Current Summer Projects (2014):

 

BUILDINGDESCRIPTIONDATE APPROVEDSCHED TO BEGINSCHED TO COMPLETE% COMPLETEPROJECT NUMBER
Alumni Memorial BuildingInstall Audio/Video Only in Cox Auditorium at AMB. (S14)3/31/145/7/148/25/1440D-14381
Alumni Memorial BuildingAMB room 32: Audio/Video ONLY (S14)3/31/145/7/148/25/1440D-14383
Alumni Memorial BuildingAMB room 27: New White Board (S14)3/31/145/7/148/25/1440D-14389
Alumni Memorial BuildingAMB room 210: Audio/Video ONLY. (S14)3/31/145/7/148/25/1440D-14382
Andy Holt TowerExterior masonry repair to Andy Holt Tower. (S14)12/1/113/1/138/31/1470S-12001
Austin Peay BuildingUpgrades to Seminar Room 308 at Austin Peay. (S14) NEW PROJECT 7/1/14 D-150493/31/145/7/148/25/1460D-14391
Biosystems Engineering and Soil Science Labs BuildingReplace roofs damaged in hailstorm on 4/27/11 at BEES Office Building. (BU and tile) (Ins) (Cap/Repl BU) (XYZ) (C13) (S14)7/2/1285D-13016
BoathouseReplace storm damaged metal roof on the Boathouse. (XYZ) (S14)10/18/131D-14197
Communications and University Extension BuildingPlaza roof replacement at Communictions/Student Services (XYZ) (Crisis) (C13) (S14)11/20/131D-14224
Communications and University Extension BuildingCONTINUATION OF D-14191: Renovations to room 260/261/262 Communications. See attachments! ***Eliminate accordian door, base cabinet, and accompanying design*** (S14)6/30/143/17/146/15/1480D-15095
Dougherty Engineering BuildingCONTINUATION OF D-14262 :Disconnect the equipment in room 103b Dougherty, 14 disconnects. Reconnect after equipment is moved to 106M. 5 pieces. Move marked equipment to fireproof storage. Remaining equipment foes to surplus. Third Attempt. (S14)6/27/1412/27/136/30/1490D-15088
Dougherty Engineering BuildingDougherty Engineering - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (S14) NEW PROJECT 7/1/14 D-1506511/2/123/31/148/31/141D-13262
Early Learning CenterReplace storm damaged metal roof on ELC 2010 Lake Avenue. (XYZ) (S14)10/18/1390D-14196
ETREC Johnson Animal Research BuildingMetal roof replacement at ETREC Johnson Animal Research Building. (XYZ) (S14)5/22/141D-14440
Ferris HallClassroom Upgrade 2014 - Ferris Hall 511 (S14)3/31/145/7/148/25/1460D-14376
Health, Physical Education, and Recreation BuildingCONTINUATION OF D-14125 : Renovations to room 113 HPER for Theatre. (S14)6/27/141/15/1496D-15091
John C Hodges LibraryContinuation of D-13277: John C Hodges Library - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (C13) (S14)7/1/147/1/148/8/1490D-15147
Law Complex: George C Taylor WingReplace carpet in classroom 132 Law Complex. Work cannot begin until summer classes end in late July, 2014 and must be completed by Auagust 13, 2014. (S14)11/8/137/10/148/7/1475D-14215
Lindsey Nelson StadiumLindsey Nelson Stadium - Repair/Replace/Recover the Built-up roof and metal roof due to Storm Damage of April 2011 (XYZ) (S14)11/2/124/15/148/30/141D-13283
McClung Tower and PlazaBuild one set of wooden mailboxes to match existing mailboxes in 316 McClung Tower. (S14)5/23/147/14/148/22/140D-14444
Min H. Kao Electrical Engineering & Computer ScienceAdd cooling water for electrical experiments to be used by researchers in room 101, 117, 117A, 117B and 125 Min Kao. Each room shall have a minimum of 1 outlet and 1 inlet controlled via ball valves. Water temperature is not an issue by condensation on pipes should be minimized. The total load will be 50KW or less. Any attached research equipment may use fast acting water valves. Dan Smith has further info. (S14)6/21/137/14/149/12/1420D-13614
Natalie L. Haslam Music CenterMusic Center Installation of 10 New Glass Boards. (S14) NEW PROJECT 7/1/14 D-150473/31/145/7/148/25/140D-14386
Nielsen Physics BuildingNielsen Physics room 304: Audio/Video ONLY. (S14)3/31/145/7/148/25/1440D-14387
Panhellenic BuildingContinuation of D-12455: Replace roof at Panhellenic. (Ins) (XYZ) (S14)7/1/1490D-15082
Plant Biotechnology BuildingPBB room 113: Audio/Video ONLY. (S14)3/31/145/7/148/25/1440D-14385
Plant Biotechnology BuildingPBB room 160: Audio/Video ONLY. (S14)3/31/145/7/148/25/1440D-14384
Racheff ResearchNew sidewalk needed to connect parking surface outside Racheff GH to new entry. Sidewalk to slope from the edge of the parking lot & connect to the existing slab just outside of the new entrance. Old Entrance is now closed due to GH redesign. Additionally a large slab should be added just past the new entrance for various applications. See Attached Photo`s (2) for details. (S14)2/28/147/28/147/30/140D-14336
Regal Soccer StadiumReplace metal roofs damaged in hail storm on 4/27/11 at Regal Soccer Stadium. (Ins) (XYZ) (S14)7/2/123/17/146/30/140D-13029
Regal Soccer StadiumContinuation of D-13029 : Replace Metal roofs damaged in hail storm on 4/17/11 at Regal Soccer Stadium. (Ins) (XYZ) (S14)7/1/1420D-15079
Student Aquatic CenterCONTINUATION OF D-13305: Student Aquatic Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (C13) (S14)6/25/1411/2/126/23/1490D-15085



Current Open Projects (ALL):

BUILDINGDESCRIPTIONDATE APPROVEDSCHED TO BEGINSCHED TO COMPLETE% COMPLETEPROJECT NUMBER
AG CAMPUSCONTINUATION OF D-12272--Install Lighting for Rugby Field at Fulton Bottoms.7/1/146/17/138/1/1470D-15005
Alumni Memorial BuildingAMB room 27: New White Board (S14)3/31/145/7/148/25/1440D-14389
Alumni Memorial BuildingAMB 138: paint walls a llighter color; no need to consult on the color , clean the carpet see if we can get surplus furniture to help with the needs: 2 desks & desk chairs, 2 desk lamps, 2 4-drawer file cabinets, letter size, 6ft X 3 ft book case; conference table & 8 chairs; couch or side chairs.7/22/140D-15178
Alumni Memorial BuildingAMB room 32: Audio/Video ONLY (S14)3/31/145/7/148/25/1440D-14383
Alumni Memorial BuildingInstall Audio/Video Only in Cox Auditorium at AMB. (S14)3/31/145/7/148/25/1440D-14381
Alumni Memorial BuildingAMB room 210: Audio/Video ONLY. (S14)3/31/145/7/148/25/1440D-14382
Andy Holt TowerAndy Holt Tower - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/121D-13242
Art and Architecture BuildingCONTINUATION OF D-14368 Replace the track lighting with new track lights in A & A 321 along with lights & dimmer. The lights in the front of the room, facing the screen, need to be on a different circuit. Room 443 has lights configured like we want done7/1/147/8/147/25/1490D-15036
