Furnish and install door release for entry to building.8/15/20123/25/20136/21/201395D-13105
Lambda Chi Alpha Fraternity HouseLamda Chi Alpha Fraternity - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13279
Laurel Residence HallLaurel Residence Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13280
Law Complex: George C Taylor WingReplace carpet in room 262 Law Complex George C Taylor Wing.4/23/20131D-13516
Law Complex: George C Taylor WingInstall door to create storage in former telephone booth alcove. (143A)8/17/201210D-13113
Law Complex: George C Taylor WingLaw Complex 158: Mount flat screen panel to wall in conference room. Department has brackets. Must be completed by June 30, 2013.6/6/20130D-13582
Law Complex: George C Taylor WingInstall 3 x 5 back lit board like in Humanities Building under stairway on First Floor of the Law Complex near room 132.6/3/20130D-13572
Law Complex: George C Taylor WingInstall projectors in 12, 237, 338 & 403 Law Complex. Itemized list of necessary actions attached.5/22/20130D-13558
Law Complex: George C Taylor WingRelocate cabinets/serving area in Faculty Lounge directly across room 262 against the wall. Also run wiring to install ceiling projector for use in forums, presentations, etc. Needs to be charged in this fiscal year.4/26/201295D-12424
Law Complex: George C Taylor WingLaw Complex: George C Talor Wing - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13281
Law Complex: Law Library and Classroom AdditionLaw Complex 312, 312, 314: paint study rooms. Work cannot begin until after May10 and must be completed by end of fiscal year.4/26/20131D-13520
Law Complex: Law Library and Classroom AdditionLaw Complex: Law Library & Classroom Addition - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13282
Law Complex: Law Library and Classroom AdditionReplace carpet in second floor Law Library space (excluding individual offices) at the Law Complex.5/1/20136/4/20137/12/20131D-13528
Law Complex: Law Library and Classroom AdditionReplace carpet in the first floor Libray wing and stairs to second floor (excluding individual offices) at the Law Complex.5/1/20136/4/20136/28/201360D-13529
Law Complex: Law Library and Classroom AdditionReplace carpet in 222 & 233 Techincal Services Department of the Law Library.5/30/20131D-13568
Law Complex: Law Library and Classroom AdditionLaw Complex 21, 22, 23, & 24: paint study room. Work cannot begin until after May 10 and must be completed in this fiscal year.4/26/20131D-13521
Law Complex: Law Library and Classroom AdditionLaw Complex room 205, 206, 207: Paint study rooms. Must be done After exams (After May10) but before end of fiscal year.4/26/20131D-13519
Lindsey Nelson StadiumLindsey Nelson Stadium - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13283
Lindsey Nelson StadiumRepair or replace field lighting damaged in hail storm on 4/27/11 at Lindsey Nelson Stadium. (S13)9/11/20125D-13023
Lindsey Nelson StadiumElectric Shop to install magnets on numerous doors at Lindsey Nelson Baseball Stadium as soon as possible. (S13)3/19/201211/12/20127/12/201390D-12378
Massey HallMassey Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13284
McClung Tower and PlazaRenovate office in McClung Tower for Department of English.6/17/20130D-13601
McClung Tower and PlazaClean blinds in room 912 McClung Tower.2/15/20130D-13452
McClung Tower and PlazaReplace carpet in room 406 McClung Tower.5/8/20130D-13544
McClung Tower and PlazaInstall new carpet and paint the walls in room 1004 McClung Tower.5/9/20130D-13547
McClung Tower and PlazaMcClung Tower - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13286
McCord HallRenovations to suite 201 in McCord Hall for UTIA IT Department. Refer to attachments for the detailed project description and floor plans drawing.12/14/20121D-13351
McCord HallReplace roof at McCord Hall. (Ins) (Cap/Repl) (Replace east tile, review west tile) (XYZ)5/1/20121D-12453
Middlebrook BuildingRoom 119 Middlebrook, Demolition(plan), new walls, doors & side lites, revised HVAC (plans & description provided), revised sprinklers (TBC coverage) new ceiling & relocation of light fixtures, new if required; paint & patch & provide new carpet where required.11/20/20120D-13331
Middlebrook BuildingMiddlebrook Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13288
Min H. Kao Electrical Engineering & Computer ScienceActivate volcard swipe access for room 336, 337, 339 Min Kao Senior Design Labs. Spare electrical locks are available.1/30/20135/27/20136/28/20130D-13416
Min H. Kao Electrical Engineering & Computer ScienceReplace windows in rooms 310, 313 and 346 with open able, lockable windows to allow roof access.8/22/20121D-13133
Min H. Kao Electrical Engineering & Computer ScienceAdd swipe locks to the following room doors with dual access control by CURENT & Police department. Hallway doors in Min Kao rooms 101, 107, 121A, 121B, 124 (2 doors), 125, 402, 411,412, 530, 531, 532, 533, 554. & 555. Access additions & removal of personnel to these rooms will be directly CURENT for safety reasons.5/9/20130D-13548
Min H. Kao Electrical Engineering & Computer ScienceMin Kao - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13289
Min H. Kao Electrical Engineering & Computer ScienceConstruct Min Kao loading dock behind Dougherty. (S13)2/13/20124/15/20136/14/201390D-12320
Morgan HallRemove and reinstall Kiosk on the first floor. Prepare walls for monitors. Remove sculptures and hang in new location. Refinish & paint wall where needed.11/9/20100D-11186
Morgan HallMorgan Hall: 201 carpet removal, restoration of underlying floor. 202 remove door opening from hall, leave transom, remove closet door, fix holes in closet(option A) Replace hall door with glass and replace closet with glass, add door to 201. See attachments for further details.6/5/20130D-13577
Morgan HallRemove and dispose of existing carpet in room 229 Morgan Hall. Refinish existing hardwood floors (natural Finish). Paint all walls, baseboards, doors, window and door trim. Request completion by July 1, 2013. Remove existing office landscape partitions. Room 229 will be vacated on May 14, 2013.5/10/20130D-13550
Morgan HallReplace roof on Morgan Hall. (Ins) (Cap/Repl) (Review tile) (XYZ)5/1/20121D-12454
Morrill HallMorrill Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13290
Music CenterMusic Building - move-in to facility after construction. (S13)3/14/20135D-13478
Music CenterFacilities Services to assist with Band Uniform Storage Conveyor System and for installing Theatrical Lighting for Recital Hall in the Music Building. (S13)5/16/20135/30/20137/19/201390D-13556
Music CenterProvide technology systems for 9 classrooms in the Music Building. (S13)7/2/20124/11/20138/16/201310D-13035
Neyland-Thompson Sports CenterNeyland-Thompson Sports Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13291
Nielsen Physics BuildingNielsen Physics Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13292
Nielsen Physics BuildingRenovate lab space in 506 & 507 Nielsen Physics into office space for Graduate Research Assistant`s research work and Study Area. Provide layout, office landscape partitions, electrical and network connections. This work has to be coordinated with establishing astronomy laboratory in Nielsen 108 in connection with the planetarium project. (SERFHOODS) (CC) (S13)11/29/20120D-13333
OFF CAMPUSMake and install a double sided 4` x 8` sign with black metal posts to be erected at ETREC - Blount Unit on Singleton Station Road.6/12/20130D-13588
Outdoor Tennis Center BuildingOutdoor Tennis Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13293
Panhellenic BuildingReplace roof at Panhellenic. (Ins) (XYZ)5/1/20121D-12455
Pasqua Nuclear Engineering BuildingRepair electrical system in room 105 Pasqua Nuclear Engineering.1/10/20135/13/20136/28/20131D-13390
Pediatric Language ClinicPaint the exterior of Pediatric Language Clinic. Scrape and paint railing on front porch. Replace/repair missing brick on deck.4/4/20131D-13497
Perkins HallReplace roof at Perkins Hall. (Ins) (Cap/Rpl) (Ck Tile) (XYZ)5/1/20121D-12456
Philander P. Claxton Education BuildingRenovations to Philander P Claxton 206 for NIMBios.3/5/20131D-13473