Art and Architecture BuildingArt & Architecture Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/121D-13243
Art and Architecture BuildingArt & Architecture 321 please install screen, allowing for small space between window & screen. Would like to have installation done before classes begin in August.7/16/140D-15162
Art and Architecture BuildingReplace existing shades in 321 A & A with black out shades.7/9/140D-15151
Art and Architecture BuildingCONTINUATION OF D-13039--Replacement or possible upgrade for our current swipe card system at 2nd floor bridge stairs, stairs at 1st level atruim; loading dock area. Installing a new swipe card system in the main administratice offce room 224. please cor7/1/1412/2/138/15/1445D-15006
Art and Architecture BuildingCONTINUATION OF D-14380 Instll Audio/Video only in room 113 A & A.7/1/145/7/1480D-15046
Art and Architecture BuildingCONTINUATION OF D-14412--Studio electrical renovations all 3rd and 4th floor studios College of Architecture and Design.7/1/144/17/148/15/145D-15002
Art and Architecture BuildingDownTown Studio: install security upgrades including card enty & possible camera @ 502 South Gay Street, Knoxville, Tn.7/7/140D-15138
Art and Architecture BuildingCONTINUATION OF D-13630 -- Install Cameras in wood shop for safety & security at A & A.7/1/141/13/145/30/1445D-15021
Art and Architecture BuildingCONTINUATION OF D-14378 Classroom Upgrade 2014 - A & A 3257/1/1440D-15044
Art and Architecture BuildingCONTINUATION OF D-13628 -- Create kiosks area on each end of studio floor (3rd & 4th) would include area for small microwave, small fridge, 4 electrical outlets with counter top space, optional small sink area request estimate with and with out sink optio7/1/144/23/148/15/1470D-15020
Art and Architecture BuildingNew electrical panel I drop down Receptacles from track, outlet connectors- rooms 307, 313, 317 @ A & A. Need ASAP6/24/147/14/148/15/145D-15084
Austin Peay BuildingPaint the column in Suite 303 and all door jambs in the 301 & 303 Suites of Austin Peay. In addition, please paint the open area of suite 310 & Suite 416. Connie Ogle will provide color choices. Please include painting rooms 215A, 301C, 303C & 416C. Hoping to pay from this fiscal year 2014.6/4/146/24/147/24/1480D-14462
Austin Peay BuildingUpgrades to Seminar Room 308 at Austin Peay. (S14) NEW PROJECT 7/1/14 D-150493/31/145/7/148/25/1460D-14391
Austin Peay BuildingCONTINUATION OF D-14391 Upgrades to Seminar Room 308 at Austin Peay7/1/145/7/1480D-15049
Austin Peay BuildingMake improvements for ADA route At Austin Peay through building in conjunction with landscaping project. (No Labor) (ADA) MUST BE DONE BEFORE SCHOOL STARTS!!5/8/147/14/148/20/140D-14429
Austin Peay BuildingInstall new carpet in Suite 303 & 306 Austin Peay. Hoping to pay from this fiscal year 2014.6/4/146/30/1440D-14463
Ayres HallAyres Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/121D-13246
Berry HallCONTINUATION OF D-14163 -- Provide emergency lighting and exit signage in Berry Hall. This project will also pick up7/1/142/10/148/30/1490D-15024
Biosystems Engineering and Soil Science Labs BuildingCONTINUATION OF D-13248 Biosystems Engineering & Soil Sci, Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)7/1/1411/2/126/26/1490D-15062
Biosystems Engineering and Soil Science Labs BuildingReplace roofs damaged in hailstorm on 4/27/11 at BEES Office Building. (BU and tile) (Ins) (Cap/Repl BU) (XYZ) (C13) (S14)7/2/1285D-13016
Black Cultural CenterReplace fan shrouds, or replace fans damaged in hailstorm on 4/27/11 at Black Cultural Center.7/31/120D-13017
Blount HallCONTINUATION OF D-13510-- Install glass wall with double doors on the ground floor of Blount Hall. The glass would partially separate A001 form A004. Please see Beth Neilson & Renee Thomas.7/1/144/21/146/13/1460D-15014
Blount HallBlount Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/121D-13249
Blount HallMagnetic door hold open devices connected to fire alarm for various doors in Blount Hall. See Carolyn. Estimate requested by 4/25/14. Please contact Carolyn Underwood In Facilities Services for additional instructions. The doors are located in the lobby area of the 1st floor (two doors on east side & 2 doors on west side of lobby), double doors on ground floor of Blount Hall entering into suite area A008, and double doors on 4th floor of Blount Hall leading into hallway area 499B.5/28/140D-14452
BoathouseReplace storm damaged metal roof on the Boathouse. (XYZ) (S14)10/18/131D-14197
BoathouseBlanket: Maintenance as needed (FY 2012-2013)7/1/127/1/126/30/130D-13008
Brenda Lawson Athletic CenterBrenda Lawson Athletic Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/121D-13250
Brenda Lawson Athletic CenterInstall door security at entrances of Brenda Lawson Center.7/18/140D-15170
Burchfiel Geography BuildingCONTINUATION OF D-13251 Burchfiel Geography Building Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)7/1/143/31/148/31/145D-15063
CAMPUSGreen Project - Install flash tanks to trap high pressure traps to low side of building systems, allowing venting to low side steam system, and trappping then to condensate receivers.1/11/1311/18/136/30/150D-13393
CAMPUSBlanket: Campus Beautification (FY 2012-2013)7/1/127/1/126/30/130D-13005
CAMPUSCONTINUATION OF D-14176: Housing Master Plan for Presidential Court Complex.7/1/140D-15118
CAMPUSCONTINUATION OF D-13593 -- Replace transformers @ Perkins Hall, Andy Holt Tower, Communications, Humanities & McClung Tower. (CHANCELLOR-NR11) (CC) (S13)7/1/140D-15018
CAMPUSRepairs to roofs due to Storm Damage of April 2011.3/21/140D-14365
CAMPUSVol Condos - 22nd street, run conduit for wireless access points.7/7/147/22/147/25/140D-15127
CAMPUSCONTINUATION OF D-14054 -- Campus Building Security Upgrade7/1/147/22/136/27/145D-15022
CAMPUSCONTINUATION OF D-13395 -- Green Project - Reinsulate Steam Lines (2014-2015) (year 3 of 5)7/1/149/2/148/24/140D-15013
CAMPUSBlanket: Disabilities Accommodations (FY 2012-2013)7/1/127/1/126/30/1310D-13002
CAMPUSBlanket - general maintenance in classrooms to include replacing markers, erasers, seating repairs, painting, etc. (FY13)1/29/1350D-13410
CAMPUSCONTINUATION OF PROJECT D-14202: Project for Bid on Metal roof damage storm of 2011 to include Project D-13209 Regal Soccer, D-13030 Sherri Lee Parker Stadium, D-14197 Boathouse, D-14196 ELC-2010 Lake Avenue, D-13283 Lindsey Nelson.6/30/140D-15097