Philander P. Claxton Education BuildingReplace roof at Philander Claxton. (Ins) (Cap/Rpl) (Ck Tile) (XYZ)5/1/20121D-12457
Pi Kappa Phi Fraternity HousePi Kappa Phi Fraternity - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13294
Plant Biotechnology BuildingReplace window awnings damaged in hail storm on 4/27/11 at Plant Biotech.7/2/20120D-13012
Plant Biotechnology BuildingHave generator backup outlets installed in rooms: PBB 117(#2, 110V), PBB 363 (220V & 110V), PBB 367 (#2 110V), PBB 402 (#2 110V), PBB 419 (220V)1/23/20135/20/20136/28/20130D-13408
Plant Biotechnology BuildingInstall a card swipe system to deparmental off PBB 370 for the purpose of monitoring activities after hours.1/14/20135/20/20136/28/20130D-13398
Plant Biotechnology BuildingPlant Biotechnology Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13295
Pratt PavilionRepair or replace window flashing & lightning rods damaged in storms on 4/25/11 & 4/27/11 at Pratt Pavilion.9/11/20121D-13013
Presidential CourtReplace roof on Presidential Court. (XYZ) (Crisis)3/1/20131D-13470
Presidential CourtInstall 12 wireless access points on the second floor of Presidential Court. Need conduit run from access point locations on the second floor to the SER on first Floor room 112.6/13/20131D-13595
Presidential CourtReplace the roof and the Stepping Stone system in the Plaza/Bakery at Presidential Court.4/8/20131D-13499
Presidential CourtInstall 1" conduit through the exterior wall on the 3rd floor of Reese & Humes onto the roof and ending at the center of the building facing the courtyard. 1" conduit from hatch in the breezway of North & South Carrick to the side of buidling facing the courtyard.6/13/20130D-13596
Presidential CourtPrisidential Court - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13296
Publications and Services BuildingReplace metal roof damaged in hail storm on 4/27/11 at Publications & Services. (Ins)7/2/20120D-13028
Racheff ResearchRenovations including back-up generator for non-life safety process use and HVAC controls. (S13)8/1/20112/11/201310/18/20135D-12059
Radiological Safety - Old Cherokee TrailRadiological Safety - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13297
Reese HallReese Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13298
Reese Hall ChillerReese Hall Chiller - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13299
Regal Soccer StadiumReplace metal roofs damaged in hail storm on 4/27/11 at Regal Soccer Stadium. (Ins)7/2/20120D-13029
Science and Engineering BuildingInstall two fume hoods in room 603 SERF. (CC) (SERFHOODS) (S13)1/23/20123/15/20134/16/201350D-12289
Science and Engineering BuildingInvestigate feasibility of installing two 8 foot hoods in room 518 SERF. (CC) (SERFHOODS) (S13)1/23/20127/26/20139/16/20130D-12288
Science and Engineering BuildingInstall fume hood in 606 SERF. (CC) (SERFHOODS) (S13)1/23/20123/20/20134/26/20131D-12291
Science and Engineering BuildingInstall two fume hoods in 536 SERF. (CC) (SERFHOODS) (S13)1/23/20124/29/20138/5/20135D-12292
Science and Engineering BuildingInstall three fume hoods in room 218 SERF. (CC) (SERFHOODS) (S13)1/23/20124/10/20135/16/201390D-12293
Science and Engineering BuildingRenovation of lab 718 at SERF. (SFMO) (S13)6/27/20117/9/201212/1/201295D-11539
Science and Engineering BuildingRepairs for 4th floor entrance skylight at SERF. (Crisis) (CC) (S13)5/1/20121D-12444
Science and Engineering BuildingInstall fume hoods in room 312 SERF. (CC) (SERFHOODS) (S13)1/26/20122/13/20135/16/201350D-12296
Science and Engineering BuildingSERF 439: move & install portions of a cubicle wall and door. Move compressed air tank wall-support-bar from one sidewall to another.6/12/20130D-13587
Science and Engineering BuildingInstall blinds on two left windows in lab 617 SERF.5/8/20131D-13539
Science and Engineering BuildingInstall the equipment listed in the attached document on the 6th floor roof of SERF where the solar arrays are currently mounted.6/7/20130D-13583
Science and Engineering BuildingAdd one fume hood to room 702 SERF. (CC) (SERFHOODS) (S13)11/19/20120D-13330