CAMPUSPeyton Manning Pass-Yearly Touch up of Checker Board.7/7/140D-15124
CAMPUSBlanket: Misc. Conduit, raceways & other wiring for Network Services -Tech Fee (FY 2012-2013)7/1/127/1/126/30/130D-13004
CAMPUSCONTINUATION OF D-13621 -- Green Project - Exterior Lighting Upgrades - Building Mounted.7/1/1411/4/1312/31/140D-15019
CAMPUSSKF Laser Training6/20/148/18/148/22/140D-15080
CAMPUSBlanket - Annual maintenance for water bottle filling fountains only. (FY1013 and FY 2014)1/11/130D-13392
CAMPUSCONTINUATION OF D-13565 -- Installation of electric, water and condensate metering in academic, reaseardh & administration buildings. (Chancellor-NR11) (CC) (S13)7/1/147/1/136/30/141D-15017
CAMPUSCONTINUATION OF D-13626 GREEN PROJECT - MOG Education, Publicity & Support - Year 10 (2014-2015)7/1/145/19/145/23/140D-15057
CAMPUS (Student Health)Continuation of D-10186: Facilities Services support for Student Health. (FACPL) (LABOR OK)7/1/147/15/1396D-15099
CAMPUS-Green ProjectCONTINUATION OF D-13396 Green Project - Low flow plumbing fixtures. (2014-2015) (year 3 of 5)7/1/140D-15075
CAMPUS-Green ProjectCONTINUATION OF D-13394 Green Project- Install water bottle filling stations. (2014-2015)7/1/149/30/136/30/140D-15074
Carrick Hall NorthCONTINUATION OF D-14360 -- Carrick Hall N & S : basement abatement & repairs.7/1/143/19/148/1/1470D-15029
CHEROKEE FARMSCONTINUATION OF D-14363 -- Eradicate fire ants at Cherokee Farms7/1/143/21/146/25/1430D-15032
Clarence Brown Theatrecontinuation of D-13459 : Provide fire protection system for stage area and proscenium including fire separation curtain and re-initiation of deluge system at Clarence Brown Theatre. (CC)7/1/142/20/136/30/140D-15148
Clarence Brown TheatreUpgrade stage lift controls at Clarence Brown Theatre.10/7/131D-14185
College of NursingCollege of Nursing - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/121D-13257
College of NursingCollege of Nursing Cap off the sink and finish the wall to make it an office in room 244.7/21/140D-15176
Communications and University Extension BuildingCONTINUATION OF D-13554 -- Redesign 4th floor lobby outside of the School of Information Sciences offices, Suite 451. Per designs by Keith Downen & team finalized 12/12/12.7/1/143/10/148/1/1495D-15016
Communications and University Extension BuildingContinuation of D-12366 -- Build enclosed space(s) on third floor patio area at Communications.4/17/140D-14410
Communications and University Extension BuildingCONTINUATION OF D-14191: Renovations to room 260/261/262 Communications. See attachments! ***Eliminate accordian door, base cabinet, and accompanying design*** (S14)6/30/143/17/146/15/1480D-15095
Communications and University Extension BuildingCommunications - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/121D-13258
Communications and University Extension BuildingInstall acoustical ceiling to reduce noise in the CCI 3rd floor lobby Communications.7/11/140D-15157
Communications and University Extension BuildingPlaza roof replacement at Communictions/Student Services (XYZ) (Crisis) (C13) (S14)11/20/131D-14224
Communications and University Extension BuildingHave oval shaped area created with cork flooring to the threshold doorway of 10 offices in suite 451 Communications. Also 3 office doors need to have vents added to the bottom to the facilitate better air flow in the office suite.7/16/140D-15164
Communications and University Extension BuildingCONTINUATION OF D-14456: Radio Center-WUOT wishes to empty auxiliary broadcast site at Channel 10 preparatory to installing a new transmitter. Need Res Brooks & Tim Tomlinson to assess the sire for needed electrical work in shutting down existing equipment & setting up for replacement.6/30/147/1/147/31/1440D-15096
Conference Center BuildingPaint the walls and install carpet in room 231D Conference Center Building.7/7/1490D-15130
Conference Center BuildingBlanket: Miscellaneous work as needed (FY 2012-2013)7/1/127/1/126/30/1310D-13001
Conference Center BuildingSelective Painting and carpet installation in room 231D CCB. Approved up to $10,000 only.6/13/140D-15076
Conference Center BuildingCONTINUATION OF D-13128--Replace damaged concrete sidewalk around the exterior perimeter of the Conference Center to match existing exposed aggregate concrete.7/1/146/9/148/15/1480D-15007
Conference Center BuildingInstall new carpet per estimate T-11129 in 212 CCB. Furniture Vendor will be handling removal & installation of furniture.5/15/140D-14430
Dabney-Buehler HallCONTINUATION OF D-13260 Dabney Buehler Hall Repair/Replace/Recover the Built-up roof due to Storm Damage of Aril 2011 (XYZ)7/1/143/31/148/31/1495D-15064
Dabney-Buehler HallCONTINUATION OF D-14372 Classroom Upgrade 2014 - Buehler Hall 4127/1/145/7/148/25/1480D-15038
Dabney-Buehler HallFume hood changes, 2nd floor of Buehler Hall: All of the work included in this PP28 relates to changes being made in research labs, in order to provide laboratory space for a new faculty member who starts 8/1/13. 1. Remove old existing 3-ft hood in Room 204C. Replace that hood with a similarly-sized ventilated cabinet. 2. Install a new 6-ft fume hood in Room 214A, which will tie in to the same 8-in fume hood trunk line as the cabinet in 204C. 3. Remove old existing 6-ft fume hood in Room 211. 4. Move newer existing 8-ft fume hood from Room 210 to replace the old hood in Room 211. (C13)9/12/135D-14150
Dabney-Buehler HallAdd automatic openers at 4th floor entrance to Buehler. (ADA) (No Labor)4/17/140D-14411
Dabney-Buehler HallPlease install new 120v, 20A circuit, terminating with a standard surface-mount duplex receptacle in 232 Dabney Buehler. Location to be indicated by Bill Gurley or Chemistry Business Office personnel.7/17/140D-15167
Dabney-Buehler HallFume hood changes, 2nd floor of Buehler Hall: All of the work included in this PP28 relates to changes being made in research labs, in order to provide laboratory space for a new faculty member who starts 8/1/13. 1. Remove old existing 3-ft hood in Room 204C. Replace that hood with a similarly-sized ventilated cabinet. 2. Install a new 6-ft fume hood in Room 214A, which will tie in to the same 8-in fume hood trunk line as the cabinet in 204C. 3. Remove old existing 6-ft fume hood in Room 211. 4. Move newer existing 8-ft fume hood from Room 210 to replace the old hood in Room 211. (C13) NEW PROJECT 7/1/14 D-150519/12/130D-14149