Science and Engineering BuildingSERF 218: Lab renovations, in addition to and not including work for fume hoods. (CC) (SERFHOODS) (S13)8/22/20124/12/20135D-13126
Science and Engineering BuildingSERF 603/604: Lab renovations, in addition to and not including work for fume hoods. (CC) (SERFHOODS) (S13)8/22/20125/20/201310D-13125
Science and Engineering BuildingSERF 606: Lab renovations, in addition to and not including work for fume hoods. (CC) (SERFHOODS) (S13)8/22/20121D-13124
Science and Engineering BuildingSERF 312: Lab renovations, in addition to and not including work for fume hoods. (CC) (SERFHOODS) (S13)8/22/201210/1/20126/5/201310D-13123
Science and Engineering BuildingSERF 210: (1) Install ceiling with noise abatement. (2) Install lighting in new ceiling with dimmer controls. (3) Install projector mount from ceiling. (4) relocate 2 of the electrical outlets to lower wall positions to avoid interference with mounting of white boards.1/23/20133/13/20136/30/201350D-13409
Science and Engineering BuildingBuild a permanent wall that separates the "wedge space" in Serf 538 from the other part of 538. (SERFHOODS) (S13)8/8/20125/6/20136/30/201380D-13092
Science and Engineering BuildingInstall 115v - 20a dedicated circuit with two duplex outlets and one 208V-20A circuit room 626 SERF.7/23/20126/30/20136/30/201320D-13072
Science and Engineering BuildingAdd fire alarm controllers on each floor of SERF to accommodate additional strobes. (CC) (C12) (SERFHOODS) (S13)9/11/201210/15/20126/28/201390D-d-12378
Science and Engineering BuildingSERF - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13300
Senter HallInstall 220V service to room 116 Senter Hall.5/14/20136/10/20136/13/20135D-13551
Shelbourne TowersProgramming for Shelbourne Residence Hall.7/13/20125D-13054
Sherri Parker Lee StadiumReplace metal roofs damaged in hail storm on 4/27/11 at Sherri Parker Lee Stadium. (Ins)7/2/20120D-13030
Sherri Parker Lee Stadium-Team FacilityEnclosure for the Batting Cage at Sherri Parker Lee Stadium.8/16/20121/21/20136/30/201395D-13103
Sigma Alpha Epsilon Fraternity HouseSigma Alpha Epsilon Fraternity - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13301
Sigma Phi Epsilon Fraternity HouseSigma Phi Epsilon Fraternity - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13302
South & East StadiumRoom 445A is going to be used for pediatric audiology testing. Need windows sealed and covered to decrease noise and allow children to sleep if needed for testing.5/23/20130D-13559
South & East StadiumDrilling through walls and wrapping columns for network service for Audiology & Speech Pathology, room 344 South Stadium Hall; acct. no. E07-3740. This is a specific request for preparing Network Services to install ports in room 344 SSH. Please contact Ben Rayfield (brayfie1@utk.edu)(4-6648) for explanation. But here is summary: 9 columns will need to be wrapped with conduit; 11 walls will need to be drilled and sleeved with 4" bushings to gain access to the Service Equipment Rack (SER) that OIT will need access to. OIT has already provided an estimate for the network install costs. If I can assist, please don`t hesitate to contact me. Max Dawson mdawson@utk.edu 4-18034/11/20136/10/20136/28/201310D-13503
South & East StadiumReplace siding & window flashing damaged in hail storm on 4/27/11 at Neyland Stadium West Skybox/Club.9/11/20120D-13027
South & East StadiumRepair or replace field lighting damaged in hail storm on 4/27/11 at Neyland Stadium. (Ins)7/2/20126/10/20138/2/20131D-13022
South & East StadiumWork associated with the DAS (Distributed Antenna System) project. (Wireless communication tower) (S13)5/16/20128/28/20125D-12493
South CollegeReplace copper roofs damaged in hailstorm on 4/27/11 at South College. Remove both roofs and return to original roof. (Ins)7/2/20121D-13010
Stadium Drive Parking Garage-G10Green Project - Evaluate installation of Photovoltaic system on G-10 garage. (Stadium Drive Parking Garage) (SI)3/27/20130D-13486
Steam PlantSteam Plant - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13303
Stokely Management CenterReplace doors from basement to vestibule between G2 & G4 SMC. Replace doors from plaza to G2. Also includes handrail replacement around area wells. (S13)2/19/20130D-13455
Stokely Management CenterStokely Management Center Renovations for rooms; 708, 708A, and 709. Please see attached for more detail.11/7/20120D-13318
Stokely Management CenterSMC 701: Remove risers from table tops Refinish or replace table tops as needed. Relocate power to underneath tables Remove data ports (disposition to be determined), except for designated ports to be kept Renovate lighting to include dimming capability w/switch or sensors at both entrances Protect carpet during work Repair repaint walls as needed12/17/20123/13/20136/30/201380D-13348
Stokely Management CenterInstall a signal wire from the Automatic Transfer Switch for the SMC generator to the SMC Eaton 9395 UPS. This needs to be a "dry contact" type connection to allow the UPS to sense when the input power is being provided by the generator.4/3/20135/27/20136/28/201370D-13492
Stokely Management CenterReplace Fire Alarm System. (FACPL) (ADA) (No labor) (S13)9/30/20116/11/20127/31/201350D-12149
Stokely Management CenterRun conduit at SMC for a camera on the roof to monitor the UC project. We will need @ 120ft of 1" conduit on the roof from ther penthouse: a 1" sleeve from the 7th floor mechanical room down to the 6th floor; a 1" conduit from the 6th floor mechanical room to the soft ceiling on the 6th floor.5/30/20130D-13569
Stokely Management CenterSMC 3rd floor. UT Sign Shop to purchase & install room number signs (47 small, 45 large) with apppropriate ADA compliant number for all rooms. Signs to be sprayed to match metal finish of new floor furnishings. Details of sign order e-mailed to Steve Moyers in the Sign Shop.5/30/20131D-13570
Stokely Management CenterStokely Management Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13304
Stokely Management CenterSMC 334A: move existing power outlets from current location on walls to 44" from floor to accommodate new furniture installation. 339A- add 2 power outlets at 44" on wall that is common with 334A. Furniture installation is scheduled for July 1, 2013. Wourk would need to be completed prior to install.6/17/20130D-13603
Stokely Management CenterConnect pigtails to NOI furniture/cubicle installation. Area is located outside 305 SMC in the former 306a area. Unformtunately the pigtails cannot be delivered prior to installation, which is scheduled to begin on 7/1/13. NOI suggests that electricians be scheduled for 7/2/13 to connect pigtails. Layout of furniture installation is atta contact Jennifer hichs with questions.6/17/20130D-13599
Stokely Management CenterRelocate electrical outlets from post in floor to wall in rooms 332 & 333 SMC. Move data ports as needed and patch carpet in both rooms.6/17/20130D-13602
Student Aquatic CenterStudent Aquatic Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13305
Student Health ClinicH/C access and a "doorbell" need to be installed on the right hand door of the main entrance to 201 Student Health. Ken needs to meet with someone on location to discuss specifics before estimate is prepared as there are several options on how/where to locate the "bell". Devices also need "on/off" switches and should be invisible from the main entry door to 201. The best option can be determined when we meet on-site.5/8/20130D-13543
Student Recreational and Fitness CenterPlace a bollard at each end of the walkway between the outdoor paddleball courts and the RecSports fields to prevent motorized vehicular access/traffic.5/3/20130D-13535
Student Recreational and Fitness CenterReplace all field lights that are out on the RecSports Turf Field adjacent to the TRECS facility. There are 12 out when last checked however we would like any that are currently out repair/replaced. RecSports has some ballasts and bulbs on hand however we place an order last budget year through FS that has not arrived as of yet. Please contact Randy nicely to obtain the bulbs and ballasts that we have on hand in the TRECS facility.11/8/20126/10/20137/22/20131D-13321