Dougherty Engineering BuildingMABE Machine Shop, Room 102 Reconfigure (relocating various Machine tools), clean up, paint & forklift truck access to DO hallways & elevator. Add fume hood. Add electrical & other service connections for equipment in Prototyping Lab, rm. 110 and as necessary for equip to be reconfigured in room 102. see attached for more details4/4/140D-14399
Dougherty Engineering BuildingDougherty Engineering - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (S14) NEW PROJECT 7/1/14 D-1506511/2/123/31/148/31/141D-13262
Dougherty Engineering BuildingDougherty 323 B & C paint & carpet .7/7/140D-15146
Dougherty Engineering BuildingPaint wall and install carpet (framing built on wall needs to be removed as well) Dr. Mench would like for this work t be done by August 1, 2014.6/27/140D-15089
Dougherty Engineering BuildingCONTINUATION OF D-14262 :Disconnect the equipment in room 103b Dougherty, 14 disconnects. Reconnect after equipment is moved to 106M. 5 pieces. Move marked equipment to fireproof storage. Remaining equipment foes to surplus. Third Attempt. (S14)6/27/1412/27/136/30/1490D-15088
Dougherty Engineering BuildingMABE room 110 will be converted to Welding Lab. Clean & prep floor for new equipment. Add electrical & other service connections for new welding equip. Add fume Hood. Add localized vent system for various welding stations.4/4/140D-14398
Dougherty Engineering BuildingPaint Dougherty 409/409A conference room.7/11/140D-15158
Dougherty Engineering BuildingDO 306 is a main hallway door that leads to 2 separate office--306C & 306D. Work to be completed--remove mail hallway door to 306 to leave an opening going into smaller hallway for offices 306C & 306D.--Paint inner hallway of 306--Carpet 306C7/7/140D-15134
Dougherty Engineering Building6 Plaques to be installed: one in the 4th floor hallway outside room 419; It will house monitor/computer-electrical work needed (AC outlet & network circuit). Another hang inside room 419 above the sofatable. 3 are going in room 422 (1-mission & 2 awards). The remaing plaque needs to be installed outside room 314.7/9/140D-15150
Early Learning Centerin room 105 (middle room/gym) located in the Lake Ave ELC, we would like the flooring, including the carpet & tile at the entry way, removed and replace with tile.4/4/140D-14400
Early Learning CenterReplace storm damaged metal roof on ELC 2010 Lake Avenue. (XYZ) (S14)10/18/1390D-14196
Early Learning Center - Research & PracticeELC upstairs bathroom the only adult bathroom in the building, needs new paint & tile. We would like a light blue color for paint and gray collor for tile. The downstairs bathroom is also being done and chose similar colors for Paint & tile.5/16/140D-14435
Early Learning Center - Research & PracticeReplace built-up roof, windows, and masonry repairs at ELC-1206 White Avenue. (XYZ)5/1/121D-12460
Early Learning Center - Research & PracticeRemove current flooring in basement level classroom and support space at base of steps. Repair floor, making sure remaining surface is level and in good condition to support tiles. Install tile flooring in classroom & support space.7/7/147/31/148/11/141D-15131
Earth and Planetary Sciences BuildingCONTINUATION OF D-14287 Replace roof & air handler serving classroom 302 EPS. (Crisis) (CC) (replaces M12100)7/1/145/19/148/22/1460D-15073
Ellington Plant Sciences BuildingDisconnect har wired electrical desk panels so furniture can be dismantled and removed from 261 Ellington Plant Aciences.7/11/140D-15153
Environmental Health and Safety - 22nd StreetAbate and raze structure EH & S 22nd Street, Convert to parking lot.7/21/140D-15177
ETREC Johnson Animal Research BuildingMetal roof replacement at ETREC Johnson Animal Research Building. (XYZ) (S14)5/22/141D-14440
Facilities Services and Operations BuildingCONTINUATION OF D-14268 Archibus Phase I, II, & III.7/1/142/5/136/30/1430D-15053
Ferris HallCONTINUATION OF D-14375 Classroom Upgrade 2014 - Ferris Hall 5107/1/145/7/1480D-15041
Ferris HallFerris Hall - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/121D-13265
Ferris HallClassroom Upgrade 2014 - Ferris Hall 511 (S14)3/31/145/7/148/25/1460D-14376
Ferris HallCONTINUATION OF D-14374 Classroom Upgrade 2014 - Ferris Hall 5027/1/145/7/1480D-15040
Ferris HallCONTINUATION OF D-14376 Classroom Upgrade 2014 - Ferris Hall 5117/1/145/7/1480D-15042
Ferris HallFerris Hall 212 install 125V outlet.7/1/147/16/147/25/1450D-15100
Frank G. Clement HallFrank G Clement Hall needs Electronic Message Boards - Qty 4, Location: 1 at each elevator lobby 1st floor, Main lobby, & Multipurpose Room. Need Power and data pulled to monitor location. See Lucinda Moore of location in each area.5/23/140D-14445
Fraternity ParkCONTINUATION OF D-13148-- Fraternity Park- Install security cameras for exterior coverage.7/1/147/10/138/22/1475D-15008
Fraternity ParkCONTINUATION OF D-13155-- Fraternity Park - Improve landscaping to bring Park up to Landscape master plan standards.7/1/1480D-15009
Fraternity ParkCONTINUATION OF D-13156-- Fraternity Park - Relocate & rework dumpster locations.7/1/147/10/138/29/1460D-15010
Fraternity ParkCONTINUATION OF D-13157 Fraternity Prak - Install entrance wall/signs similar to other Campus main entrances.7/1/149/16/136/14/130D-15011
Golf Team FacilityCONTINUATION OF D-14361 -- Eradicate fire ants at the Golf Team Facility.7/1/143/21/146/25/1430D-15030
Goodfriend Tennis CenterReplace storm damaged metal roof on GoodFriend Tennis Center. (XYZ)10/18/131D-14195
Greve HallRemoval of closets and built-in dressers in labs 223, 224, 238, 239 and move whiteboards.7/1/140D-15105
Greve HallGreve Hall 2nd floor: hallway doors across from south elevator . Need to make the one closest to 217 open the other way. Right now it opens towards room 217, need to have it open away from 217. Paint hallway area across from same elevator a contrasting color. Are there any limitations on paint color choices?5/6/140D-14427
Greve HallSignage for Greve Hall 2nd floor. See attached for details. (BC)5/8/140D-14428
Health, Physical Education, and Recreation BuildingRemove wood paneling on left wall as you enter room 393 HPER.5/21/140D-14439
Health, Physical Education, and Recreation BuildingCONTINUATION OF D-14301 -- HPER 135. 135C, 135D, 135E: refurbish to accommodate teaching & laboratory space. We`d like to divide the room into adjoining rooms.7/1/141/30/1460D-15027
Health, Physical Education, and Recreation BuildingCONTINUATION OF D-14125 : Renovations to room 113 HPER for Theatre. (S14)6/27/141/15/1496D-15091
Hearing and Speech CenterHearing & Speech Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/121D-13268
Hesler Biology Building and GreenhouseMake improvements to humidification systems for the snake rooms at Hesler Biology.7/17/140D-15166
Hesler Biology Building and GreenhouseRoom 615, insulate ceiling and provide temperature control. (MOE)3/3/110D-11353
Hess HallCONTINUATION OF D-13270 Hess Hall Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)7/1/145/15/147/15/1490D-15066
Hess HallHess Hall needs Electronic Message Boards - Qty 5, Location: Main Lobby Entrance, Outside Eatery Area, K Elevator Lobby, J Elevator Lobby & H Lobby Entrance. Need Power and data pulled to monitor location. See Lucinda Moore of location in each area.5/23/140D-14446
Holt Avenue Apartments Residence HallHolt Ave Apt Res Hall: Electronic Message Board Qty. 1 Location: Housing Office. Need data pulled to mointor location. See Lucinda Moore for location in each area.5/27/140D-14451
Holt Avenue Apartments Residence HallHolt Ave Res Hall: install 3 swings, (2 from Strong Hall Courtyard and 1 stored at Metron Warehouse) in the fron of the Residence Hall. Please see Lucinda Moore974-3606 for exact location and any questions. See Devery Cox 974-5246 to obtain swing.7/7/140D-15132
Howard H. Baker Jr.Center for Public PolicyReplace flat roof sections of Baker Center. (XYZ)8/22/121D-13122
Howard H. Baker Jr.Center for Public PolicyReplace dome and window flashing damaged in hailstorm of 4/27/11 at Baker Center. (XYZ)9/11/120D-13014
Humanities and Social Sciences BuildingCONTINUATION OF D-13231-- Replace steps and ADA ramp for lot 9 at South end of Humanities.7/1/1411/11/138/22/1480D-15012
Humanities and Social Sciences BuildingCONTINUATION OF D-14379 Renovate HSS 65, 112, 113, 114 & 115 and seminar rooms 62, 63 & 64 need Node chairs including a teacher table U ADA tables. Also need power supply for a ceiling mounted projector in room 63 & 65. This is a backup plan if the majo7/1/145/7/148/25/1460D-15045
Humanities and Social Sciences BuildingCONTINUATION OF D-13272 Humanities Repair/replace/recover the Built-up roof due to Storm Damage of April 2011 (XYZ)7/1/143/31/148/15/1480D-15067
Intramurals - Central BuildingCONTINUATION OF D-14362 -- Eradicate fire ants at Sutherland Avenue Intramural Fields.7/1/143/21/146/25/1430D-15031
James A. Haslam II Business BuildingCONTINUATION OF D-13274 James A Haslam II Business Building Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)7/1/143/31/147/31/145D-15068
James A. Haslam II Business BuildingCONTINUATION OF D-14364 Haslam B B 607: construct a floor to ceiling wall located as shown on attached plan & photo (1 & 2). Wall should be constructed in style/type shown on attached # 3. Doors should be centered on wall, of type shown in Attch # 3 & s7/1/145/19/148/1/1410D-15033
James D Hoskins LibraryCONTINUATION OF D-13275 Repai/replace/recover the built-up roof due to Storm Damage of April 2011 (XYZ)7/1/143/31/148/31/145D-15069
Jane and David Bailey Education ComplexCONTINUATION OF D-13276 Jane & David Bailey Education Repair/replace/recover the Built-up roof due to Storm Damage of April 2011 (XYZ)7/1/144/15/148/30/1490D-15070
Jessie W. Harris BuildingInstall new carpet in room 220B Jessie Harris, thoroughly clean baseboards, blinds, walls & window ledges. Paint all walls & windows Ledges. WOULD LIKE WORK COMPLETED BY MIDDLE OF JULY 20147/7/148/6/148/19/141D-15142
Jessie W. Harris BuildingInstall new carpet, throughly clean basebaoards, blinds, walls and window ledges in room 220D Jessie Harris. Paint all walls window ledges.7/7/148/6/148/19/141D-15143
Jessie W. Harris BuildingRenovation of 202, 202C space in Jessie Harris Building. See attached Drawing (not to scale) Preferred completion deadline August 1, 2014.7/7/140D-15139
Jessie W. Harris BuildingThoroughly clean Jessie Harris room 211. Walls, bookshelves, radiator, corners, windows, etc. Also vacuum & shampoo Carpet. (This office should be eligible for free carpet shampoo) (BC)4/7/140D-14401
Jessie W. Harris BuildingCONTINUATION OF D-14373 Classroom Upgrade 2014 - Jessie Harris 1047/1/145/7/1480D-15039
Jessie W. Harris BuildingReplace Flat Roofs. (Crisis) (XYZ) (CC) replaces M-12099.1/16/140D-14297
John C Hodges LibraryCONTINUATION OF D-14295 -- Purchase & install video surveillance cameras & software with correlation with UT Police Department & Facilities Services. Rick Caldwell is the project coordinator on 3,4,5,& 6 floor that is now getting the same cameras install7/1/146/16/148/22/1450D-15026
John C Hodges LibraryContinuation of D-13277: John C Hodges Library - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (C13) (S14)7/1/147/1/148/8/1490D-15147
John C Hodges Librarycontinuation of D-14468: John C Hodges: repairs done that were not storm damage.6/27/146/16/246/30/1410D-15093
John D. Tickle Engineering BuildingRoom 508 John D Tickle building install (2) 20A circuits . Currently working on another request to drop an airline into the room under D-14422. It would be great to coordinate these two work orders together.7/17/140D-15165
John D. Tickle Engineering BuildingMove 220V 30A circuit from 510 to 302 John D Tickle for Servier Rack. WE want to move the server. This will require installation of a power circuit. Please contact Jonathon @ 945-0556 or ceeit@utk.edu.7/7/140D-15137
John D. Tickle Engineering BuildingAt construction meeting on January 15th, the contractor confirmed that the air line services all floors and that the location on the 5th may be in the mechanical room. We need a connection installed in room 508 so that they have access to the air line for a compresor to be used for the lab equipment.4/30/140D-14422
Kappa Alpha Fraternity HouseRenovations to kitchen area @ Kappa Alpha Fraternity. Contact is Gary Gothard, garygothard10@att.net5/6/140D-14426
Kappa Sigma Fraternity HouseCONTINUATION OF D-11394-- Replace roof of Kappa Sigma Fraternity House. Fraternity paying for phase II of roof work summer/fall 2014.7/1/147/15/130D-15003