Student Recreational and Fitness CenterTRECS - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13307
Student Services BuildingProvide electrical connection to power frommet and add overflow raceway wire cover to conference table for computer use in 111A Student Services Building. New conference table will be delivered May 16, 2013. We need to have ther work completed before the end of the current fiscal year (before June 30).5/2/20130D-13530
Student Services BuildingSSB - remove 407C & D cubicles; remove old & build new wall indicted between 409A & 409B1; remove old & build new wall indicted between 409A & 407; remove glass hallway window in 407 & replace with wall; add door so conference room 409B7 can also be accessed from 412A as indicted on attachment. New Conference Room 409A will need repainted & recarpeted to match 409.12/18/20125/22/20138/2/201315D-13369
Student Services BuildingStudent Services Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13308
Student Services BuildingLower 2 cashier counters to desk height in room 211 Student Services Building.4/22/20130D-13513
Student Services BuildingSSB 211: replace all the desktops with ergonomic desktops.4/22/20130D-13514
Student Services BuildingInstall power to the new modular furniture in room 111 Student Services Buildling. The furniture is expected to arrive on Thursday, May 16, 2013.5/8/20130D-13545
TANDEC--Textiles and Nonwovens Development CenterTANDEC - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13309
Thompson-Boling Assembly Center and ArenaProvide ventilation in TV equipment room. (SFMO)12/30/20080D-09205
Thompson-Boling Assembly Center and ArenaPlease update 2 maglocks at the Business Office area at TBA and one push button release switch at the arena.8/17/201212/4/201212/31/201295D-13114
Thompson-Boling Assembly Center and ArenaBlanket: Miscellaneous work as needed (FY 2012-2013)7/1/20127/1/20126/30/201390D-13003
Thornton Athletics Student Life CenterThornton Athletics Student Life Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13310
Thornton Athletics Student Life CenterInstall system to eliminate moisture for sunken slab area at main entrance of Thornton Athletics. (S13)3/28/20130D-13472
Tom Black Track Facilities BuildingReplace metal roof damaged in hail storm on 4/27/11 At Tom Black Track. (Ins)7/2/20120D-13031
Tom Black Track Facilities BuildingRepair or replace field lighting damaged in hail storm on 4/27/11 at Tom Black Track.9/11/20125/13/20136/30/201380D-13026
Tyson Alumni CenterInstall 4 new sconce lights, 1 new chandelier, 2 new display lights on the Landing at Tyson Alumni Center. Patch the walls and paint 2nd floor landing.2/12/20130D-13431
Ula Love Doughty Carousel TheatreCap the roof of Ula Love Doughty Carousel Theatre. (Ins) (Cap/Repl) (XYZ)4/3/20130D-13491
UT Welcome CenterReplace roof at Welcome Center. (Ins) (Cap/Rpl) (XYZ)5/1/20121D-12459
UT Welcome CenterNeed the mag lock box on the main exterior doors moved over to have each door individually monitored so that the vertical rod that locks the door can be repair and installed at the UT Welcome Center. This is an immediate need, as we currently cannot lock the front door of the building.4/26/20130D-13522
Veterinary Teaching HospitalVeterinary Teaching Hospital - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13311
Volunteer HallVolunteer Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13312
Walters Life Sciences BuildingWLS D402: Install 115v-20a dedicated emergency power outlet to left of door.6/3/20130D-13571
Walters Life Sciences BuildingPaint rooms E412/E414 in Walter Life Sciences.6/10/20130D-13585
Walters Life Sciences BuildingPaint room F423 Walters Life Sciences.6/10/20130D-13586
Walters Life Sciences BuildingWalters Life Sciences Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13313
Walters Life Sciences BuildingProgramming for Walters Life Sciences.7/13/20125D-13053
West Skybox AdditionWest Skybox Addition - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/20121D-13314



 