Kingston Pike BuildingBlanket: Routine Maintenance (FY 2012-2013)7/1/127/1/126/30/130D-13009
Kingston Pike BuildingContinuation of D-14281: Grade parking area SC-40 (gravel portion of lot) at Kingston Pike Building. If Needed add more gravel. There are deep trenches forming in this parking area the need to be addressed. (BC)6/30/140D-15094
Lake Ave Early Learning Ctr (2nd bldg)Continuation of D-13541: Move a playground Gazebo (wooden Structure) from South Doyle High School to the UT Early Learning Center at Lake Avenue. Move cannot take place until the month of June 2013 because in June School will not be in session and children will not be disturbed at South Doyle. We would like the Gazebo moved to 2010/2016 Lake Avenue at the ELC Preschool Playground site. Contact Kathy Kidd for additional information regarding the move and the site it will be moved to. 865-755-2048 (BC)7/1/148/6/135/30/140D-15107
Laurel Residence HallLaurel Residence Hall needs Electronic Message Boards-Qty 3. Elevator Lobby 1st floor, Elevator Lobby 2nd floor & Multipurpose room. Need power and data pulled to monitor location. See Lucinda Moore for location in each area.5/23/140D-14449
Law Complex: George C Taylor WingLaw Complex: George C Talor Wing - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/121D-13281
Law Complex: George C Taylor WingReplace carpet in classroom 132 Law Complex. Work cannot begin until summer classes end in late July, 2014 and must be completed by Auagust 13, 2014. (S14)11/8/137/10/148/7/1475D-14215
Law Complex: George C Taylor WingPaint walls and radiator around elevator at 1R entrance to Legal Clinic/Law School. Work to be completed by 6/30/14.7/7/140D-15126
Law Complex: Law Library and Classroom AdditionLaw Complex: Law Library & Classroom Addition - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/121D-13282
Law Complex: Law Library and Classroom AdditionLaw Complex 3rd floor hallway replace carpet. Would like work completed by 6/30/14.7/7/140D-15125
Lindsey Nelson StadiumLindsey Nelson Stadium - Repair/Replace/Recover the Built-up roof and metal roof due to Storm Damage of April 2011 (XYZ) (S14)11/2/124/15/148/30/141D-13283
Massey HallMassey Hall Needs Electronic Message Boards-Qty 3. Main Lobby & 1 at each Elevator Lobby 1st floor. Need power and data pulled to monitor location. See Lucinda Moore for location in each area.5/23/140D-14448
McClung Tower and PlazaPaint 920 McClung Tower hopefully before fall semester.7/11/140D-15156
McClung Tower and PlazaReplace blinds in MFLL main office and in Department heads office 701 McClung Tower.7/7/140D-15136
McClung Tower and PlazaPAINT 921 McClung Tower hopefully before fall semester.7/11/140D-15155
McClung Tower and PlazaBuild one set of wooden mailboxes to match existing mailboxes in 316 McClung Tower. (S14)5/23/147/14/148/22/140D-14444
McClung Tower and PlazaMcClung Tower - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/121D-13286
McCord HallReplace roof at McCord Hall. (Ins) (Cap/Repl) (Replace east tile, review west tile) (XYZ)5/1/121D-12453
Middlebrook BuildingMiddlebrook Building take down shelves and put in our storage are in room 119P. Patch, repair, and pat the wall in 119P. Install power for wall mounted flat panel monitor in Facilities Planning rooms 119P & 204. Contact Mike Berger @ 974-0599 for details on location of power.7/7/140D-15133
Middlebrook BuildingBlanket: Perform Miscellaneous work as needed (FY 2012-2013)7/1/127/1/126/30/130D-13006
Middlebrook BuildingRelocate north end of fence enclosure to a point south of exit path at Middlebrook Building.5/28/140D-14453
Min H. Kao Electrical Engineering & Computer ScienceMin Kao - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/121D-13289
Min H. Kao Electrical Engineering & Computer ScienceCONTINUATION OF D-13548 -- Add swipe locks to the following room doors with dual access control by CURENT & Police department. Hallway doors into Min Kao rooms 101, 117, 121A, 121B, 124 (2 doors), 125, 402, 411, 412, 530, 531, 532, 533, 554 & 555. Access7/1/143/10/148/15/1475D-15015
Min H. Kao Electrical Engineering & Computer ScienceAdd cooling water for electrical experiments to be used by researchers in room 101, 117, 117A, 117B and 125 Min Kao. Each room shall have a minimum of 1 outlet and 1 inlet controlled via ball valves. Water temperature is not an issue by condensation on pipes should be minimized. The total load will be 50KW or less. Any attached research equipment may use fast acting water valves. Dan Smith has further info. (S14)6/21/137/14/149/12/1420D-13614
Morgan HallRemove and reinstall Kiosk on the first floor. Prepare walls for monitors. Remove sculptures and hang in new location. Refinish & paint wall where needed.11/9/100D-11186
Morgan HallCONTINUATION OF D-14377 Morgan Hall 226 - Classroom Upgrade. Carpet, ceramic boards, paint & audio/visual.7/1/145/7/1480D-15043
Morgan HallMorgan Hall tile Roof Repair. Remove necessary tile and repai damaged sheathing and rafters (XYZ) (Crisis)6/5/141D-14464
Morgan Hallinstall cooling/heating device in room 203 Morgan Hall, repaint room, provide & install appropriate cover for an IDF board (picture attached). This replaces the work request dated 2/7/14 for the same room.4/21/140D-14414
Natalie L. Haslam Music CenterMusic Center Installation of 10 New Glass Boards. (S14) NEW PROJECT 7/1/14 D-150473/31/145/7/148/25/140D-14386
Neyland-Thompson Sports CenterNeyland-Thompson Sports Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/121D-13291
Neyland-Thompson Sports CenterUpgrade exterior security for doors at Neyland-Thompson Sports Center.7/18/140D-15169
Nielsen Physics BuildingNielsen Physics Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/121D-13292
Nielsen Physics BuildingNielsen Physics room 304: Audio/Video ONLY. (S14)3/31/145/7/148/25/1440D-14387
OFF CAMPUS1610 University Ave: replace controller on elevator.6/18/140D-14471
OFF CAMPUSReplace signage for the Holston Unit of ETREC. Dr. Simpson will be glad to answer any questions. Please see all attached.6/4/140D-14458
OFF CAMPUSReplace signs for Plant Sciences. Dr. Simpson will be glad to answer any questions. Please see all attachments!!6/4/140D-14457
Outdoor Tennis Center BuildingOutdoor Tennis Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/121D-13293
Panhellenic BuildingContinuation of D-12455: Replace roof at Panhellenic. (Ins) (XYZ) (S14)7/1/1490D-15082
Pasqua Nuclear Engineering BuildingInstall new carpet in room 216 Pasqua Nuclear engineering. The room dimensions are 10` X 12`.7/21/140D-15174
Pasqua Nuclear Engineering BuildingPasqua Nuclear Engineering Building install radiant heaters above exterior roll up door and double doors.7/7/140D-15144
Perkins Hallsee attached for details of work to be completed in Perkins Hall. This work must be completed before the fall semester starts because they are used for the Senior Design Rooms. Call Toby Boulet at 974-8376 with questions.7/11/140D-15154
Perkins HallReplace roof at Perkins Hall. (Ins) (Cap/Rpl) (Ck Tile) (XYZ)5/1/121D-12456
Philander P. Claxton Education BuildingContinuation of D-12457: Replace roof at Philander Claxton (Crisis)7/1/1490D-15078
Philander P. Claxton Education BuildingContinuation of M-12105: SFMO corrections at Philander P Claxton Education Building.1/3/140D-14278
Plant Biotechnology BuildingPBB room 113: Audio/Video ONLY. (S14)3/31/145/7/148/25/1440D-14385
Plant Biotechnology BuildingReplace window awnings damaged in hail storm on 4/27/11 at Plant Biotech. (XYZ)7/2/120D-13012
Plant Biotechnology BuildingPBB room 160: Audio/Video ONLY. (S14)3/31/145/7/148/25/1440D-14384
Plant Biotechnology BuildingCONTINUATION OF D-13295 Plant Biotechnology Building Repair/Replace/recover the Built-up roof due to Storm Damage of April 2011 (XYZ)7/1/1411/2/126/20/1490D-15072
Pratt PavilionCONTINUATION OF D-13013 Repair or replace window flashing & Lightening rods damaged in storms of 4/25/11 & 4/27/11 at Pratt Pavilion.7/1/149/11/126/20/140D-15059
Presidential CourtProvide ventilation in CO2 tank room of Presidential Court.10/21/135D-14200
Publications and Services BuildingReplace metal roof damaged in hail storm on 4/27/11 at Publications & Services. (Ins) (XYZ)7/2/120D-13028
Racheff ResearchNew sidewalk needed to connect parking surface outside Racheff GH to new entry. Sidewalk to slope from the edge of the parking lot & connect to the existing slab just outside of the new entrance. Old Entrance is now closed due to GH redesign. Additionally a large slab should be added just past the new entrance for various applications. See Attached Photo`s (2) for details. (S14)2/28/147/28/147/30/140D-14336
Racheff ResearchCONTINUATION OF D-12059 --Renovations of Racheff Research to include back-up generator & HVAC controls.7/1/142/11/137/25/1490D-15004
Radiological Safety - Old Cherokee TrailRadiological Safety - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/121D-13297
Radiological Safety - Old Cherokee TrailInstall safety shower & eye wash station in 101 Radiological Safety. I would like to have the water supply plumbed from the Bass Anthropology Building fixture. This idea was proposed in estimate T-10711. Does not need to be connected to sanitary sewer. Install a shower drain pan to collect any water. The fixtures need to be freeze resistant if possible since the building has no heat. Need an instant water heated connected to the system to meet the OSHA tepid water requirements.5/16/140D-14434
Regal Soccer StadiumReplace metal roofs damaged in hail storm on 4/27/11 at Regal Soccer Stadium. (Ins) (XYZ) (S14)7/2/123/17/146/30/140D-13029
Regal Soccer StadiumContinuation of D-13029 : Replace Metal roofs damaged in hail storm on 4/17/11 at Regal Soccer Stadium. (Ins) (XYZ) (S14)7/1/1420D-15079
Regal Soccer StadiumInstall 2-20 Amp circuits @ Regal Soccer Stadium in Room 106. Contact Thomas Moats @ x4-9027.7/18/140D-15172
Science and Engineering Buildingcontinuation of D-13124: SERF 606: Lab renovations, in addition to and not including work for fume hoods. (CC) (SERFHOODS) (C13)7/22/140D-15179
Science and Engineering BuildingContinuation of D-12444: Repairs for 4th floor entrance skylight at SERF. (Crisis) (CC) (C13)7/1/148/13/134/30/1490D-15081
Science and Engineering BuildingSERF 519: Install 2 single phas 240v outlets. Pleas see atached pictures.6/16/147/17/147/22/1450D-14469
Science and Engineering BuildingSERF 338: Power supply, water for chillers & other requirements mentioned in the cut sheets attached for the two new X-ray diffraction instruments. The instruments will arrive in late July.6/18/140D-14472
Science and Engineering BuildingMove an electrical outlet in room 705 SERF.7/15/140D-15160
Science and Engineering BuildingContinuation of D-13300: Replace/Repair built up roof from storm damage (XYZ) (Ins)6/25/145D-15086
Science and Engineering BuildingSERF 410 relocate 110 volt electrical drop to center of room.7/7/140D-15140
Science and Engineering BuildingSERF 522: Glove box nees to be attached to the ceiling exhaust system.6/16/145/1/148/25/1430D-14470
Sherri Parker Lee StadiumCONTINUATION OF D-13030 Replace roof damaged in hail storm on 4/27/11 at Sherri Parker Lee Stadium.7/1/147/2/126/20/1490D-15060
South & East Stadium2014 Football Season - Gameday coverage and cleanup.3/26/1410D-14369
South & East StadiumCONTINUATION OF D-14371 Assist Longent with the installation of the DAS at Neyland Stadium. This will include mainly high voltage and fire alarm work. Cost is not to excee $5000 per Bryan Lord. See Pinnacle workorder # 90408.7/1/1420D-15037
South & East StadiumBlanket: 2015 Football Season - work required to get the stadium ready prior to season start July 20147/9/140D-15149
South & East StadiumInstall 2-20 Amp circuits in one of the video cabinets at the truck dock at Neyland Stadium, Gate 21, Room 156. Contact Thomas Moats @ 4x9027.7/18/140D-15173
South & East StadiumInstall a 4" conduit to supply data services to 8 concessions stands for he students to use their Vol Card.7/2/145D-15115
South & East StadiumReplace siding & window flashing damaged in hail storm on 4/27/11 at Neyland Stadium West Skybox/Club. (XYZ)9/11/120D-13027
South & East StadiumEngineering to review possibility of increasing air conditioning for East Side Sky Boxes. Costs not to exceed $6,000.5/23/147/21/149/26/140D-14443
South & East StadiumScrape existing paint off radiators in East Stadium Hall and paint. Need cost per hour for both scraping and painting, please.7/1/140D-15103
Southeast Precast WarehouseCONTINUATION OF D-13567: Site preparation for new Facilities Services Complex at 2000 Sutherland Avenue.7/1/140D-15111
Stokely Management CenterRenovations to 2nd floor break area at SMC. See attached.6/4/140D-14461
Stokely Management CenterRenovation of Lounge Service Area in SMC 710. See attached for details.3/6/140D-14343
Stokely Management CenterStokely Management Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/121D-13304
Stokely Management CenterRenovate 7th floor SMC. See attached work list and drawings.2/11/140D-14321
Stokely Management CenterInstall 4 duplex electric outlets on wall indicated on attached drawing in rooms 505 B & C. Disconnect modular panels from floor outlet and cap outlet boxes.6/4/147/16/147/21/1490D-14460
Stokely Management CenterInstall elecrtical duplex outlets on columns indicated on attached drawing. Inactivate floor mounted outlets & cap off in room 716 Stokely Mgt. Center. Remove floor mounted telephone plugs.7/7/140D-15135
Stokely Management CenterReplace carpet on second floor of Stokely Management Center.5/1/140D-14423
Stokely Management CenterSMC 5th floor common areas: 1. Repair & repaint walls of common areas as shown on attached plan. Colors TBD by department. 2. Replace carpet in common areas with carpet tiles. Pattern to be chosen by department. Room numbers & door mounted name plates will be replaced with units matched to those used on the 3rd floor SMC. (Marketing Dept) 4. Outside of elevator door will be cleaned and repainted. Common Areas are 599, 599A,B,C,D; 527, 521B, 505A,B,C. Tiffany Shuler will assist the department with paint & carpet colors.12/9/130D-14256
Student Aquatic CenterCONTINUATION OF D-13305: Student Aquatic Center - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ) (C13) (S14)6/25/1411/2/126/23/1490D-15085
Student Services BuildingStudent Services Building needs Electronic Message Boards-Qty 1. Housing Office. Need power and data pulled to monitor location. See Lucinda Moore for location in each area.5/23/140D-14450
Student Services BuildingCONTINUATION OF D-14280 Install drain and pour concrete floor in areaway at Student Services. Trim bushes down to knee height. Install brick curbing around areaway. (C13) (Continuation of M-14081)7/1/147/21/148/1/140D-15054
Student Services BuildingInstall electric screen in ceiling of 115G Student Services Building, Provide power for ceiling mounted projector. Screen & projector will be provided by ITES. Contact Mike Berger for details.7/1/147/16/147/25/1450D-15101
Student Services BuildingStudent Services Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/121D-13308
Temple HallCONTINUATION OF D-14090: Facilities Services support for Phase II renovations (C13)7/1/147/1/134/25/1496D-15114
Thompson-Boling Assembly Center and ArenaBlanket: HVAC Water Treatment (FY 2012-2013)7/1/127/1/126/30/130D-13007
Thompson-Boling Assembly Center and ArenaReplace old TV monitor & install 37" monitor (ceiling Mount) in front of command post. We have possession of 37" replacement monitor. Will need appropriate mount to secure to overhead structure.7/16/140D-15161
Thompson-Boling Assembly Center and ArenaAssist Longent with the installation of DAS at Tompson Boling Arena. This will include mainly high voltage and fire alarm work. Cost not to exceed $5,000 per Bryan Lord. See Pinnacle work order # 92324.7/15/1410D-15159
Thompson-Boling Assembly Center and ArenaInstall 2-20 Amp circuits in the truck area @ Thompson Boling Arena, Room 129. Contact Thomas Moats @ x4-9027.7/18/140D-15171
Thompson-Boling Assembly Center and ArenaChange 30 amp to 50 amp circuit in the Pizza Hut Station at TBA. Also, another circuit needs to be added for McAlister`s - 120 V 3-phase.7/1/147/14/147/31/1430D-15102
Thompson-Boling Assembly Center and ArenaBlanket: Miscellaneous work as needed (FY 2012-2013)7/1/127/1/126/30/1390D-13003
Tom Black Track Facilities BuildingATTN: Roger McDonald, please fix the light pole at Tom Black Track/LaPorte Stadium. Contact Brad Hallums 809-39247/9/140D-15152
University Commons Vol ShopCONTINUATION OF D-14086 Renovations to Bookstore for University Commons.7/1/147/1/148/1/140D-15023
UT Welcome CenterCONTINUATION OF D-13620 : Additional improvements to the UT Welcome Center including exterior repairs and painting, cameras, awning, etc. (C13)6/24/1410/5/1385D-15083
Veterinary Teaching HospitalVet Teaching Hospital room A-113-E reinforce a wall so that it can hold a 60" flat screen Television, Paint over the reinforcement , add an electrical outlet to supply power to the TV; outlet should be behind the TV to hide the wires. Needs two estimates, one that includes electrical and one that does not include electrical.7/1/140D-15104
Veterinary Teaching HospitalVeterinary Teaching Hospital - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/121D-13311
Volunteer HallVolunteer Hall needs Electronic Message Boards - Qty 4, Location: Front Desk, 1st Floor Lobby, 4th Floor Lobby & 6th Floor outside Multipurpose Room. Need Power and data pulled to monitor location. See Lucinda Moore of location in each area.5/23/140D-14447
Volunteer HallCONTINUATION OF D-14367 New storefront doors to be installed on all exterior doors leading onto the courtyard at Vounteer Hall. Please Contact Lucinda Moore 865-974-3606 with any questions.7/1/146/2/148/15/1490D-15035
Walters Life Sciences BuildingPaint walls in rooms F319, F317 & M407A WLS. Department would like to select color.7/17/140D-15168
Walters Life Sciences BuildingWalters Life Sciences Building - Repair/Replace/Recover the Built-up roof due to Storm Damage of April 2011 (XYZ)11/2/121D-13313
Walters Life Sciences BuildingReplace carpet in M409 WLS & office suite.7/7/140D-15129
Walters Life Sciences BuildingPaint M409 WLS & office suite.7/7/140D-15128
Walters Life Sciences BuildingMake improvements to humidification systems for the animal facility at WLS.7/17/140D-15163
West Skybox AdditionCONTINUATION OF D-14366 Renovations to rooms 501 & 502 to create one space in West Skybox of Neyland Stadium.7/1/145/2/148/1/1470D-15034
William Bass Anthropology Center1: 8` x 10` concrete pad to be installed behind William Bass Anthropology. Area has been marked and is to be dug out, leveled, graveled, the concrete pad installed. Electrical to be hardwired from concrete foundation to the Bass Building. Dr. Dawnie Steadman has submitted several w/o `s for this request.6/20/147/1/147/25/1495D-15077



 